Loading…
Loading…
8,256 results • Best match
Construction works of 04 Nos Rebore Tubewell by RC Rig Machine in Kunda Ward 6 Multan Nagar Ward 15 Khatta Road Ward 34 and Kasampur Pahari Ward 9 Nagar Nigam Meerut under deposit programme
Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Sherpur, Katka and Katiyara Under Krishi Utpadan Mandi Samiti Hargaon.
Construction of SGR Building with Billing Center, Retaining Wall cum Boundary Wall, Gate, Road, Culvert, Earth Filling, Tubewell and other Misc. Civil Works at proposed 33/11 k.v. Sub Station Chhauch (New) District Lakhimpur
Construction of 1 no. Rebore Tubewell by D.C./R.C. Rig Machine and its other associated works complete in Saharanpur city under Deposit Work (15th Finance Commission) , Ward No. 55 Mission Compound Mandir Parisar, Saharanpur
Laying and Jointing of Distribution system House connection for retrofitting including rebore of tubewell all required works at site as per instruction of Beerapur water supply scheme Block Shivgarh District Pratapgarh under JJM Programme
WARD NO. 4 MO SADARPUR ME ANIL MAURYA/ASHOK MAURYA KE PLAT SE BHAGOTI PRASHAD KE TUBEWELL AND RAILWAY CROSSING SE RAJARAM KE MAKAN/KADANPUR VILLAGE TAK, DAMAR PICH ROAD NAWINIKARAN KA NIRMAN KARYA.
Bequtification of green belt of C-block of Madhuban-Bapudham yojna, planting of 379 saplings, installation of submersible tubewell and water line for grass irrigation and barbed wire fencing with RCC poles for security.
Construction of CC road from tubewell of Paramhans Yadav in Gram Sabha Basupar of development block- Ajmatgarh via field of Devendra Yadav to the field of Phoolchand Yadav via Dalit Basti. (Length- 650 m)
Facility Management Services - LumpSum Based - HOUSE KEEPING DHOBI MESS WAITER COOK GROUND MAN ELECTRICIAN DOMETRI WAITER MESON COPPLER MAALI CARPENTER TAILOR SECURITY GUARD TUBEWELL OPERATOR WELDER FARRASH WORK PLUMBER WORK AND DRIVER; DRIVER HOUSE..
Tubewell operation and Maintenance of Tubewell AND Water Supply Pipe Line etc. At Hydel Colony, Manduadih, Varanasi.
civil work
AS PER BOQ
CONSTRUCTION WORK
AS PER BOQ
AS PER BOQ
SEE IN TECHNICAL BOQ
AS PER BOQ
WORK
WORK
WORK
REBOR WORK
WORK
CONSTRUCTION WORK
ADHISTHAPAN KARYA
ADHISTHAPAN KARYA
ADHISTHAPAN KARYA
ADHISTHAPAN KARYA
ADHISTHAPAN KARYA
ADHISTHAPAN KARYA
ADHISTHAPAN KARYA
ADHISTHAPAN KARYA
ADHISTHAPAN KARYA
ADHISTHAPAN KARYA
ADHISTHAPAN KARYA
CONST. OF OHT, CWR, PUMP HOUSE, BOUNDARY WALL, GATE, SITE DEVELP., REPAIRING OF OHT, SUPPLY AND LAYING JOINTING OF RISING MAIN, DISTR. SYSTEM, TUBE WELLS, PLC SCADA AUTOMATION, COMMISSIONING, TESTING, TRIAL RUN, HAND OVER TO NPP ALIGANJ DISTT. ETAH
Lever Window Dropper, Deleted Fuel Flexible Pipe, HP Hose 3 4, Hand Pump DHP 6002 21 81, Tank Assy Fuel, Circuit Breaker Bty Cut off Switch
Drilling of Borewell for submersible pumps along with installation of submersible pump and making connection etc at 03 nos. different locations such as V.C. Residence 3 HP 150 metre deep, Near Ashoka Boys Hostel Pond 5 HP 150 metre deep
Installation Works of BOREWELL WARD 26, 19 IN NPP LONI
Installation Works of BOREWELL WARD 55, 43 IN NPP LONI
Installation Works of BOREWELL WARD 51, 37 IN NPP LONI
Installation Works of BOREWELL WARD 23, 07 IN NPP LONI
Installation Works of BOREWELL WARD 5, 27 IN NPP LONI
GI Pipe 1.25 10 Foot, GI Sariya, Ball Boaring, Chain, Washer Kit, Dura, Cylinder Asembly, Connecting Rod Socket, Chain Bolt, 3.5 Soot Bolt, Dolchi Set, Handpump Rinch 18, Kauwa Plas, Handpump Rinch 12, Pana 18 and 19 No, Chheni, GI Socket
GRAM ABBAS NAGAR TEHSIL TANDA GATA NO. 118, 119, 120, 121 RAKBA 1.104 ME THOS APSHISHT PRABANDHAK ME MATERIAL RECOVERY FACILITIES- SHED/ DEEWAR/ INTERLOCKING ROAD/ TUBEWELL/ TOILET BLOCK/ MS GATE/ CC ROAD AADI KARYE
SITC works of 03 Nos Pumping Plant over Rebore Tubewell along with their allied works in Shastrinagar I Block Shergarhi Saket Sports Colony and Ganga Nagar J P Pocket Nagar Nigam Meerut under deposit programme
Construction of 1 no. Rebore Tubewell by D.C./R.C. Rig Machine and its other associated works complete in Saharanpur city under Deposit Work (15th Finance Commission) , Distt- Saharanpur at Ward No. 43 Shah Noor Ji.
Strengthening of W/s (Errection of Re-boring, C/o Foundation and P/F Pumping Plant at various Sectors) Noida. (Re-boring at 50B tubewell 05 No. Submersible at UGR-51,50,43, Mahamaya School and 47)
Estimate for Construction of Tubewell 900 LPM, Installation of 15 HP Submersible Pump with Chlorinating Plant and Pump House Size (3.00 3.6 3.00) m Cum chlorinating Room Size (1.8 2.5 3.00)m. in ward 12
Construction of 1 no. Rebore Tubewell by D.C./R.C. Rig Machine and its other associated works complete in Saharanpur city under Deposit Work (15th Finance Commission) , Distt- Saharanpur at Ward No. 27 Prem Puri Colony
Drain repair, cover work and C.C. road construction work as per requirement from Govind Sahu s house in Ward No. 25, Ashtabhuja Colony through the tubewell of Kanshiram Awas to the transformer of Kanshiram Awas.