Loading…
Loading…
8,232 results • Best match
Rebore of India Mark II Hand pumps in Nagar Palika Amroha Area.
Boaring of India Mark II Hand Pumps by Palm and Pressure Vidhi.
Nagar Palika Ujhani m Payjaal Aapurti Vayvasta Hetu 40 Nag Kharab India Marka 02 Handpump Ko Rebore Karke Punah Adishatpana Ka Karya
Line no 05 Mahanagar seema ke Antargat Ethapit vibhinn Ethano per 08 nag india mark II handpump ko rebore karne ka karye.
Ward No 13 me vindhyanchal Sharma ke makan se jahur ke makan hote huye indradhar mani ke handpump tak nali nirman karya
wad no 06 composite vidyalay sanjay nagar me chhat marmmat taielsikaran diviyang sauchalay mutralay handpump jal nikashi and kitchen marmmat ka karya
S.I.T.C of India Marka II Handpump, at different places in Block-Cholapur in District -Varanasi, under vidhan mandal kshetra vikas nidhi Programme
Financial Year 2026-27 Ke Liye Many Wards mein Staphit 20 Nug India Mrk II Handpump Ko Rivore Karaye Jane Ka Work
Installation of 01 No. New Borewell with pump at Kendriya Vidyalaya Aliganj Lucknow Subwork/Packages: Main Work
CONSTRUCTION OF 1 NO. BOREWELL IN CPWD STAFF COLONY, JAYANTIPUR, SULEM SARAI, PRAYAGRAJ. Subwork/Packages: CONSTRUCTION WORK
India Mark II Hand Pump Machine Heavy Complete 42 Kilogram weight, 32 mm G I Pipe B Class 03 Meter Pice 07 Kilogram weight, Connecting Rod 12 mm 03 Meter Pice 2 point 5 Kilogram weight, Cylinder Assembly Heavy Duty with Short Connecting Rod with 1 point 5 Feet, G I Socket 32 mm B Class, Ball Bearing 6204 NBC SKF, Chain with Coupling 700 Gram weight, Excel Heavy 300 Gram weight, Sleeve Cylinder S S 400 Gram weight, Plunger Assembly C I 790 Gram weight, Upper Valve Guide C I with Rubber Ring 80 Gram weight, Lower Check Valve Guide CI with Rubber Ring 410 Gram weight, PVC Cup Washer, Rubber Washer Cylinder Cap Nylon, Head Complete with Handle Bearing Excel Chain 17 PONIT 5 Kilogram weight, G I Toti 6 POINT 5 Kilogram weight, Handle Heavy Duty 8 POINT 5 Kilogram weight
Drilling of 01 No. bore of 450/600 mm for Reconstruction of Tubewell in Dist. Ghazipur.
Drilling of 10 No. Bore of Size 450/600mm for Reconstruction of Tubewell in Dist. Jaunpur.
Drilling of 11 No. bore of 450/600 mm for Reconstruction of Tubewell in Dist. Varanasi.
NP BAHADURGANJ WARD N 8 MEGHA RAJBHAR KE GHAR KE PASS 5 HP TUBEWELL BORING ADHISTPAN KA KARYA
Dhruv kutee naale ke paas nagar panchayat talbehat mein, jal aapoorti hetu deep bor sabamarsebale pamp ke saath evan G.I. pipe dvara pipe line bichhane ka kaary.
SITC of 5.0 HP submersible pump set in New borewell at TE ORAI, BA Jhansi.
SPL REP/ REPLACEMENT OF BOREWELL AND WORK SERVICES FOR SDR INSTALLATION AT AF STN GORAKHPUR
const of water harvesting unit with borewell method with two bore in nagar panchayat madrak
Providing 1.0 HP new submersible pump set in new borewell at PO Gunnaur, Bareilly Region.
REPAIR AND REPLACEMENT OF BOREWELL IN DOMESTIC AREA AT AFS HINDAN GHAZIABAD DG 2023 24
Installation of New Borewell with pump in Kendriya Vidyalaya Aliganj Lucknow. (SH: Providing submersible Pump)
REPAIR AND REPLACEMENT OF BOREWELL IN TECHNICAL AREA AT AFS HINDAN GHAZIABAD DURING 2024 25
REPAIR AND REPLACEMENT OF BOREWELL IN DOMESTIC AREA AT AFS HINDAN GHAZIABAD DG 2023 24
Custom Bid for Services - COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT OF 200 AND 50 KVA DG SET AND ONE AND HALF HP SUB PUMP QTY 03 NOS AND TUBE WELL 25HP AT TCL HQTR AS PER ATTACHED ANNEXURE A
Operation and maintenance of water line, water connection and current lay water line connect of tube well in different villages (Chachula, Daudpur, Hatewa, Khanpur, Salempur Gurjar, Roshanpur, Ladpura and Kasna) (Package-6) for three years, Gr. Noida
EDD-Ist, Chandauli, under Deposit Scheme and MLA Fund, Mr. Ashish Nigam, Mr. Raunak Aggarwal, NKC Project, EE, Tube Well Section, Chd. and Vill.-Ben (Tiyari), Vill.-Dadiya. , Dist.-Shahabganj, Chd., Electrification work at the above places.
Work of laying 115 pipelines of 90 mm diameter from Sohil house to Nazim house near Ward No. 68 Maud Ghalib Nagar tube well, from Gauhara house to Atar house and to the driver house in Link.
REPAIR MAINT TO UNSV GI AND CI PIPE AND CHLORONOME PLANT PUMP SET AND BOREWELLS AND REPAIR AT WATER SUPPLY INSTALLATION UNDER GE AF TECH AREA AGRA
Water Harvesting work on 50 handpumps
SUPPLY HAND PUMP REPAIRING MATERIAL
TUBEWELL OPERATION AND UPKEEPING OF INSPECTION HOUSE SITUATED AT MOHADDIPUR DISTRICT GORAKHPUR
Mo Rafaiyatganj me Near Daswa Sanskar Mini Tubewell ka Adhisthapan karya
Deep tube well boring at SGPGI, Lucknow
Line No 40 - Mahanagar ke sima ka antergat stapit India mark II hand pump anurakchad hat planjer valve assembly brass 1300 nug abem chack valve brass 1300 nug ke apurti as per tander notice
Drilling of 12 No 450/550 mm dia bore for const. of tubewell depth 120 Mtr in Dist Ballia.
Drilling of 12 No. bore of size 450/550 mm for Construction of Tubewell in Dist. Varanasi.
Drilling of 03 No. bore of size 450/550 mm for Construction of Tubewell in Dist. Azamgarh.
Drilling of 03 No. bore of size 450/550 mm for Construction of Tubewell in Dist. Jaunpur.
Drilling of 01 No. bore of size 450/550 mm for Construction of Tubewell in Dist. Mau.
Drilling of 03 No. bore of size 450/600 mm for Reconstruction of Tubewell in Dist. Jaunpur.
Drilling of 06 No. Bore for Construction of State Tubewell upto Depth 180 mtr in Dist. Jaunpur
Drilling of 04 No. bore of size 450/550 mm for Construction of Tubewell in Dist. Ballia.
Drilling of 03 No. bore of Size 450/550 mm for Construction of Tubewell in Dist. Ghazipur.
Drilling of 03 No. bore of size 450/550 mm for Construction of Tubewell in Dist. Mau.
Drilling of 10 No. of Bore of Size 450/550mm for New Tubewell Construction in Dist. Varanasi
Drilling of 04 No. bore of size 450/600 mm for Reconstruction of Tubewell in Dist. Ghazipur.
Drilling of 02 No. bore of size 450/550 mm for Reconstruction of Tubewell in Dist. Jaunpur.
Drilling of 02 No. bore of size 450/550 mm for Construction of Tubewell in Dist. Ballia.
Drilling of 06 No. Bore for Construction of State Tubewell upto Depth 180 mtr in Dist. Ghazipur.