Loading…
Loading…
5,458 results • Best match
PROVIDING AND LAYING TACK COAT AND BITUMINOUS CONCRETE INCLUDING PROFILE CORRECTION BETWEEN KM 44/0 TO 45/0 ,48/0 TO 50/0 , 51/0 TO 52/0 AND 55/0 TO 56/0) (YEAR 2022-23 MDR)
Maint. and cross drainage work of Totu Power House Colony Road from 0/0 KM to 0/410 Sh P/L Soling grade-III tack coat Bituminous Concrete and V-Shape drain in 0/0 to 0410 KM
Link road DAB School to Housing Board Coloney Daruhi VR013710101 KM 0/0 to 0/600 3 Link road to Village Anu Khurad (VR002210101 KM 0/00 to 1/00 SH Providing and laying 25mm thick Bituminous concrete
Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 7/000 to 8/000, 8/000 to 9/000, 9/000 to 9/500, 9/500 to 10/000 and 10/000 to 11/000
SH Providing and Laying 25 mm thick Bituminous Concrete along with Providing and Laying of Hot Applied thermoplastic compound 2.50 mm thick for edge line in between km 9/00 to 11/525 ( under the AMP 2020-2021.)
SH-Balance work of Retaining walls and Pusta wall at various Rds between KM 0/330 to 3/300 and Providing and laying 30mm thick Bituminous concrete laying with paver finisher at RD 4/800 to 4/950
Annual Maintenance Plan for the Year 2023-24 on Patta Goela Chhachhi road in Km 000 to 19500 SH Providing and laying renewal coat by Providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 1300 to 1500
SH Providing and laying WBM G-III, 25mm thick bituminous concrete on Khanog Surad Bangla road Km. 12.000 to 13.000 and 13.000 to 14.400 and Rai Bahli Khuni Kharahan road Km. 10.000 to 11.000 and 11.000 to 12.000
Periodic Renewal on Kaloha Pragpur Dhaliara Dada Siba Sansarpur Terrace road SH. Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 43.350 to 44.200 and 52.200 to 54.495 MDR.6 during the year 2019-20.
SH PL 30mm thick Bituminous concrete Wet Mix Macadam WMM Priming coat and Tack coat in km 0 0 to 1 320 to 3 500 and Providing and applying thermoplastic layer at RD 1 320 to 3 500
Annual Maintenance Plan for the year 2022-23 on Sultanpur Mari KaGhat road in Km 000 to 8180 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 000 to 200
SH- Providing and laying 30mm thick bituminous concrete alongwith providing and laying hot applied thermoplastic compound 2.50 mm thick edge line in Kms. 0/0 to 7/0 ) Under AMP MDR for the year 2023-2024 PMGSY incentive
R/O damges due to laying of Sewerage Pipe line under Parwanoo Sub-Division.(SH Supply of Premix bituminous Concrete materials at site of work for repair to pot holes of various roads under Parwanoo Section)2nd call
Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 1/00 to 2/00) Under Addl. KMS. AMP. 2024-25.
Providing and Laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 2/770 to 4/00 and 4/690 to 4/750).
Providing Laying G-II, G-III, built up spray grout, tack coat, bituminous concrete 25mm thick in Km 0/500 to 0/900 and Construction of V-Shape road side drain in Km 0/00 to 0/900)
SH P/L Bituminous concrete km 0/0 to 0/055 0/136 to 0/375 and 0/555 to 0/705 and paver block at RD 0/055 to 0/136 and 0/705 to 0/738
Providing and laying built-up spray grout, tack coat, bituminous concrete 30mm thick and thermoplastic strip in km. 0/00 to 1/00, 2/00 to 3/00, 5/00 to 6/00, 6/00 to 7/00).
(SH- Providing and laying patch work with 25 mm thick Bituminous Concrete including profile correction in essential portions in Km 14/0 to 15/0,19/0 to 22/0, and 24/0 to 26/500). Under OFC Deposit.
P/L 30mm thick bituminous concrete in kms 0/0 to 0/960 I/c paver block, G-III in pot holes and C/O drain at RD 0/300 to 0/345 and 0/695 to 0/750.
(SH- Providing and laying 30mm thick bituminous concrete and repair of pot holes on Jakhana Sharli Manpur road in km. 4/00 to 6/0 and Pab Manal road in km. 0/00 to 2/600) Under Financial incentive .
AMP for the year 2022 23 on Patta Goela Chhachi road in Km 0 00 to 19 500 SH P/L Renewal coat by Providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 11 00 to 13 00
Providng and layinf 30mm thick bituminous concrete in (1) ) Link road to new Bazaar Dharampur By-Pass km 0 /00 to 01/300 (2) Baroti to Kandapattan road km 0/00 to 4/00 AMP for the year2021-22
Annual Maintenance Plan for the year 2023 24 on Patta Beja Masoolkhana road in Km 000 to 17 500 SH Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km. 500 to 8900
Providing and Laying bituminous concrete 25 mm thick in Km 9/00 to 10/00,0/00 to 0/900 0/00 to 1/00 Respectively with paver finisher) (DRRP No. HP03-03 MDR036,HP03-03 VR0133,HP03-03 VR0142)
Annual Maintenance Plan for the year 2022-23 on DharampurKasauli Road MDR-10 in Km 000 to 10735 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 6 00 to 10840
P/L BITUMINOUS CONCRETE 30MM THICK IN KM. 1/00 TO 2/00, 3/00 TO 5/560 AND 0/00 TO 1/00 RESPECTIVELY WITH PAVER FINISHER DRRP NO. HP-03-03 VR0068 AND VR0121) (UNDER PMGSY INCENTIVE).
SH Providing and laying 30 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 1/00 to 3/00 ) under AMP for FY 2023-24
Completion and strengthening of Berthin Chhatt Karloti Dangar Targhel Taroun Ladrour road ( Portion Maire to Hari-Talyanger ) (SH C/o 6.00 mtr span slab culvert at R.D 1/125 and C/o sub-grade and P/L Bituminous concrete )
R/R damageson Bhoj Nagar to Chakki More road in km 0/00 to 14/00 (SH P/L GI, G-II, G-III and Bituminous concrete at various reaches between km 10/940 to 13/680) Under PDNA
Providing and Laying bituminous concrete 30mm thick in km. 3/0 to 5/0,1/0 to 1/380 and 0/0 to 1/0 Respectively) Under PMGSY DRRP No. HP-03-05 VR0115, VR0001, and VR0117 )with paver finisher
Annual Maintenance Plan for the year 2022-23 on Barotiwala to Gunai road in Km 000 to 19 120 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 800 to 900
Annual Maintenance Plan for the year 2022-23 on Bhojnagar Chakki Ka More road in Km 000 to 1400 SH Providing and Laying Renewal coat by Providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 1200 to 1400
Providing and laying Tack coat and Bituminous Concrete in Km 30/0 to 31/0, Km 32/0 to 34/0, Km 37/0 to 39/190, 45/0 to 46/0 and Km 52/510 to 54/0
Providing and laying built-up spray grout ,Tack coat and 30mm thick bituminous concrete in km 0/0 to 0/950, Earthen shoulder, V-shape drain, Road marking strips and Chandpur to old road km 0/0 to 0120
Providing and Laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 thick for edge line in between km. 5/00 to 7/330) Addl. Kms under AMP 2025-26 Village Road.
Repair to Parwanoo Khadeen Banasar road in Km. 0/00 to 13/190.(SH P/L renewal coat by Providing 25mm thick Bituminous Concrete and Thermoplastic edge line in Km. 12/240 to 13/186)DC Deposit.2nd call
Balance work of Improvement an Widening of Kaloha Pragpur Dhaliara Dada Siba Sansarpur Terrace Road km 11/200 to 60/920 (SH. Providing and laying wet mix on berms ,Bituminous macadam Bituminous concrete with paver finisher on 5.00 meter
Providing and laying 25mm thick Bituminous concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00) Addl. Kms under AMP 2025-26 village road.
M/T on Habban Dhamoon road Km 0/0 to 21/645 (SH Providing and laying WBM G-III in km 0/0 to 1/500, C/o R/wall in Km 0/780 to 0/800 and C/o unlined drain and tarring in km 0/0 to 1/500) Under MNP
Metalling and Tarring on Khajalaghati to Karyalu via Dochi Katal road in km 0/0 to 3/350. (SH- Formation deficiency inc R/walls and B/walls, C.D. works, GSB,WBM-II, III, M/T, PCC parapets, V-shape drain, km stone in km 0/0 to 3/350) under NABARD RID
Providing and Laying, Metalling Tarring in various slushy reaches in K.M. 0/00 to 0/800
(SH- P/L Kharanja stone soling GSBWBM G-II, WBM G-III, unlined drain and Tarring)
Providing and laying Grade I Grade III and Tarring in Km 0/0 to 0/540
Providing and laying WBM II, WBM III and tarring at RD. 8/700 to 9/500
Providing and Laying G-III and Metalling and Tarring at RD -0-0 to 9-450
SH Providing wearing coat GSB GIII and Tarring works in km 0/500 to 1/00)
Housing Colony Moginand phase II Tehsil Nahan Distt Sirmour HP SH Metalling and Tarring of Road
P/L Tarring work in Km 5/0 to 6/0 (Portion Tyalu chowk to Bhawarna).