Loading…
Loading…
3,873 results • Best match
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Panijharia of Mahulia G.P under Chandabali block
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Bagamara of Geltua G.P under Bhadrak Block
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Barakana of Basantia G.P under Bonth Block
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Kantia of Ganijang G.P under Bonth Block
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Jirina of Adia G.P under Bonth Block
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Adhuan of Adhuan G.P. under Basudevpur Block
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Bhabanibindha of Bental G.P under Bhadrak Block
REPAIR REPLACEMENT OF CHAINLINK FENCING BARBED WIRE FENCING CONCERTINA COIL COMPOUND WALL ETC AND REPAIR REPLACEMENT CLEANING TO SEWAGE LINES MANHOLES CULVERTS COVERED DRAINS SEPTIC TANKS AND SOAKAGE WELLS
INTERNAL CC ROAD COMPOUND WALL
CONSTRUCTION OF BOUNDARY/ COMPOUND WALL
INTERNAL CC ROAD COMPOUND WALL
Construction of internal roads, compound wall, Tile flooring with provisions of W/S, S.I with PH Fitting to the newly constructed single storied residential Building at Gokhibaba Leprosy colony in ward no. 67.
Site Development and Construction of Compound Wall on both sides of the proposed New Link Road from NH-16 to the Eastern side of the Cuttack Railway Station for the year 2023-24.
MISC REPAIR TO RCC JALI, FENCING, MS GATES, DRAINS, FOOT PATH AND COMPOUND WALL AND CERTAIN MISC WORK IN MOHAN NAGAR AND PRAKASH NAGAR AT CHANDIPUR UNDER AGE B AND R-I CHANDIPUR
MISC REPAIR WORKS TO RCC COVER SLAB, STORM WATER DRAIN, HARD STANDING, PARKING TILES, RCC JALI, FANCING, BARBED WIRE, CONCERTINA COIL AND COMPOUND WALL ETC IN TECH AREA UNDER AGE BR I CHANDIPUR
Construction of New Compound Wall with Construction of 2 Nos of Security Room and Fixing of 3 Nos of Sliding Entrance Gate for office of the JDM, Joda for the year 2021-22
MISC REPAIR WORKS TO RCC COVER SLAB, STORM WATER DRAIN, HARD STANDING, PARKING TILES, RCC JALI, FANCING, BARBED WIRE, CONCERTINA COIL AND COMPOUND WALL ETC IN TECH AREA UNDER AGE BR -I CHANDIPUR
Construction of pump house, Compound wall, 0.50 Lakh ESR, dosing chlorinator ,Laying of pipe line its ancillary work with 5 years Operation Maintenance for PWS to GHADEIBANDHA under NUAGAON block (BASUDHA 2 Village)
Design, Construction, Testing and Commissioning of 0.80 ML capacity RCC ESR with 25.00Mtr Staging, Construction of Compound wall and Pump house in Behera Sahi Pump House at Nayapalli in Ward No-37, Bhubaneswar
Construction of Boundary wall, RCC drain with road, FIC cum FRS, Internal approach road, Toilet block, Garbage bin, Cattle shed 4 nos and water supply arrangement at Kokasara market yard, under RMC Mukhiguda.
Construction of proposed Live stock complex Office Complex Utility Complex Boundary wall Internal Road and Approach Road for Holistic Development of Sakhigopal farm for Coconut and Intigrated farming system Research under RKVY Composite
Washing and painting of Durga puja mandap and surrounding boundary wall at Dera colony and kali mandap at Handidhua colliery with up-keeping work under Talcher colliery, Talcher Area for the year-2025.
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Baikunthapur of Brahmanigaon G.P under Basudebpur Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Nachhipur of Bania G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Taragana of Berhampur G.P under Bhadrak Block
Retrofitting of Rural Piped Water Supply Scheme to Village Kaupur including laying of distribution pipe line construction of pump house, boundary wall, OHT and Internal Electrification etc of Kaupur G.P. under Bhadrak Block
Retrofitting of Rural Piped Water Supply Scheme to Village Daipur including laying of distribution pipe line, construction of boundary wall, OHT and commissioning of Pump Motor etc of Daipur G.P. under Dhamnagar Block
Construction of 500 MT Godown, Pave Yard, CC Road, Bore Well, Boundary Wall and Site Development at Lephripara village under Lephripara LAMPCS at Lephrripara Block under RMC Sargipali out of DMF 2019-20
Repair of processing unit store room Implement shed and boundary wall Such as fixing of MS Pipe trays pre coated galvanized sheet colouring of building of AICRP of Ground nut under OUAT Bhubaneswar
Construction of additional work ie Retaining Wall boundary Wall Septic Tank campus lighting paver Block road drain etc at Anwesha Hostel at Rayagada under ST and SC Development Department Government of Odisha, Bhubaneswar
Construction of FIC cum FRS, Pave Yard, CC Road, Boundary Wall, RCC Cover Shed, Bore Well, Toilet Block and Watchman Shed at Rajgangpur Market Yard under RMC Sargipali out of DMF 2020-21.
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Bishalkana of B.B Kayan G.P under Bonth Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Chandipur of Pradhanpada G.P under Bonth Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Pagar of Chandigaon G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Basuapada of Erada G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Gobindabindha of Aruha G.P under Basudebpur Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Mulagaon of Betada G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Langudi of Haripur G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Lunia of Khaparpada G.P under Dhamnagar Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Kiapada of Arandua G.P under Basudebpur Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Kantada of Padhani G.P under Dhamnagar Block
Construction of D Type 1 No and E Type 1 No Staff Quarters Building and Boundary Wall of Govt. Homoeopathy Dispensary at Tamasa in the District of Malkangiri for the year 2024-25
Repair and renovation to toilets, water supply line, Plant boundary wall and Provision of paver block along with concrete drain at Ferro Chrome Plant OMC at JK Road in the district of Jajpur
Construction of 2 Nos. RCC Cover Shed, Pave Yard, Bore Well, Boundary Wall and Site Development at Kinjirkela village under Kinjirkela LAMPCS at Balisankara Block under RMC Sargipali out of DMF 2019-20.
Washing and painting of Durga puja mandap and surrounding boundary wall at Dera colony and kali mandap at Handidhua colliery with up keeping work under Talcher colliery, Talcher Area for the year-2026
Development and upgradation of Rourkela Airport in the state of Odisha from Code 2B to Code 3C. SH Construction of Boundary Wall for segregation of Operational and Non Operational Area at Rourkela Airport
Construction of Boundary wall, Rest room, canteen building and 20 seated toilet and bath units along with the new gate around the bulb road at L and T junction near Gate No.1.
Construction of pre-cast RCC cover slab including repair of cable trench and placing of new casted slab over cable trench from Power House to 220 KV Switchyard boundary wall at UIHEP, Mukhiguda.
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Uteipur of Anandapur G.P under Dhamnagar Block
REPAIR TO BOUNDARY COMPOUND WALL FENCING AND GATE INCLUDING PERIODICAL SERVICES AT TRACKING STATIONS SITE A B C KUMARPUR BHIMPUR AND ALONG THE RANGE ROAD OF ITR CHANDIPUR UNDER AGE B R II CHANDIPUR