Loading…
Loading…
7,400 results • Best match
Construction of CC roads From Vaddera Bhavan To Church,From Tanniru Venkateswarao House To Tanniru Srinu House,From Pachinilla Satyavathi house TO Inapanuri Jamalayya house, From Karri Brahmaiah House TO Guguloth venkateswarao House and From Seelam Renuka house TO SK Ali House. and CC drains From Onteddu Venkateswarao house to Main road,From Alla Samba sivarao House TO Regumudi Narasimaharao house,From Sreepati Pullaiah house to Puvvanapu Marayya house,From Jangala Community Hall TO Puvvanapu Srinu and from Mamilla Chinna Krishna To Gunja Venkateswarao in Ward No.13 in Sathupalli Municipality under Special Development Fund 2023.(Reserved for SC)
Providing of decorative series lights on hire basis at Kapra Nacharam Circle office building and various junctions like ECIL Junction, Elephant Chowrasta, Mallapur, Telangana thalli statue, Amaraveerula stupam, Chakripuram junction in Kapra Nacharam Circles, Uppal Zone, MMC in view of TELANGANA STATE formation day for 2 days i.e 01.06.2026 to 02.06.2026
MAINTENANCE OF ARBORICULTURE AND LANDSCAPING WORKS FOR DSST AND ANVESHA BUILDINGS AT DSP LAB SINT BUILDING FOR ASL AT RCI and NANO BUILDING AT DMRL AT RCI, HYDERABAD
Carrying out Expansion and Revamping of S and D building for accommodating control panels of S and D automation and other Maint and safety systems at Thimmapur BP
Providing EI Fans, UPS wiring in proposed rooms for Mini DC, GR site for SZ Main DC GR site for NMS under Phase IX.2GSM Project at 7th Floor, Telephone Bhavan, Saifabad, Hyderabad. SH Modification of Panels, supplying and fixing of new switchgea
Laying of C.C. Road(narrowlanes) near H.no.13-1-1236/293/E/80/2 to near H.No.13-1-1236/293/A/85 back side Rani avanti bai bhavan fin 63-mangalhat under Division 14, (KZ)GHMC (Rs. 3.75 Lakhs) (Reserved for ST)
Providing of decorative lighting (20 nos 120 W LED, 150 nos. of LED Series lamps and 25nos LED Power cans) for 2 days (01-06-2026 to 02-06-2026) at Bandlaguda Jagir Municipal Office Building in Rajendra Nagar Circle-19 of Rajendra Nagar Zone, GHMC in view of Telangana Formation Day - 2026
Providing of decorative lighting (35 nos 120 W LED, 120 nos. of LED Series lamps and 20 nos LED Power cans) for 2 days (14-08-2026 to 15-08-2026) at Rajendra Nagar Zonal Office Building in Rajendranagar division (120) and Constituency in view of Independency Day on 15 th August - 2026
Dark Fiber Lease Service - Kilometer Based - Dry Lease; Single Mode
Automatic Compression Testing Machine 2000kN
Supplying and fixing of Central Mixer Amplifier Control unit, Supplying and fixing of Conference Delegate Microphone Unit, Supplying and fixing of conference Chairman Microphone Unit, Supplying and fixing of 10W plastic or metal cabinet wall mounting speaker, Supplying and fixing of Dual VHF Wireless microphone System, Supplying and fixing 2 core x 1.5 sqmm Spreaker cable, Supplying and fixing of 15U Metal Mounting Audio Rack, Supplying and fixing of Audio Interface
SITC of 15HP open well mono submersible type pump set, SITC of indoor floor mounting cubicle metal clad Pump Panel, Providing and laying of 80mm dia C class GI pipe, Supplying and laying of 3 core 10 sqmm flat submersible copper cable, Supplying and of 40mm dia B class GI pipe, Removing of existing old pump sets, Supplying and fixing of 50mm CPVC pipe, Supplying and fixing of 50mm brass ball valve, Supplying and fixing of 50mm CPVC Union
Online UPS (V2) (Q2)
Fixed Computer Workstation (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6392002 Dated : 02-07-2025 Bid Document 1/9 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Sofas (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6526038 Dated : 05-08-2025 Bid Document 1/7 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6522250 Dated : 05-08-2025 Bid Document 1/11 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3)
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover
AIO Computer
Power Generator - DG Set (up to 900 KVA) (Q2) (3 (3 ))
Vibratory Cup Mill
Renewal of existing RPA licenses used for Commercial Billing process
Database Management System Software (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Providing General servicing, minor repairs of 2X500KVA EA sets at TE building Saroornagar, Hyderabad; Power Generators; Service Provider
Supplying and fixing of 3 HP openwell submersible pumpsets, Supplying and laying of 3 core 2.5 sq.mm flat submersible cable, Supply and Fixing of 3 phase DOL starter, Supplying and fixing of 50mm dia uPVC pipe, Supplying and fixing of 50 mm Non return Valve, Supplying and fixing of 50 mm dia Ball Valve, Dismantling of the existing monoblock pumpsets
Load Cell- 3000kN
Supply of 7TR Precision package AC units, ITC of Precision PAC units, SITC of 15.9 mm dia. hard drawn copper refrigerant piping, SITC of 22.2 mm dia. hard drawn copper refrigerant piping, Supplying and Laying of 2x2.5 Sqmm copper cable, Supplying and Laying of 4x16 Sqmm Aluminium cable, Providing and fixing 40 mm dia CPVC pipe, Providing and fixing 19 mm dia.CPVC pipe, Supplying and installing of 150mmx50mmx1.6mm GI cable tray, Supplying and installing of 300mmx50mmx1.6mm GI cable tray, Supplying and Fixing of 25mmx3mm GI Strip, SITC of unit mounted motorised volume control damper, Providing flexible Double Layer canvas
Supplying and fixing of 1.5 HP submersible pumpset, Supply and Fixing of 1 phase DOL starter, Supplying and laying of 3 core 4 sq.mm flat submersible cable in HDPE Pipe or trench, Supplying and laying of 3 core 4 sq.mm flat submersible cable on surface of wall, Supplying and laying of 3 core 4 sq.mm flat submersible cable in soft soil
Schedule 1- M660499009- HC CHEM FLTR, DRISORB508, BRY-AIR, DAP20004, Schedule 2- M6604990095-HC CHEM FLTR, DRISORB515, BRY-AIR, DAP20004, Schedule 3- M6604990094-HC CHEM FLTR, DRISORB520, BRY-AIR, DAP20004
Lead Acid starter Batteries (Q3) (3 (3 ))
8zone Microprocessor based fire alarm panel, 4zone Microprocessor based fire alarm panel, Multi sensor smoke detector, Heat combination, 150 x 150 x 40mm MS box, ABS Manual push button station, 95-105db ABS hooter, Response Indicators, 2 x 1.5 sq.mm FRLS copper cable, End termination, 4.5 KG Co2 Fire extinguisher, 9Lts capacity Fire buckets, Refilling of 4.5 KG Co2 Fire extinguisher, Hose pipe of standard length, Horn, Wheel
Load Cell- 1000kN
75 KG (Nominal Charge) Capacity wheeled mounted DCP Fire Extinguisher conforming to BIS 16018:2012 (
SITC of 2 HP Submersible pump set, Supplying and fixing of control gear suitable for above 3 HP submersible pumpset, Supplying and laying of 3 core 4 sq.mm flat submersible cable in HDPE Pipe or trench, Supplying and laying 1.5 sq.mm single core copper cable, Supplying and laying of power supply cable of size 4x10 Sqmm, Supplying and lowering of 40mm dia HDPE pipe, Supplying and laying of 40mm dia CPVC pipe, Removing of the existing submersible pumpsets
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) (3 (3 ))
Multimedia Projector (MMP) (Q2) ( ( 3 3 ))
Inductively Coupled Plasma Optical Emission spectroscopy
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) (3 (3 ))
Power Generator - DG Set (up to 900 KVA) (Q2) (3 (3 ))
Addressable micro Processor Fire Alarm Panel, Repeater Panel, Addressable multi-criteria detector, Addressable Rate of Rise and Fixed temperature detector, Addressable Manual Pull Station, Addressable Monitor Module, Addressable Control Module, Sounder cum Strobe, 2 x 1.5 sq.mm FRLS copper cable, GSM based Auto Dialer, Power supply unit, Response indicator, Removing of existing scrapped FA system, 6W Public Address system, Power amplifier of 480W output, 6 Zone call Station, 2 core x 1.5 sqmm flexible copper cable, 20 mm dia PVC conduit, 15U rack for accommodating PA system
3HP openwellPump, 3x2.5 Copper cable, DOL starter, 50mm UPVC pipe, 50mm NRV, 50mm Ballvalve, Removing of the faulty submersible pump
8zone Microprocessor based fire alarm panel, 4zone Microprocessor based fire alarm panel, Multi sensor smoke detector, Heat combination, 150 x 150 x 40mm MS box, ABS Manual push button station, 95-105db ABS hooter, Response Indicators, 2 x 1.5 sq.mm FRLS copper cable, End termination, 4.5 KG Co2 Fire extinguisher, 9Lts capacity Fire buckets, Refilling of 4.5 KG Co2 Fire extinguisher, Hose pipe of standard length, Horn, Wheel
20 zone Microprocessor based Integrated Networking type fire alarm panel, 12 zone Microprocessor based Integrated Networking type fire alarm panel, 8 zone Microprocessor based fire alarm panel, Multi sensor smoke detector, 150 x 150 x 40mm MS box, ABS Manual push button station, 95- 105db ABS hooter, Response Indicators, 2 x 1.5 sq.mm FRLS copper cable, End termination, Dismantling of Fire detection panels, Dismantling of Detectors on False Ceiling Super ceiling below false flooring, Dismantling of Detectors above False Ceiling
Attending emergency break down of HT services, Reconditioning of HT panel, Filtration of Transformer oil, Arresting of Transformer Oil leakage, Top up of transformer oil, Replacement of silica gel breather, General servicing of 3 panel HT panel, 230V AC 80 or 100 Wats Space Heaters, Heavy duty stem Type Safety Thermostat, 6 Amps DP MCB, Supply and wiring of 2.5 sqmm copper wire, 2core x1.5 sqmm Copper Armoured Cable, Monoplast sealings for all HT terminations, General servicing of ACB in the MV panel, General servicing of MV panel, Cleaning of HT Yard, General servicing of existing Air Break switch, 63 Amps 3P MCB for Capacitors, 63 Amps HRC Fuse Links, 6 Amps HRC Fuse Links, LED indication lamps, 20 KVAR Capacitor, 10 KVAR Capacitor, 5 KVAR Capacitor, 96 x 96 mm Digital Ammeter, 95 Sqmm XLPE HT Cable, Heat Shrinkable joint kit, Testing of the existing IDMT relay, Testing of earth pits, Supply and fixing of 11 KV grade post top or pin Insulator, Supplying and fixing of 9KV, 5KA rating Lightning arresters
Database Management System Software (V3) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6828626 Dated : 28-10-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 40 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : AGM(CM) Cc-eoc Noida, NA, NTPC Limited, Ministry of Power (Ntpc Limited)
Load Cell 2000 KN
SITC of 8 Channel NVR, Supplying and fixing of unmanaged PoE 8 Port switch, Supplying and Fixing of 2MP IR Fixed Dome Network Camera, Supplying and fixing of 3.5 inch4TB Hard disk, Supplying and drawing of CAT 6 SFTP 23AWG cable, Supplying and fixing of 25mm medium class PVC pipe, Making of end termination with RJ45 pins, Supplying and fixing of MS powder coated Cabinet, Supplying and fixing of 19 inch FHD LED Monitor, Portable Fire Extinguisher 4.5Kg CO2 type
Cutting Mill
Desktop Computer/PC (All-in-one) with Customized Specs, Desktop PC/Computer with Customized Specs
Infrared Medical Thermometer For Measuring Body Temperature