Loading…
Loading…
16 live14 closing this weekmost from Ministry of Road Transport and Highways and Public Works Department
16 results • Best match
Construction of Development works (Internal road & Path i.e. Cement Concrete pavement & footpath, storm water drains, illuminated signage) at 58th Bn ITBP Roing, Arunachal Pradesh (SH:- Development of site including internal road & path, parking, 33kv substation AMD 33kv/11kv HT cabling, STP plant).
SPECIAL REPAIR TO INTERNAL ROAD FOR JCOs AND OR MD ACCN WITH CONNECTED ITEMS AND SPL REPAIR TO CERTAIN STRETCH OF ROADS UNDERGETEMGA
Construction of Road from Ningcho Village to Langpia in East Kameng District.
Construction of road from Thembang CO Hqr to Lachang in Dirang under West Kameng district.
Authority Engineer for supervision of Construction of road from Taliha to Tato section of Frontier Highway NH 913 km 87.13 to 121.541 34.411km on EPC mode
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Bameng Khenewa 43.65 to 85.60 41.950 km on EPC mode
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 km 160.750 to km 209.9 49.15 km on EPC mode
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 from km 55.725 to 113.25 57.525 km on EPC mode
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 from km 113.25 to 160.75 47.500 km on EPC mode
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Lada to Bameng 0.000 to 43.65 43.65 km on EPC mode
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Khenewa to Koloriang 85.60 to 168.00 km 82.400 km on EPC mode
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 Huri Parsi Palo km 0.00 to 55.725 55.725 km on EPC mode
Authority Engineer for supervision of Construction of road from Bomdilla 9th Mile Nafra Lada section of Frontier Highway NH 913 Dishum Sachung Lada 70.00 to 167.75 97.75km on EPC mode
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of road from Bomdilla 9th Mile Nafra Lada section of Frontier Highway NH913 9th mile Nafra 19.554 to 70.00 50.446 km ON EPC
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 koloriang to Sarli km 168.0 to 183.40 15.40 km and Sarli to Huri km 0.00 to 78.38 78.38km on EPC mode
Authority Engineer for supervision of Construction of road from Bile Migging section of Frontier Highway NH 913 km 0.00 from Migging end to 17.812, km 17.812 to 55.377 Migging end km 0.000 at Bile end to km 27.430 on EPC mode