Loading…
Loading…
78 live67 closing this weekmost from PWD and Directorate of Urban Development
78 results • Best match
P/L 25 mm thick Bituminous Concrete in km. 1/00 to 3/00) Under AMP 2026-27 Addl. Km
Restoration of rain damages on link road village Baddu GP Kothi(SHC/o B/wall at RD 0/815 to 0/825,R/wall at RD 0/863 to 0/880,R/wall at RD 0/528 to 0/544 and C/o V-shape Drain at rD 0/510 to 0/530 under NDRF
(SH- Construction of B/Wall in PCC 1 4 8 at RD 0/015 to 0/048)Under MMGSY
Providing and Laying 25 mm thick Bituminous Concrete along with P/L of Hot applied thermo plastic compound 2.50 mm thick for edge line in between km. 0/00 to 1/300 Under AMP 2026-27 Addl. Km.
Restoration of rain damages on link road Dadhol Kallan to Village Balh km 0/00 to 1/00 in G.P. Dadhol SH C/o approaches wing wall at Rd 0/655 to 0/659 Dadhol Side D/S , at RD 0/637 to 0/645 Dadhol Kallan side D/S , at RD 0/655 to 0/659.50 Dadhol
Construction Of wire crate work at RD. 1.430 to 1.457.50 under PDNA 2025
Providing and Laying 25 mm thick Bituminous Concrete along with P/L of Hot applied thermo plastic compound 2.50 mm thick for edge line Under AMP 2026-27 Addl. Km
Sub Head- Providing and Laying Interlocking Paver Block and U-Shape Drain in Km. 0/000 to 0/250) Under Head PDNA-2025.
P/L 30mm thick bituminous concrete on Sidhyani to Patha road KM 0/0 to 2/0)(HP0810VR007231102) (PMGSY).
SH C O RWall at RD 0 950 to 0975 0 800 to 0 825 1 200 to 1 240 and 0890 to 0 918 PDNA 2023
Sh Contruction of R/wall at Rd 0/138 to 0/158 , 0/325 to 0/350 and 0/435 to 0/447.50
SH- Providing and laying 80mm thick Cement Concrete Interlocking Paver Block
Construction of R/wall at RDs 1/025 to 1/040, 1/040 to 1/060 and C/o Hume Pipe Culvert at RD 1/062)
(i) Providing and Laying 30 mm thick Bituminous Concrete in Shimla Mandi Road km. 23/00 to 24/00, 32/00 to 33/00 and39/200 to 41/00(ii)Providing and Laying 25 mm thick BC in link road to Ghaini km. 2/00 to 3/00 and link road to village Annu in km
F/C 5/7 mtr. Wide, protection works, CD works, side drain etc. in Km. 0/00 to 4/500). Balance work thereof
Sub Head- P/L Interlocking Paver Block Flooring in Km. 0/900 to 1/200 and Construction of Both Side Edge Wall) Under Head MMSY
Part-I-Civil Work of Bus Stand , Workshop, and E-Bus Depot i/c Bus charging Bay and covered parking i.e. Building portion i/c WS, SI , Site development, Boundary wall, Rain Water Harvesting Tank, Septic Tank, C/o Pavement work, C/o Approach Road,
Sub Head- Construction of 900mm Dia Hume Pipe Culvert at RD. 0/005, 600mm Dia Hume Pipe Culvert at RD. 0/230 and P/L Interlocking Paver Block Flooring in Km. 0/000 to 0/300 along with Edge Wall) Under Head MMSY.
Providing and laying 30mm thick bitumen concrete with paver finisher complete in Km 0/000 to 1/000
Construction of road with Toe wall Retaining walls drains cutting and filling and laying paver blocks and providing drainage system etc