Loading…
Loading…
79 live66 closing this weekmost from PWD and Directorate of Urban Development
79 results • Best match
RR Damage to Link road village saio link road village kotru 3 link road village Tandalito patsari4 link road to vijay nagar TKHR road under rohru section SH Hiring of JCB for removal of slips Maintenance of road surface and drain dressing of bur
Repair Restoration of Rain Damages on link road Gagret Oel Ispur road Km 000 to 13690 SH Repair of road with Bituminous Concrete laid with paver finisher in Km 1750 to 2500 Under PDNA 2025
AMP on approach road to SE Residence at Dalhousie ) ( Against PDNA-2025)
REPAIR TO ROAD FURNITURE AND INTERNAL ROAD SURFACES AT PALCHAN UNDER AGE (I) R AND D MANALI.
Restoration of catch pit for existing Hume pipe culvert and check dams at Saledha Khadd across the approach road to Surge Shaft of NJHPS, Distt Shimla HP
1 Link road karlish 2 link road village Bastari 3 C o Nasari Dalgaon road SH Hiring of JCB for removal of slips Maintenance of road surface and drain dressing of burms shoulders etc and hiring of Tipper for carriage of muck gravel m
C o path from link road Bari to Naveen Kumar, Praveen Kumar house in ward no 03 NP Daulatpur Chowk
Repair and maintenance of an approach road and its branches in HPPCL Colony at Hatkoti length 1225 mtr in respect of Sawra Kuddu HEP 111 MW, HPPCL,Hatkoti Tehsil-Jubbal, Distt.-Shimla-171206 H.P
C/O link road from Gahi to Jabli in Km. 0/00 to 2/405.(SH C/O 3.00 x 3.00 mtrs RCC Box Cell Culvert at Rds. 0/330) Under MMGSY
R.R Damages on link road to Village Tranda 0.00 to 5/555 SH. P.L Cement Concrete Pavement at RD 2.700 to 3.000.
C/O link road from Gahi to Jabli in Km. 0/00 to 2/405.(SH ROFD in Km. 2/240 to 2/270 and Grade Improvement at Rds. 2/285 to 2/375) Under MMGSY
Repair to link road to Village Nalwa Mohal in Km.0/00 to 0/300.(SH P/L WBM G-III in essential reaches and 30mm thick BC in Km. 0/00 to 0/300)Under VKVNY Deposit
Construction of link road from Masroor to Ghariar via Othra km 0/000 to 4/000 SHonstruction of Hume pipe culvert at various RD P/L 80mm thick NTC Paver Block from RD. 0/225 to 0/345 MMGSY
Construction of Link road from Lagga to Thath Km. 0/0 to 1/500 (SH Formation cutting work in Km. 0/105 to 1/500)
Construction of balance work of 165.00 mtr Span Double lane Bridge on Nahan Dadahu Haripurdhar Road at RD 35/690.(SH C/O of approach road along with M/T) Under CRF (Job No. CRF-HP-2018-19-155)
C/O link road from Kimmughat to Sai mandir Near Mohan Meiken Factory in Km. 0/00 to 0/500.(SH P/L interlocking Paver Blocks 80mm thick at Rd. 0/00 to 0/076) Under MMGSY
Construction of link road from Harar to Khabli via Jalandhar Lahar in Km 0/0 to 1/500 SH Construction of 3.00mtr RCC Slab Culvert at RD 0/050 Construction of Cement concrete pavement from RD 0/080 to 0/199 MMGSY
Restoration of rain damages on link road from Guler to Gathutar in km 0//00 t0 3/500SH C/o Retaining wall from RD 1/280 to 1/295 Cement Concrete Pavement from RD 1/100 to 1/125 2/030 to 2/095 UShape drain from RD 2/700
Restoration of rain damages on link road to Durga Mata Mandir Dagrah Km 000 to 1000 SH PL 30mm thick bituminous concrete between RD 000 to 0630 under PDNA 2025
Co Link road village Kimwali to jakha km 00 to 1400 SH F C 5 7 mtr benching of road level km 12 150 to 13 795 Portion Jiskoon to jakha
Strengthening of pavement including improvement of road safety Costruction of Retaining wall Breast Wall and Thrie beams crash barriers etc in km 156507 to 208705 on NH 05 in the state of Himachal Pradesh on EPC Mode
Repair Restoration of Rain Damages link road to village Oel from Gagret Oel Ispur road Km 000 to 3275 SH Construction of Retaining wall and UShape Drain at various RDs Under PDNA 2023
Restoration rain damages on Link Road Gugga Mandir to Harizan Basti GP Haripur in Km. 0/00 to 1/500 SH Construction of Cement concrete pavement at Rd. 0/620 to 0/685 0/930 to 1/120 V-Shape drain from Rd 0/930 to 0/995 Breast wall at RD. 1/225 to 1/
Construction of link road from main Road Masroor Chatra Mod to Padharbasi Village upto PHC Masroor Village km 0/000 to 1/000 (SH Construction of R/Wall at RD. 0/115 to 0/120 Providing and laying 80mm thick NTC Paver Block at RD. 0/00 to 0/090 0/096
Repair Restoration of Rain Damages on link road to Shaheed Gurdev Singh to Village Deoli Km 000 to 3070 SH Providing and laying Bituminous Concrete laid with paver finisher in Various RDs Under PDNA 2023
Restoration of rain damages on link road to H/Basti Patta Ward No. III , AMP for the year 2026-27 SH P/L of Bituminous Concrete BC in km 0/00 to /417 UNDER PDNA 2025
Restoration of rain damages on link road from main road to Ashok Kumar House etc House Ward No.4 G.P Dhar in Km 0/0 to 0/600 SH Construction of Cement concrete pavement, Edge wall V-Shape drain between RD 0/060 to 0/600 Under NDRF
Restoration of Rain Damage on Link Road to village Nawai km 0/0 to 3/0 (under ODNA 2025) (SH C/o R/wall at RD. 0/580 to 0/582 and 0/820 to 0/832
Restoration of rain damages on link road from Jole to Khurwain Km 000 to 8400 SH PL 50mm thick BM and 30mm thick bituminous concrete between RD 000 to 0500 and 2660 to 2746 under PDNA 2025
CO link road from Sanghnai Bridge on Daulatpur Gagret Road to abadi Guggaran Kabir Panthi via Day Boarding School Sanghnai KM 000 to 0780 SH Construction of 275 500 mtr wide Jeepable road CuttingFilling Subgrade GSB WMM Metalling Tar
Repair Restoration of Rain Damages on link road Gagret Daulatpur road to Adarsh Colony Mohalla Lohara Kumharan Trali and Mohalla Gugga Panga in village Mawa Kohlan Km 000 to 2600 SH Providing and laying Bituminous Concrete laid with paver finis
Repair Restoration of Rain Damages link road Gagret Oel Ispur to Bhawa siriyan Km 000 to 2200 SH Co PCC UDrain from RD 3200 to 3300 and Retaining on Downstream side existing culvert approaches at RD 1765 Under PDNA 2023
Restoration of rain damages on link road Jole to Kainth via Bhooran Amroh Kuhroo Sanjot road Km 000 to 14255 SH PL 30mm thick bituminous concrete between RD 4740 to 4965 5200 to 5300 and 6000 to 6100 under PDNA 2025
Construction of Road from Gopipur to Chamukha Road in Km 0/00 to 6/00 Sub Head Providing and laying of Hot Applied Thermoplastic Paint 2.5mm thick in Km 0/00 to 6/00. MDR-133 MMGSY
widening of link road kalas to lower kalas ward 4
Restoration of rain damages on link road from Kot to Jahu via Dhagyar km 0/00 to 2/500 SH Providing and laying Cement concrete pavement between RD 1/800 to 1/900 and at RD 1/960 to 2/060 under NDRF.
Restoration of rain damages on link road Mundkhar to Mohra km 0/00 to 3/735 SH Laying of RCC Slab Culvert 3.00 mtr Span at RD 3/430 and C/o R/wall at RD 3/436 to 3/464.25 Under NDRF
R.R Damages on link road from Kuppa to Palika Sario Km 0.00 to 5.00 .SH. Regrading of portion between Km Km 0.495 to 1.400 and C.O R.wall at RD 0. 525 to 0.585 and C.O B.wall at RD 0.545 to 0.585 Under PDNA
Providing and laying 25mm thick Bituminous concrete for patch work at various RDs) (Under PDNA)
Construction of RCC slab Culvert, Gratting Jallah at RD. 0/478 to 0/495, Drain and Paved Shoulders at RD. 0/495 to 0/885 on Nagrota Surian to Pukharbar road Km. 0/0 to 2/450
Kursai to Barota via Pukhru Rana Basti road km 0/00 to 1/800 SH Construction of link road Barota to Kudi Ghat laying cement cocrete pavement at RD 0/840 to 0/950 and V-shape drain at essential reaches and Retaining wall at various Rd Under SDRF/ND
Repair of patch work by P/L WBM G-III and Bituminous Penetration Macadam in link road to Ghaini km. 2/00 to 3/00 and link road village Annu in km. 2/00 to 4/00).
1950 iii RR damages on Bassi Bhakreri ITI Balore road SH Repair of pot holes at various RDs Under PDNA 2025 Serial No 1861 iv RR damages on link road to Harizan Basti Khatarwar SH Repair of pot holes in between km 0 00 to 2 00 Under PDNA 2025 Seri
P/L B.C. 25mm thick in km 2/0 to 3/0, 0/0 to 1/0, 0/0 to 1/0 and 5/0 to 6/0 respectively with paver finisher (Under PDNA-2025)
(SH- C/O edge wall with drain at RD 0/482 to 0/503)(Head SDRF/2026/244)