Loading…
Loading…
5,458 results • Best match
Special repair to Parwanoo Kasauli Dharampur Subathu Solan MDR 06 road in Km. 000 to 57320 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km 000 to 400 Under NHAI Deposit 3rd call
P/L Providing and laying 25 mm thick Bituminous concrete in km 5/00 to 6/500, 0/00 to 2/00,0/00 to 1/00 respectively with paver finisher) DRRP No. HP-03-03VR0099,VR0056,VR0135 VR-0/129
P/L 30mm thick bituminous concrete in kms 2/0 to 3/960 I/c paver block, G-III in pot holes and C/O drain at RD 2/700 to 2/800 and 3/335 to 3/445 under PMGSY
SH Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/00 TO 2/600) ( under approved AMP for the FY- 2020-21)
SH Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 3/00 to 4/700) ( under approved AMP for the FY- 2020-21 )
Providing and Laying bituminous concrete 30mm thick in Km 2/0 to 3/0 ,0/0 to 1/120, 1/00 to 2/00 respectively Under PMGSY with paver finisher) (DRRP No-HP-03-03 - VR 0010 ,VR 0021 VR0121)
Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 3/000 to 4/000 ) Add. Kms. under AMP 2025-26- Village Road
SH Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 1/00 TO 3/270) ( under approved AMP for the FY- 2020-21 )
Providing and Laying Built up spray Grout Single layer, Tack Coat and 30 mm thick Bituminous concrete at Km 65/00 to 66/00, 67/00 to 68/00 and 73/00 to 74/00, 74/00 to 75/00.)
Providing and Laying 25mm thick Bituminous Concrete in Km. 0/00 to 1/00 along with Providing and laying Hot Applied Thermoplastic compound 2.50mm thick for edge line in between km. 0/00 to 1/00) Under AMP 2025-26
Annual Maintenance Plan for the Year 2023-24 on Jandhuri to Pratha road in Km. 000 to 800 SH Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km. 300 to 500Under PMGSY. 2nd call
Providing and Laying 25mm thick Bituminous Concrete in Km. 0/00 to 0/650 along with Providing and laying Hot Applied Thermoplastic compound 2.50mm thick for edge line in between km. 0/00 to 0/650) Under AMP 2025-26.
Providing and laying renewal coat by providing 25 mm thick Bituminous Concrete in Km.28/00 to 29/00, 30/00 to 31/00, 31/00 to 32/00, 36/00 to 37/00 and 37/500 to 38/600
SH Providing and laying 30mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/00 to 7/00) Additional Kms under PMGSY Financial Incentive F.Y. 2023-24
Performance Based Financial incentive 2019 20 during the year 2021 22 for KheelKaMour to Subathu road in Km 0 00 to 7 00 SH Providing and laying Renewal by providing 30mm thick Bituminous Concrete in Km 1 00 to 2 00
(SH- Providing and laying 30 mm thick Bituminous Concrete in Kisanpura to Ganguwala road km 0/0 to 0/510 and 97/750 of NH-07 Bhattanwali to Kisanpura road via Patwarkhana Km 1/0 to 1/500 including profile correction)
AMP for the year 2022-23 on Parwanoo Kasauli Dharampur Subathu Solan road MDR 06 in Km 000 to 58320 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 5500 to 5700
Providing and laying bituminous macadom and bituminous concrete with Paver Finisher in Km-0/000 to 2/500 and 2/600 to 2/800 and cement concrete pavement at RD-2/500 to 2/600 and 2/800 to 2/900
Providing and laying 30mm single layer bituminous concrete (MDR042) km. 47/0 to 48/0, 48/0 to 49/0, 57/0 to 58/0, 60/0 to 61/0, 62/0 to 63/0 and 63/0 to 64/0
P/L 30mm thick bituminous concrete in km 0/0 to 1/0 I/c paver block, G-III in pot holes and C/O drain at RD 0/095 to 0/125 and RD 0/785 to 0/815.
Providing and laying 30mm single layer bituminous concrete (HP0410VR009018206) km. 3/300 to 4/300, 4/300 to 5/300, 5/300 to 5/500 and Interlocking pavers at R.D.4/270 to 4/315 and 4/465 to 4/495
(SH- Providing and laying 30mm thick Bituminous Concrete in Km 97/00 to 101/00, 107/00 to 110/00 Solan Meenus road Km 113/0 to 114/0, 118/0 to 120/0 and 124/0 to 126/0 )
Annual Maintenance Plan for the year 2020 21 for Parwanoo Gadyar road SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 0/00 to 2/00 Under NABARD VR0155 Substituted from Old Kalka
Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/000 to 1/000 ) Add. Kms. under AMP 2025-26- Village Road
SH Construction of 5/7 metre wide road Formation cutting Retaining wall Cross drainage GSB WMM Providing and laying 30mm thick bituminous concrete Interlockiong Paver V-shape-Drain Kilometre stone Parapet W-Metal Crash Barrier Km 0/0 to 1/700
Providing and laying bituminous concrete 25mm thick in km. 0/0 to 3/00/0 to 2/240 0/0 to 1/0 0/0 to 1/0 respecetively with paver finisher) DRRP No. HP-03-05 VR0071 VR0123 VR0137 VR0138
P/L 30mm thick Bituminous concrete on Majhyali to Kothigehri road km 10/00 to 12/00 (HP0810MRL08931411- HP0810MRL08931412) and Talyahar Pingla Thona Sarkaghat road km 11/00 to 12/00 and 17/00 to 18/00 (HP0810MRL09431412 and HP0810MRL09431418) (VR).
(SH- Providing and laying WBM G-III and Tarring at Reduced Distance 3/0 to 4/0)
Providing and laying Tarring at Km. 0/100 to 0/930 and 1/030 to 2/295
Sub Head - Providing metalling tarring and steel work in Bridge railing Km. 0/0 to 0/074
Metalling and Tarring on approach road to Helipad at Dhameuli Km 0-0 to 1-0 Deposit
Providing and laying soling, wearing, tarring work in extended portion in Km 0/0 to 6/890
PROVIDING AND LAYING G.S.B., W.M.M. AND TARRING IN KM. 0/0 TO 0/500) (UNDER O.T.M.N.P. HEAD).
SH P/L Wearing coat G- 2 and Tarring work in Km 0/0 to 0/500
PROVIDING AND LAYING G.S.B., W.M.M. AND TARRING IN KM. 0/0 TO 0/500) (UNDER S.C.S.P. HEAD).
Providing and laying metalling and Tarring including U-shape drain at RD 0/000 to 0/250
Providing and laying G.S.B and wearing coat and tarring work in Km 1/100 to 1/500
Construction of Passing places, R/walls, Missing CD, Side drain, Parapets, Cement concrete pavement and tarring work
Providing and laying G-I,G-II Mettaling Tarring at km. 0/00 to 1/270).(SCSP
Providing and Laying WBM G-II and Tarring work at Km 0/600 to 1/215) (MNP)
(SH P/L GSB, WMM, Metalling and Tarring in km. 0/0 to 0/600)(Under OTMNP).
Left out work of retaining walls, earth filling, on both side approaches i/c metalling and tarring
(SH- Providing and laying Soling, Wearing and Tarring (Premix) in Km. 0/0 to 1/0) (WP)
C/o R/wall in wire crate and Metaling Tarring at Rd 19/500 to 20/00
SH Providing and laying WMM and Tarring in km 0/0 to 0/720 Under OTMNP Head
Providing and laying wearing grade-3 AND Metalling and Tarring in Km. 0/00 to 0/800
Providing and Laying G-I,G-II and Mettaling Tarring in km. 0/00 to 1/00
SH P L WBM G II G III tarring in K M 1 0 to 1 500
SH Providing and laying metalling and tarring in km 1/250 to 2/0 under OTMNP Head
Providing and laying WBM-II, WBM-III and tarring work between Km 4/800 to 6/000