Loading…
Loading…
8,718 results • Best match
Integrated Mosquito, Pest and Rodent Control Services at Visakhapatnam Airport
Construction Of Chairman Chamber & Store Room at 1st Floor Office Building at Market yard, Alamuru under A.M.C Alamuru in Dr.B.R.Ambedkar Konaseema District.
Construction of 1st floor building on office building in Head water work in Circle-1 area in Vijayawada Municipal Corporation (6th call)
Supply, Laying of concealed pipes and cables in the Flooring for the Ground Floor and First Floor of New Zonal office in the process of providing of LAN, wireless LAN (WDS), WAN, SAP, Biometric, Intercom facility, Extension of express channel, Admin ... Zonal office building ,
Kadapa Municipal Corporation under AMRUT Project 2016-20- Sewage and Septage management- Construction of 30,000 Nos Inspection Chambers cum House Service Connections to 60,000 House Holds in entire area of Kadapa town, Providing balance sewer lines ... field office building including ...
Construction of Multi storey building for (R&B) Head office in the premises of O/o the Superintending Engineer (R&B) Circle at Vijayawada Sub Work :- Construction of shed in the premises of Superintending Engineer (R&B) Q.C. Circle
Custom Bid for Services - NUD, NCN AND INTERNET CONNECTIVITY IN NEW BUILDING (CALIBRATION AND INSTRUMENTATION BLOCK) AT DGNP(V) Similar Category Internet Connectivity
Dismantling damaged GI sheets of existing Cycle shed at Sanchar bhavan North side Replacing with new Precoated GI profile sheet Laying CC pathway Precast CC caps on the drain and Repairs to the drain at north side of Sanchar Bhavan Rajahmundry
Providing Electrical Installations, Supply and installation of Cassette type, Hot and Cold type, AC units in newly proposed Construction of Meeting Hall and 1 no. Split type AC unit in dining hall at Gate No.2, in the Official Residence of Honorable ... A.P. Bhavan at ...
Providing Electrical infra in connection with re arrangement of office in ANNEXE Building, at BSNL Bhavan, Vijayawada
Providing EI and other connected works for the proposed conference hall at 4th Floor BSNL Bhavan Vijayawada
Repair & Extension of existing toilet block near Office building at Market Yard, Kankipadu under Agricultural Market Committee, Penamaluru (HQ), Kankipadu in Krishna district
Annual maintenance of buildings at SV Ayurveda Pharmacy, Narasingapuram Kalyanakatta, DyEO Office Building and Kalyanamandapam at Srinivasa Mangapuram for the year 2026 27
Construction of Regional Centre Building for IGNOU, including internal and external electrical installations, fans, power wiring and plugs, lightening conductors etc., near Rayapudi Village, Amaravati Guntur dist., AP SH. Providing LT connection to Indira Gandhi National Open University (IGNOU) Subwork/Packages: one
Maintenance of office Building, Color wash, Wash room repairs & Doors replacement at Market Yard Bhimavaram of Agricultural Market Committee Bhimavaram in West Godavari District
Repairs and Maintenance of Plumbing Work in Mangalagiri-Tadepalli Municipal Office Building at Gothama Buddha road under Mangalagiri Tadepalli Municipal Corporation under General Funds
Facilitating IGBC Green Service Building rating system For The Proposed AO/DO Office Building at Tadepalli, Vijayawada Under Telangana And Andhra Pradesh State Office
Upgradation of Simhadri Bhavan as fully Residetial Guest house at Anu Vihar, BARC Colony, Atchutapuram, near Visakhapatnam, A.P
Providing Mosquito Meshes to SW Boys Girls Hostels at Duggirala, College Boys at Duggirala, Tadikonda Raja Gardens 2 in Guntur, Parivarthana Bhavan in Guntur Pedanandipadu V and m Kolakaluru V and M Raja Gardens 1 at Integrated Welfare Hostel and Construction of Toilets and Bathrooms to SW Girls Rajagarden 2 in Guntur Urban in Guntur District
Providing Mosquito Meshes to SW Boys Girls Hostels at Duggirala, College Boys at Duggirala, Tadikonda Raja Gardens 2 in Guntur, Parivarthana Bhavan in Guntur Pedanandipadu V and m Kolakaluru V and M Raja Gardens 1 at Integrated Welfare Hostel and Construction of Toilets and Bathrooms to SW Girls Rajagarden 2 in Guntur Urban in Guntur District
Providing Balance infrastructural facilities such as CC Pavement Drain pipe New Building Balance work in the Hindu Burial Ground 2nd ward in the Bhimavaram Municipality
Kadapa Sewage and Septage Management in Kadapa Municipal Corporation under AMRUT Project 2016-20 - Construction of 21,000 Nos Inspection Chambers cum House Service Connections to 42,000 House Holds in entire area of Kadapa town, Providing of balance ... Field Office Building including ...
Kadapa Municipal Corporation under AMRUT Project 2016-20 - Sewage and Septage Management - Construction of 30,000 Nos Inspection Chambers cum House Service Connections to 60,000 House Holds in entire area of Kadapa town, Providing of balance sewer ... filed office building including ...
Construction of New Office Building G plus 1 storeyed including internal water supply, sanitary installations, drainage, IEI and Fans, split AC system, fire fighting with down comer system, manual fire alarm system, UPS system, LAN networking system, CC tv system, EPABX system, UPS and development works like external water supply connection, UG sump, internal roads, borewells with pump sets, rain water harvesting etc for Directorate of Mines Safety at Nellore, AP
Kadapa Municipal Corporation under AMRUT Project 2016-20 - Sewage and Septage Management - Construction of 30,000 Nos Inspection Chambers cum House Service Connections to 60,000 House Holds in entire area of Kadapa town, Providing of balance sewer ... filed office building including ...
Construction of Balance Work in Ground Floor & First Floor of Science College (Engineering) Building and Construction of Balance Work in Ground Floor & First Floor of Examination Block Building for Adikavi Nannayya University, Rajamahendravaram in East Godavari District, Est. Cost: Rs. 28.30 Crores
Consultancy services for preparation of plans & Estimates for Construction of Hostal Building for Science in Adikavi Nannayya University campus at Rajahmahendravaram. (ii) Consultancy services for preparation of plans & Estimates for Construction of Womens Hostal Building in Adikavi Nannayya University campus at Rajahmahendravaram
Construction of CC road from Kuppam-Palamenr road to DLDO Office building near Kuppam degree colleg of Kuppam Mandal Est Cost of Rs.8.50 lakhs
8199999403, 8138993472, 8133962664, 8145102162, 8181014023, 8142540564, 8133125924, 8145100143, 8144058704, 8144050014, 8144010014, 8199996924, 8144571013, 8102674823, 8145100222, 8199996384, 8140611013, 8162505174, 8144113104, 8122633064, 8122691154, 8142625404, 8144561023, 8140764744, 8102640544, 8142625414, 8122634824, 8142501034, 8140502014, 8145110944, 8102110304, 8142525964, 8144058824, 8145110954, 8142525804, 8133962674, 8142520034, 8142526954, 8144051144, 8142525324, 8144620213, 8144052763, 8181014143, 8140759384, 8144060144, 8140767054, 8199999313, 8181010764, 8140546074, 8126804004, 8102112424, 8102558554, 8122643304, 8144053804
Package No.1, Est. Cost Rs.81.50/78.95 lakhs. a) Providing internal CC roads in ST area of Chakradevarapalli (V) in Jangareddygudem (M), Est. Rs.20.00 lakhs. (b) Providing internal CC road from Anganwadi Building to NTR Colony and 2 other roads in ST area of Chintalapudi (V) Chintalapudi (M), Est. Rs.21.00 lakhs. (c) Construction of CC road from BT road to K.Ramesh (H) and 2 other roads in Gurubhatlagudem in ST area of Lingagudem (V) Chintalapudi (M), Est. Rs.24.00/21.45 lakhs. (d) Providing CC road in Kommungudem ST area of Recherla (V) Chintalapudi (M), Est. Rs.16.50 lakhs.
Package No.1, Est. Cost Rs.81.50/78.95 lakhs. a) Providing internal CC roads in ST area of Chakradevarapalli (V) in Jangareddygudem (M), Est. Rs.20.00 lakhs. (b) Providing internal CC road from Anganwadi Building to NTR Colony and 2 other roads in ST area of Chintalapudi (V) Chintalapudi (M), Est. Rs.21.00 lakhs. (c) Construction of CC road from BT road to K.Ramesh (H) and 2 other roads in Gurubhatlagudem in ST area of Lingagudem (V) Chintalapudi (M), Est. Rs.24.00/21.45 lakhs. (d) Providing CC road in Kommungudem ST area of Recherla (V) Chintalapudi (M), Est. Rs.16.50 lakhs.
Custom Bid for Services - INTENSIVE CLEANING OF SHED PREMISES, ADMINISTRATIVE BUILDING, GARDEN MAINTENANCE AND COOKING, SERVING & CLEANING ACTIVITIES OF STAFF CANTEEN ALONG WITH OPERATION & MAINTENANCE OF ETP/STP PLANT AT ELS/BZA FOR A PERIOD OF TWO.. Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
2026-Eng04-39-104 Dismantling and Reconstruction of Dilapidated Sanitary office building opp.Shadhikhana near old post office junction in ward No.39 of South zone, GVMC
Dr.NTTPS-Clearing of choked underground drains & conveyance of collected debris from various locations and elevations of Stage-I,II &III areas of Power House complex and attending carpentry assistance, health, retirement and other awarness camps ... Service building for the
Up keeping of toilets in the buildings of coal handling plant, HCSD pump house, Ash slurry pump house, Water Treatment Plant, Fire water pump house, Chemical lab, Ware house and hazardous chemical store and switch yard control building for the period from 01.04.2017 to 31.03.2018
PROVIDING TWO BORE WELLS ON THE BACK SIDE OF THE NEW DISTRICT COURT BUILDING AND ANOTHER BORE WELL ON THE BACK SIDE OF THE FAST TRACK COURT BUILDING FOR PROVIDING WATER FACILITY TO ALL COURTS IN DISTRICT COURT COMPEX, SPSR NELLORE DISTRICT (9TH CALL)
PROVIDING TWO BORE WELLS ON THE BACK SIDE OF THE NEW DISTRICT COURT BUILDING AND ANOTHER BORE WELL ON THE BACK SIDE OF THE FAST TRACK COURT BUILDING FOR PROVIDING WATER FACILITY TO ALL COURTS IN DISTRICT COURT COMPEX, SPSR NELLORE DISTRICT (9TH CALL)
Comprehensive Maintenance to various computer systems and printers at State Roads, Administration, State Architect, Rural Roads, Quality Control, Buildings, D&P, Electrical & NH wings in the O/o Engineer-in-chief(R&B), new HODs office building at MG Road, Vijayawada, Andhra Pradesh for the year 2018-2019 i.e from 01.04.2018 to 31.03.2019 (12months).Sub work : Providing AEBAS Devices to the Office of Engineer-In-Chief(R&B) at MG Road Viijayawada.
Estimate for replacing the existing 12V/100 AH Batteries - 30 Nos. and 40 KVA Online UPS System - 01 Nos. with New 40 KVA Online UPS system (3Ph-in-3Ph out) double conversion & IGBT inverter online UPS System fully Microprocessor Controller, ... Circle Office , ... Office, Building Srikakulam
Construction of New Anganwadi Building comprising one main room, one stock room and one washroom at Laxmi Nagar including all allied works as per standards, complete in all respects of 13th Anganwadi, Santhapalem of Visakhapatnam East Constituency of Visakhapatnam District. ( MP Lads)
Laying of CC road and CC Drains at SS 2B 8 Near Panchayat Building backside in Desupatrunipalem in W.No.79 of Aganampudi Zone of GVMC
Name of the Work : Construction of Additiional Toilet Block (7B+7T) and Maintance & Repairs to SW Boys Hostel No. 1 and Construction of Additional Toilet Blocks (6B+6T) and Repairs to SW Boys Hostel No. 2 and Construction of Additional Toilet Blocks ... Boys Hostel Building at ...
Construction of Girls Hostel (G plus 2) floors for 100 trainees or SRFMT and TI Tractor Nagar at Garladinne Anantapur Andhra Pradesh including internal and external water supply lines sanitary installations drainage internal and external Electrical ... Girls Hostel building .
Construction of Girls Hostel (G plus 2) floors for 100 trainees or SRFMT and TI Tractor Nagar at Garladinne Anantapur Andhra Pradesh including internal and external water supply lines sanitary installations drainage internal and external electrical ... Girls Hostel building
Construction of Additiional Toilet Block (7B+7T) and Maintance & Repairs to SW Boys Hostel No. 1 and Construction of Additional Toilet Blocks (6B+6T) and Repairs to SW Boys Hostel No. 2 and Construction of Additional Toilet Blocks (7B+7T) and ... Boys Hostel Building at ...
Laying of CC Road From PRT school To 14/603, EP No P2/6 to 13/358-2, from Backside of DNo 13/213 to D.No 13/217, Opp to 14/604-1, CC Drain at 13/217, from PRT School to 14/603, at Sri Shakthi Bhavan in Indira Nagar 19th Ward in Dharmavaram Municipality Under General funds 2023-24-2nd call
Laying of i)CC Road from bhimireddy sitaramswami house(1-19-450) to gurram veerababu house (1-19-453) ii) CC Road from bhimineni srinivasarao house (1-19-464) to upadihaami bhavan iii) CC Road from voora rajababu house (1-19-475) to (1-19-477) house in 1st ward of yeleswaram nagar panchyat under 14 Fc Basic Grant (2017-18)
Laying of CC Road From PRT school To 14/603, EP No P2/6 to 13/358-2, from Backside of DNo 13/213 to D.No 13/217, Opp to 14/604-1, CC Drain at 13/217, from PRT School to 14/603, at Sri Shakthi Bhavan in Indira Nagar 19th Ward in Dharmavaram Municipality Under General funds 2023-24
Construction of CC Drains in Ramalayam street, 450mm CC Drains and RCC Culverts in 2-324 to BASHA MESS, SAI RAM APARTMENT TO 2-336, BASHA MESS TO RAJ BHAVAN 2-230 TO 2-170-1,2-301-A TO 2-302-G SV1 COLONY, 450MM CC Drains in SOCIETY COLONY 1ST MAIN 2ND CROSS in 26th ward in Madanapalle Municipality under General fund
Laying of CC Road, CC drain, CC Culverts at Ushabharathi school to Forge Bhavan ,EPNO:75/A/6 to 75/A/8 , dno:9-13-81/2 to 9-13-80,DNO:9-13-85/2 to DNO:9-13-85/2 to 9-13-85/3 in New Resapuvanipalem and Siddarthanagar ward no 22 of GVMC, Zone III.Reserved for SC/ST society