Loading…
Loading…
51 live39 closing this weekmost from GREATER HYDERABAD MUNICIPAL CORPORATION and PRED - TELANGANA
51 results • Best match
Formation of Internal Roads in Yellampet Municipality under NAGARABHIVRUDHI Funds(3rd Call)
Laying of CC road (Internal roads) at Dayakar reddy colony, Hanuman nagar,Chakarivagu approach road, old sc colony Pedda Amberpet, RK Puram,Laxmareddy Palem Rd no1, Pragathi Nagar (internal), GSY, Lumbini Enclave, Padmavathi Colony, Shilpi Enclave ... ( internal roads ), ...
Repairs to damaged BT road strengthening and Recarpating at tirumala bakery, approach road near vasudha hospital in ward-294 and 295 Bowrampet in Dundigal Circle-59,Quthubullapur Zone,CMC (6th call)
Laying of CC road (Internal roads) at Hathiguda, Indraprashtha Colony, Anjanadri colony, Mansani Colony - Gowrelli road, Ramalayam temple to Rajendar reddy H, Sri Ram Nagar Colony Sy.no. 225, 265 and Connecting 240 to 241, Sy.239 to 255 and GVR ... ( Internal Roads ), ...
Civil works including internal roads at proposed NGEs Ground Stations at NRSC Shadnagar campus Hyderabad
Laying of CC road (Internal roads) at Sri Krishna nagar Colony, Taramathipet, Qutbullapur, Bacharam, Pasumamula, Etikala Layout to Pasumamula road in Kuntloor Ward 51 and Pedda Amberpet Ward-52 of Nagole Circle-11, LBNZ, MMC. ( Pkg-6)
Laying of CC road (Internal roads) at OPP Indian Petrol Bunk, Mallesh H to Abhishek H, Manjeera colony, Shanvi Homes, Manjunatha Colony, Sri Ram Nagar, Shiva Sai colony, Brundava Colony, Siddhi Vinayaka Nagar, Bhagyanagar Colony, Telangana Nagar Colony, Bhoodhan Colony, Satthi Reddy Colony, Varisiddhi Vinayaka Nagar Colony, RGK colony, Ratna Colony P1 and P2: Rd no 1,2,5,6,7,8 in Pedda Amberpet Ward-52 of Nagole Circle-11, LBNZ, MMC. ( Pkg-3)
Laying of CC road (Internal roads) at Kethana Colony, Venkateshwara Colony, Housing Board, ASS Colony, Vennela Hotel, Laxmi Ganapathi Colony, Jyothipuram Colony, ASS colony, Old SC colony Tatti Annaram, YSR colony, Ambedkar Statue - Mee seva, Tirumala Hills Rd no 1,2,3,4,5,6, Sri Nagar Colony, Aadhivasi Colony, Ayyappa Colony, Marripally Water Tank - Bodrai, RK Nagar Rd no 5 in Pedda Amberpet Ward-52 of Nagole Circle-11, LBNZ, MMC. ( Pkg-5)
Laying of CC roads (Internal roads) at Vaddepally Pratap Reddy colony, Sainath colony Phase 2, Pasumamula- Laxmi Kuteer, Pochamma Temple, VPR Colony, Sainagar Colony, Laxmi Kuteer (internal), Nithya Avenue colony, Koheda- Dandem Krishnareddy, Haritha Haram clny(internal), SC Colony(internal), Bhuvaneshnagar Colony, Tarapuri Colony, Pistha House Backside, Swagruha- Borra Sriramulu land, Good Will Homes, Ambika Nagar, Shiva ganga Colony, Old Village Pedda Amberpet, Police colony, JCB Showroom Backside, Mallikarjuna nagar Arch to, ,Harivillu colony, Sai Kuteer colony, Makkala Godowns, Sai Kuteer colony, Laxmareddy Palem in Pedda Amberpet Ward-52 of Nagole Circle-11, LBNZ, MMC (Pkg-1)
Laying of CC roads (Internal roads) at Vaddepally Pratap Reddy colony, Sainath colony Phase 2, Pasumamula- Laxmi Kuteer, Pochamma Temple, VPR Colony, Sainagar Colony, Laxmi Kuteer (internal), Nithya Avenue colony, Koheda- Dandem Krishnareddy, Haritha Haram clny(internal), SC Colony(internal), Bhuvaneshnagar Colony, Tarapuri Colony, Pistha House Backside, Swagruha- Borra Sriramulu land, Good Will Homes, Ambika Nagar, Shiva ganga Colony, Old Village Pedda Amberpet, Police colony, JCB Showroom Backside, Mallikarjuna nagar Arch to, ,Harivillu colony, Sai Kuteer colony, Makkala Godowns, Sai Kuteer colony, Laxmareddy Palem in Pedda Amberpet Ward-52 of Nagole Circle-11, LBNZ, MMC ( Pkg-1)
Replacement of Damaged pipeline due to Road widening by RnB at Peddakomatipalli GP of Mogullapally mandal in Jayashankar Bhupalpally District
Replacement of Damaged Pipeline due to road widening (by RnB) at Parlapally GP of Mogullapally Mandal in Jayashankar Bhupalpally Districts
Construction of pathway in Hill area at approach road to masjid e ghousia rauf under Nizam Colony ward-129,Golconda Circle-32.GZ,GHMC
Shifting of 11KV, DTRs and LT line road widening near Sanju Kiraana Shop to Velama Sangam Gate Kondapur in Kondapur Section of Kondapur Sub Division in Kondapur Division of Cybercity Circle
Shifting of 11KV, DTRs and LT line road widening near Arabindo Kohinoor Apartment to Sanju Kiraana Shop Kondapur in Kondapur Section of Kondapur Sub Division in Kondapur Division of Cybercity Circle
Demolition of 74 Nos of properties( RHS 37 Nos and LHS 37 Nos) affected in the 80 feet road widening from Chandrayangutta X roads to Barkas Via Chandrayangutta PS
Laying of CC patch in place of badly damaged road at approach road to masjid e Kausar in saleh nagar under Ibrahimbagh-133,Golconda Circle-32,GZ,GHMC
Laying of CC patch in place of badly damaged road at approach road to masjid e Buridi in Heerakhana under Golconda ward-132, Golconda Circle-32,GZ,GHMC
Laying of CC patch in place of badly damaged road at approach road to masjid e Gauhar, masjid e Habeeba under Tolichowki-131,Golconda Circle-32,GZ,GHMC
Repair of Road and Bitumen Resurfacing Works at 400 220 kV GIS Banala Sub Station
Laying of CC patch in place of badly damaged road at approach road to masjid e Imam hussain and masjid e mohamediya . under Nizam colony-129 Golconda Circle-32,GZ,GHMC
Laying of Model footpath flooring and providing ss flooring in place of damagedSS flooring at approach road to tameezuddin masjid in Bird Fire under Nizam colony-129 Golconda Zone-32, GZ, GHMC
Laying of CC patch in place of badly damaged road at approach road to masjid e yasmeen and masjid farooq amla under nanal nagar-130 Golconda Circle-32,GZ,GHMC (Reserved for STs)
Laying of CC patch in place of badly damaged road at approach road to masjid e Nizam and masjid e Habeebunisa under nanal nagar-130 Golconda Circle-32,GZ,GHMC (Reserved For SCs)
Laying of CC patch in place of badly damaged road at approach road to masjid e Baithur Raheem, masjid e Jahangir and masjid e Habeeb under Tolichowki-131,Golconda Circle-32,GZ,GHMC
Laying of CC patch in place of badly damaged road at approach road to masjid e Ayesha parveen in Virasat nagar, masjid e Noor e Mohammadiya in Alkarim Colony under Tolichowki-131,Golconda Circle-32,GZ,GHMC
Laying of CC patch in place of badly damaged road and repairs and raising of catchpits at approach road to masjid e Qilayadra dewdi in 7th Gully and masjid e Mohammadiya in Saleh Nagar . under ,Golconda Circle-32,GZ,GHMC
Providing BT road from and Major CD road works from Dupiya thanda to Bandrev thanda of Sarangapur (M) in Nirmal District
Engaging of Additional labour for maintenance of Internal roads and service roads in Shamshabad Circle-18, Shamshabad Zone, GHMC
Laying of CC patch in place of badly damaged road and repairs and raising of catchpits at approach road to masjid e samad ullah Quadri in Ramdevguda and masjid e Qutubshahi and masjid e Noor Mohammed in Ibrahimbagh . under Ibrahimbagh-133,Golconda Circle-32,GZ,GHMC (Reserved for Wadderas and Sagaras)
Laying of CC road at Phase-II (Internal Roads) in Bala Krishna Nagar in Venkat Reddy Nagar ward-27, Uppal Circle-9, MMC
Widening and Strengthening of existing single lane to double lane road of Singotam to Yedutla road from Km.0/0 to 27/3 in Nagarkurnool District Sub Work:- Road Safety Interventions for Singotam to Yedutla road from Km.0/0 to 27/3 in Nagarkurnool District
Widening and Strengthening of Existing Village BT Roads for providing approach to the HGPC Layout From Meerkhanpet(V), Kandhukur(M) to Medipally(V), Yacharam(M) RR Dist(Recall).
ER to Banswada Bichkunda road from km 0/0 to 4/0 in kamareddy district.
ER to Durki Birkur Road from km 0/0 to 9/0 (Including lead road to durki from 0/0 to 1/4) in Kamareddy District.
E.R to Karimnagar-Kamareddy-Yellareddy road from km.90/0 to 102/0, in Kamareddy District
Construction of extension of eat west road at eastern side up to TCIIC boundary wall in the premises of RGIA shamshabad.
Balance work for construction of North-South sector road 2/4 BT laying on 2nd side in the premises of RGIA shamshabad Hyderabad.
Development of pedestrian friendly amenities and installation of solar central lighting along with junction improvement of NGOs Colony to Waddepally road
Shifting of 33KV, 11KV, LT lines and DTRs obstructing road widening from Turkapally Bus stop to Tandoor Restaurant at Genome valley TGIIC in Turkapally(V) in Shameerpet(Mandal) in Medchal Dist.
Laying CC road from h.no:4-4-148/1/128 to Bharath nagar main and Other Internal Roads at mallareddy Extension colony (padmavathi colony) at kowkoor, Yapral ward no-189 in Keesara Circle 1, Malkajgiri Zone, MMC(Item no.9)
Laying of CC road from near arsha school to h.no:5-9-278/92/A and Other Internal Roads at Rock Garden, Yapral ward no-189 in Keesara Circle 1, Malkajgiri Zone, MMC (Reseverd for ST only)(Item no.3)
Road Repair works from Basar Railway Station to Navegaon of Basar(M) in Nirmal(D) Est cost of Rs.135.00 Lakhs
Road Repair works from Kirgul-B to Basar of Basar(M) in Nirmal (D) Est cost of Rs.280.00 Lakhs (2nd Call)
Road Repair works from Petrol Filling Station to Shankari School in Basar (M) of Nirmal (D) Est cost of Rs.45.00 Lakhs
Road Repair works (from PWD Road) to Basar via Mailapur Road in Basar(M) in Nirmal (D). Est. cost of Rs.270.00 Lakhs (2nd Call)
Design, Engineering and Construction of Entrance Arch Structure on NH 65 Link Road to Zaheerabad Industrial Smart City consisting of All Structural, Architectural, Electrical Finishing Works, ICT Systems along with Integration, Testing, Commissioning, Safety Compliance And Handover At Nimz, Zaheerabad.
Design, Engineering and Construction of Entrance Arch Structure on NH 65 Link Road To Zaheerabad Industrial Smart City consisting of All Structural, Architectural, Electrical Finishing Works, ICT Systems along with Integration, Testing, Commissioning, Safety Compliance And Handover At Nimz, Zaheerabad.
proposal for Shifting of 11KV LT Lines along with DTRs due to Road Widening Work from the Existing 4Lane Road to 6 Lane Road Boundaries 66 feet from the Centre Line on either side of the Road from Bellampally Chowrasta to Srinivasa Garden in Mancherial Town 2 Section of Mancherial Sub Division, Mancherial Division, Mancherial Circle, on Partial Turnkey Basis
SW(i)-HYD Division: SC-DHNE section proposed construction of Road Over Bridge as 1 X 36.00 m clear span composite steel girders at km58/300-400 in lieu of exisiting level crossing no. 27 between TMX-SHNR stations for Two lane carriage way (cost sharing work)and SW(ii) - Proposed construction of ROB in lieu of LC no. 90A between Wanaparthi road and Sriramnagar stations, Hyderabad Division of South Central Railway-reg.