Loading…
Loading…
5,458 results • Best match
P/L bituminous concrete i/c profile correction in km 0/0 to 5/0)
Providing and laying 30 mm thick bituminous concrete in km. 6/00 to 7/00
P/L bituminous concrete i/c profile correction in km 82/0 to 83/0
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 1/0
Providing and laying 30mm thick bituminous concrete pavement in Km 7/000 to 8/000
Providing and laying Tack coat and Bituminous Concrete in Km. 1/0 to 2/300
Providing and laying 30 mm thick bituminous concrete in km 35/00 to 36/00
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 1/600
Providing and laying 30 mm thick bituminous concrete in km. 0/0 to 0/750
(Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Cement Concrete Pavement
Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Cement Concrete Pavement
Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Interlocking Paver Block
Providing patch work with tack coat and 300 mm thick Bituminous concrete in various RD
Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Cement Concrete Pavement
Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Cement Concrete Pavement)
Providing and laying 30 mm thick bituminous concrete in km 0/0 to 3/0
P/L25mm Thick Bituminous Concrete including profile correction in km. 6/000 to 7/000
Providing and Laying 25 mm thick Bituminous Concrete in Km 2/0 to 3/0
Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Cement Concrete Pavement )
Providing and Laying 25 mm thick Bituminous Concrete in Km 0/0 to 2/200
Providing and Laying 25 mm thick Bituminous Concrete in Km 0/0 to 2/200
Providing and laying Tack coat and Bituminous Concrete in Km 4/0 to 6/0
Providing and laying bituminous concrete including profile correction in km 0/0 to 3/0
Providing and laying 30 mm thick Bituminous Concrete at km 0/000 to 1/000)
SH Repair of pot holes at RD 3 00 to 7 00
Metalling and tarring of Mataghat to Ghaighat road km 0 0 to 4 270 SH Removal of formation Defficiency by providing retaining wall and B wall Cross drainage work P L soling road side drain Essential Parapets and P F sign board Crash barrier in
M/T and CD on Gamberpul Marheta via Baniyara road SH Grade-I Grade-II Grade-II and 20 mm thick premix carpet and seal coat in km 0/0 to 2/100 under SCCP
Removal of Formation Deficency , Retaining walls and breast walls,Cross drainage work 900mm dia Rcc Hume pipe Culvert Providind and Laying WBM Grade-I,II,III ,Metalling/Tarring, Road side drain,PCC Parapets ,Sign boards and kilometre stone etc
RRD PHC Kasba Kotla to GSSS Kasba Behar road (SH Providing and Laying GSB, Metalling Tarring at various RDs between 0/0 to 0/500)
C/O Bantighat Bhagyanghat road km 0/0 to 4/0(SH Tarring C/O unlined drain in Km 0/0 to 4/0) MNP
Construction of Lilly Amtrar Mundla road in Distt Kangra (HP) (SH-Providing and laying soiling, wearing and Tarring in Km 0/000 to 1/300).
C/O Bagthan Lana Baka road Km. 0/0 to 6/930(SH P/L Tarring in Km. 3/500 to 4/500) Under SCSP
CO and MT link road to Harijan Basti Amlehar km 00 to 2700 SH Providing and laying WMM and Tarring km 000 to1000 under SCCP
CONSTRUCTION OF LINK ROAD MASEH KHAD TO KURIAL KHAD HARIJAN BASTI JATOLI KHATRAIN JATOLI CHAKRAN KM 0.0 TO 5.500 SUB HEAD P.L TARRING UNDER SCSP
SRMO Ind. Road and road side drain (Metalling and Tarring) from Plot. No. 39 to 32 and 33 at Ind. Area Bilaspur Distt. Bilaspur (HP).
M/T and CD work on Bharmour Hadsar road Km 0/0 to 13/0 Balance work of Metalling and tarring work at various RDs.
Const of link road to village Challul Behar km 000 to 1500 SH PL GSB WMM and Metalling Tarring between km 000 to 0500under MNP
C.O SWANA TO GULANGRA RAOD KM 0.0 TO 2.500 SUB HEAD P.L GSB .WMM AT RD 0.500 TO 1.0 TARRING IN KM 0.0 TO 1.0
Construction of Kelodhar Sainj road km 0/00 to 19/00 ( SH Providing and laying Metalling and Tarring in km 15/340 to 16/340 )
Construction of Jandrah Aerla Dola Kardiana road in Distt Kangra (HP) (SH-Providing and laying wearing and Tarring in Km 0/000 to 1/000).
Re-Metalling and Tarring of Road leading to Non-Teaching Employees Quarters at Cheriton Estate by providing plain Cement Concrete in HP University, Shimla-5.
Improvement and Metalling on Manikaran to Barshani road Km. 0/0 to 12/120 SH Providing Metalling and tarring Km. 4/0 to 8/0.
Construction of Link Harijan Basti Godri Sidh Km 000 to 1800 SH Providing laying GSB WMM and Tarring between Km 0900 to 1800 Under SCCP
Improvement and Metalling on Manikaran to Barshani road Km. 0/0 to 12/120 SH Providing Metalling and tarring Km. 0/0 to 4/0.
Improvement and Metalling on Manikaran to Barshani road Km. 0/0 to 12/120 SH Providing Metalling and tarring Km. 8/0 to 12/120.
Providing and laying 30mm single layer bituminous concrete (HP0404VR009515305) in km. 4/0 to 5/0
Providing and laying 30mm thick Bituminous concrete in Km 1/00 to 4/00 3.00 Kms)
Providing and laying built-up spray grout, bituminous concrete in Km. 1/0 to 2/0
Providing and laying built-up spray grout, bituminous concrete in Km.40/0 to 41/0
Providing and laying 30mm single layer bituminous concrete (HP0404VR026611802) in km.1/0 to 2/0