Loading…
Loading…
8,252 results • Best match
Drilling of 06 No. 450/550 mm Dia bore upto Depth 210 Mtr in Dist. Azamgarh
Drilling of 08 no. 450/550 mm dia bore upto depth 210 mtr in Distt Azamgarh
Drilling of 03 no. 450/550 mm dia bore upto depth 180 mtr in Dist. Jaunpur
Construction and boring work different ward at Nagar Panchcyat.
Drilling of 07 no bore size 450/550 mm for TW const in Dist Mau
Drilling of 2 no 450/550 mm dia bore by using direct rotary/reverse rig machine upto depth 120 MTr for const of STW in Dist Ballia
Drilling of 04 No. 450/550 mm dia bore upto depth 210 mtr in Dist. Mau.
Drilling of 06 no 450/550 mm dia bore by using direct rotary/reverse rig machine upto depth 150 Mtr for const of STW in Dist Chandauli
RIBOR WORK
ROUTINE ELECTRICAL MAINATENANCE OF L.T. LINES, SERVICING MAIN L.T. SWITCHGEAR AND DRINKING WATER TUBE WELL OF 400KV S/S DIVISION COLONY UNDER ELECTY. 400KV S/s DIVISION, SULTANPUR.
PIPE LINE EXTENSION 5.47 Km AND HOUSE CONNECTIONS Works 298 Nos 1 No NEW TUBE WELL IN NEW EXISTING WS LINES with all materials Labour t p etc
PIPE LINE EXTENSION 11.25 Km AND HOUSE CONNECTIONS Works 1836 Nos 1 No Rebore Tube well IN NEW EXISTING WS LINES with all materials Labour t p etc
Construction of Over Head Tank Pump house Staff quarter Boundary wallgate Site development Supply laying jointing of risingmain distribution system and construction of tube well including PLC ETC
PIPE LINE EXTENSION 2.77 Km AND HOUSE CONNECTIONS Works 302 Nos 1 No Rebore Tube well IN NEW EXISTING WS LINES with all materials Labour t p etc
Determination of Aquifer Parameters by conducting Long Duration Pumping Test at tube well sites in District-Moradabad, Bijnor and Sambhal under jurisdiction of Ground Water Department Division-Moradabad
Supply and Laying of 25 sq. mm. cable for Tube well Pump installed in beside main gate of Shakti Bhawan HQ and Other Electrical work in SBE Lucknow
Construction of OHT, Tube Well, Supply, Laying and Jointing of Rising main and distribution system, making of house connection and appurtenant work at Sarai Harnarayan in Aligarh City
HAND PUMP DHP 6002-21-81, GASKET CYLINDER HEAD MLS, HOSE HW 1AT 6X400 DKL-DKL M 14X1.5, CLUTCH BOOSTER REPAIR KIT, WIPER RUBBER BLADE
Supply of Peagravel
Supply of Peagravel At Dhampur Distt Bijnor
Modernization work of Approach channel from Km. 0.000 to 0.150 Km. at Khurahat pump canal in District Mau.
Supply Pea Gravel
Supply Of Pea Gravel
Supply Of Pea Gravel
SUPPLY OF PEA GRAVEL AT MORADABAD
NAGAR PANCHAYAT NAGRAM ME 20 ADAD INDIA MARKA 2 HANDPUMP KI APURTI AWAM STHAPNA KA KARYA
NAGAR PANCHAYAT RATAUL MAI VIBIN STHANO PER 10 NAG INDIA MARK-2 HANDPUMP REBORE KA KARYA
NAGAR PANCHAYAT RATALU ME VIBHINN STATHANO PAR 19 NAG INDIA MARK-2 HANDPUMP REBORE KA KARYA
NAGAR PANCHAYAT PARASPUR SEEMANTARGAT VIBHINN WARDO MEIN LAGE INDIA MARKA KA HANDPUMP KA REBORE MARAMMAT KARYA
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - NPP Gauriganj; Handpump Reparing; Service Provider
SUPPLY OF 32 MM 3 MTR LONG CLASS B ISI MARK STEEL TUBE, SUPPLY OF 12 MM 10 FIT LONG CLASS B CONNECTING ROD, SUPPLY OF BALTI BRASS ISI MARK FOR INDIA MARKA 2 HAND PUMP, SUPPLY OF CHAK VALVE BRASS ISI MAKE INDIA MARKA 2, SUPPLY OF WASHER LEATHER, ... OF HAND PUMP MACHINE ... OF HAND PUMP HATHA, ...
REPAIR OF DAMAGE CHHAJJA (1ST, 2ND AND 3RD FLOOR), DRAINS AT GPRA COLONY POCKET-I AND POCKET-II AND MAKING CONNECTION OF BOREWELL PIPELINE TO DIRECT WATER SUPPLY LINE IN KENDRANCHAL COLONY POCKET-I SULEM SARAI, PRAYAGRAJ, UP Subwork/Packages: MAINTENANCE WORK
Construction of Administrative Block and Store Block i/c Internal EI & Fans Fire fighting, Fire Alarm, VRV System, Sub-Station, Development work & Horticulture work at RTC CRPF Amethi (U.P.) (SH-: Providing submersible pump set in newly developed ... developed borewell .) ...
Repairing of Existing CC Road from Main Gate to Staff Quarters and Construction of CC Road from Second gate to Assembly ground and Construction of Borewell for Water Supply & Fire Fighting System of School Building at Kendriya Vidyalaya, BLW, Varanasi.
Construction of Tubewell and SF of 01HP Submersible Pump SITC of 2.00 KW off grid solar plant and SITC of solar street light in Hatpath Sultanpur Kheda bazar Under Krishi Utpadan Mandi Samiti Raibarely.
The pipeline extension work in Ward No. 07 in Bhadsa is from the tubewell through the houses of Balli Yadav, Ali Masjid, and Rajesh Rai to Kausar and Auliya Masjid and the Yadav Basti
Construction of SGR Building with Billing Center, Boundary Wall, Gate, Road, Culvert, Earth Filling, Tubewell and other Misc. Civil Works at proposed 33/11 k.v. Sub Station for Shifting of Hussainganj (Rural) District Sitapur
Construction of 1 no. Rebore Tubewell by D.C./R.C. Rig Machine and its other associated works complete in Saharanpur city under Deposit Work (15th Finance Commission) , Ward No. 66 Kamela Colony (Slaughter House), Saharanpur
Construction of 1 no. Rebore Tubewell by D.C./R.C. Rig Machine and SITC of Pumping plant and its associated works at Ward No. 61 Azad Colony in Saharanpur city under Deposit Work , Distt- Saharanpur
Construction of 01 no. Rebore Tubewell by D.C./R.C. Rig Machine and its other associated works complete in Saharanpur city under Deposit Work (15th F.C.) , Distt- Saharanpur at Ward No. 70 Gado ka Chowk.
Ward No. 10 Construction of covered drain and CC road from Central Pathology via Raja Gond house on the canal to the Police Station boundary, and from Santosh Gupta house to Rajjanm Yadav tubewell.
Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Balpur Pakaria, Maharajnagar Under Krishi Utpadan Mandi Samiti Biswa. Sitapur
Masodha Block ke antargat Salarpur Nahar Gramsabha Vaya Suresh Gupta ke Ghar hote hue Kamaljeet ke Tubewell tak sampark marg evam Bikapur Block ke antargat Niyai Harijan Sampark marg par Patch marmmat ka karya
Construction of 01 no. Rebore Tubewell by D.C./R.C. Rig Machine and its other associated works complete in Saharanpur city under Deposit Work (15th Finance Commission) , Distt- Saharanpur at Ward No. 14 Indra Colony
Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Asoha, Kurmi Gadhewa Under Krishi Utpadan Mandi Samiti Purwa, Unnao.
Construction works of 04 Nos Rebore Tubewell by RC Rig Machine in Kunda Ward 6 Multan Nagar Ward 15 Khatta Road Ward 34 and Kasampur Pahari Ward 9 Nagar Nigam Meerut under deposit programme
Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Sherpur, Katka and Katiyara Under Krishi Utpadan Mandi Samiti Hargaon.
Construction of SGR Building with Billing Center, Retaining Wall cum Boundary Wall, Gate, Road, Culvert, Earth Filling, Tubewell and other Misc. Civil Works at proposed 33/11 k.v. Sub Station Chhauch (New) District Lakhimpur
Construction of 1 no. Rebore Tubewell by D.C./R.C. Rig Machine and its other associated works complete in Saharanpur city under Deposit Work (15th Finance Commission) , Ward No. 55 Mission Compound Mandir Parisar, Saharanpur
Laying and Jointing of Distribution system House connection for retrofitting including rebore of tubewell all required works at site as per instruction of Beerapur water supply scheme Block Shivgarh District Pratapgarh under JJM Programme