Loading…
Loading…
68 live41 closing this weekmost from E-IN-C BRANCH - MILITARY ENGINEER SERVICES and Public Works Region
68 results • Best match
Installation of Concertina Coil fencing on existing boundary wall on around 300m in length in the campus of PM Shri JNV Kshetra Mauli Satara, Maharashtra
Construction of compound wall at west side Grade-1 labours house AT 261/00 to349/00 m length, area at T.F.Ro. Chavindra, Taluka-Bhiwandi, District-Thane.
Making of boundary wall for complete isolation near the edge of haul road at 11 KV Kawadi Substation under New Majri Sub Area of Majri Area.
Construction of compound wall at 437/00 to 525/00 m length right side area at T.F.Ro. Chavindra, adjacent to vermicompost production unit. Taluka-Bhiwandi, District-Thane.
Construction of compound wall at 174/00 to 261/00 m length adjacent to the vermicompost production unit, right side, area at T.F.Ro. Chavindra. Taluka-Bhiwandi, District-Thane.
Construction of compound wall at west side adjacent to Grade-1 labours house area of T.F.Ro. Chavindra, at 349/00 to 437/00 m. Taluka-Bhiwandi, District-Thane.
REPAIRS TO COMPOUND WALL, CHAIN LINK FENCING AREA / STORM DRAINAGE, TRAVERSE WALL AT TECHNICAL AREA OF ARDE, JCDA, DSC LINE, GOL MARKET UNDER GE (I) RnD PASHAN, PUNE
M and R to Barvi Water Works Repairing of a Compound Wall at Katai Naka Flow Meter Room and Stockyard to prevent water logging and safeguard adjoining structures
Construction of Compound Wall to avoid encroachment at Premises of 33 KV S/Stn Parner Premises Under Jurisdiction of O & M Division UCR of O&M Circle Ahilyanagar.
REPAIRS TO BOUNDARY WALL, HARD STANDING, STORM DRAIN, KERB STONE, PARKING SHEET AND OTHER MISC WORKS IN AOR OF AGE B/R (WEST) UNDER GE (WEST) COLABA MUMBAI
REPAIR TO PATH, DRAIN, GATES, BOUNDARY WALL, AND PLAIN CEMENT CONCRETE HARD STANDING, CHAIN LINK FENCING AND OTHER CONNECTED WORKS IN OFFICERS MD ACCN AT VAYUSENA NAGAR NAGPUR
REPAIRS TO PCC HARDSTANDING, BOUNDARY WALL, REPLACEMENT OF DAMAGED PRECAST RCC SLAB AND MANHOLE COVER AND OTHER CONNECTED MISC B/R ITEMS AT MO (MB) GHATKOPAR UNDER GE (NW) BHANDUP
A) Improvement to existing boundary wall of Kalwa Carshed (2.5km)B) THK - Repairing works and re-tarring of bitumen roads at 12th Battalion Campus at Thakurli(East) under ADEN(WKS)KYN
Construction of compound wall at 0/00 to 88/00 m length, area of T.F.Ro. Chavindra, right side of main entrance to west side adjacent to labours house. Taluka-Bhiwandi, District-Thane.
REPAIR TO SEWAGE SYSTEM, DRAIN, PATHWAY, MANHOLE CLEANING, BOUNDARY WALL, FENCE, HARD STANDING, INTERLOCKING, CHEQUERED TILES ETC AT HQ WNC AND WNC UNITS UNDER AGE B R-II OF GE (NW) KUNJALI, COLABA, MUMBAI
As per tender documents
Construction of Platforms, Earthwork/ blanketing in formation/cutting, Retaining Wall & Drain, RUB, FOB, Minor Bridge (Br.No.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), Station building(G+1) and station building compound wall, Water tank, toilet, RUB Pump house, Road, etc. work and Dismantling and Track Works for Nimbhora Yard Remodelling, including Ballast Supply in connection with BSL-KNW 3rd and 4th line (131km) project of Central Railway. (Two packet System).
Provision of Infrastructure Development Works (Earthwork in Embankment, Bridge Extension, Retaining Wall cum Boundary Wall, Road Works, etc.) in connection with Development of Land for Proposed POH cum New EMU Maintenance Depot at Vangaon