Loading…
Loading…
1,865 results • Best match
INSTALLATION OF POLES FOR LIGHTING ARRANGEMENT INCLUDING CABLE LAYING WORK FOR PHOOLBAGAN HEAD WORKS WD-101
REPAIRING OF ELECTRICAL WIRING WITH THE ARRANGEMENT OF UNDER GROUND CABLE LAYING AT MACHINE SHOP EWS
Laying of 33 KV UG cable ( XLPE 400 SMM) from Haldia 132/33/11 KV Sub-Station to the point of supply of Exide -II, under Haldia Division, WBSEDCL
Supply and laying of 4 core 25 sq.mm XLPE UG cable with HDPE P-100 50mm dia pipe at Naihati Arabinda Road under Naihati Municipality.(Total works 1450 M)
Laying of 12mtr 300 sqmm XLPE 11 KV UG cable by Microtunneling with 160mm dia PE80 PN6 HDPE with 2793mtr open cut method from Kanchrapara substation to Ramkrishna colony
Construction of Cable trench, switchyard development, approach road, pathway, Fencing wall , Equipment foundation(VCB, CT and Transformer plinth), drainage system and allied work at Nilganj 33/11KV Sub-station under Barasat Division, 24Pgs(N)
Construction of Transformer base for Installing Transformer and Cable Trench for HT LT Line at Kotshila Pump House Campus under Kotshila W/S Scheme under Purulia Sadar Sub-Division under Purulia Division,PHE DTE .
Extension and Renovation of Control Room Building with Construction of Cable Trench, Switchyard Development, Construction of Boundary Wall, M.S. Jail Type Gate, Approach Road, Surrounding Area Development and other ancillary Civil Works at Goatore
Construction of Cable trench, 1 no CT, 1 noVCB, 1 no cable support structure and other allied civil works at Mallarpur 33/11 KV Sub- Station under Rampurhat Division in the District of Birbhum.
Construction of collapsed Boundary wall Heightening of Existing Boundary wall adjacent to Switchyard Construction of Switchyard Fencing and Pathway reconstruction of damaged Cable trench alongwith Cover slab and other allied civil works within the
Restoration of Cable Trench including necessary protection works near Transformer and Substation room at Mechanical Power House Yard and improvement of Drainage system in different spots at Uttarbhag Pumping Station Campus including necessary allied
Construction of underground cable duct after removing of old damaged cable duct due to construction of toilet cum restaurant at benfish more at Sector-V, under NDITA.
DEVELOPMENT OF FOOTPATH WITH UNDERGROUND CABLE DUCT ALONG KALI TEMPLE ROAD FROM KALIGHAT ROAD TO S P MUKHERJEE ROAD AND ALLIED CIVIL WORKS IN WARD NO 083.
Supply and laying of underground cable along with installation of one cable joint box including rearrangement of the existing service cable for COFAM at N.B.U. main Campus
Construction of underground cable duct at Street No. 04, 08, 14, at left side road from Times of India to Webel Bhavan at sector-v, Under NDITA.
Supply and laying of underground cable along with erection of two new Feeder Pillars near RS Boys Hostel and Engineering Store within the main campus of NBU.
DRAWING OF UNDERGROUND CABLE FROM LALUBABU PAKA FOR CONSTRUCTION OF 2ND 33KV SOURCE OF NERADEUL 33/11 KV SUB-STATION THROUGH MICRO TUNNELING MANNER UNDER GHATAL DIVISION.
Electrical installation works for illumination of Institute Block Court Yard and Supply and laying of new underground cables for staff quarter at The WB National University of Juridical Science Sector III Salt Lake Kolkata 700 098
All as per BOQ
Supply and laying of cable at 10 bedded dialysis unit attached to Alipurduar District Hospital in the district of Alipurduar
RESTORATION OF PAVER BLOCK PASSAGE DISTURBED DUE TO LAYING OF CABLE AND OTHER ANCILLARY WORK AT CHAPLIN OFFICE BUILDING COMPOUND
Shifting of 500 KVA DG with AMF Panel to the Substation Building within the Hospital Campus along with necessary Cabling work at Alipurduar District Hospital.
Work for Conversion of 11 KV Overhead line crossing the electrified railway track to under ground UG Cable near the premises of sail under Serampore D Division of Hooghly Region.
DRAWL OF 33 KV UG CABLE FROM F.C.D.A 220 kV GRID SUB-STATION TO AMTA INDUSTRIAL PARK OF HOWRAH-II DIVISION OF HOWRAH REGION, WBSEDCL IN THE DISTRICT OF HOWRAH
Drawal of new 33KV line (2nd source) HT UG Cable 3CX400Sqmm XLPE from Tamluk GSS to Nimtouri 33/11KV Sub.Station, District-Purba Medinipur under Tamluk Division of Purba Medinipur Region
Construction of Equipment Foundations, Cable trench, Pathway, Approach Road, Fencing and development of Switchyard and allied works for new 33/11 kV spread out type Sub-Station at Kelomal under Tamluk Division Dist.- Purba Medinipur
Painting of Garden Wall, Cable Trench, Fencing Wall along with Fencing, Filling of Garden and Compound Area, Fitting andFixing Paver Block, Fixing Chain Railing, Supply and fixing of Mexican Grass, of False Ceiling .....2nd Call
Mtc work at 28 1A Gariahat Road Housing Estate for repairing of damaged concrete road replacing RC cable trench cover renewing damaged shouldering with concrete paver block and allied works under Kolkata South I Division
Erection and Construction of Structural foundation for 01 no. CT 01 no VCB including construction of cable trench, pathway and allied works for bay extension at Uttarbhag 33/11 kV S/Stn under Canning Division
Bay extension by Construction of Cable Trench, CT, PT, VCB plinth and Switchyard Development with allied civil work for Charki PHE site at Manbazar 33/11 KV Sub-Station under Raghunathpur (D) Division, Dist Purulia
Renovation of Control Room Building floor wall by supplying fitting fixing of vitrified tiles marble slab digital ceramic tiles Painting inside of control room building Construction of cable trench inside the CR portion at Tarakeswar
Extension and Renovation of Control Room Building along with Construction of Boundary Wall, Approach Road, Cable Trench, Switchyard Development, Surrounding Area Development, Drainage System, and other ancillary Civil Works at Boria 33/11kv s/s
Development of Switchyard,construction of cable trench,renovation of fencing,new pathway ,laying of chequered tiles and other ancillary civil works at the existing Habibpur 33/11 kv Substation under South Malda Division, Dist- Malda
Construction of foundation and plinth of PTR CT VCB and Construction of new bay Cable Trench Pathway and other allied civil works at Ijjatganj 33 11 KV Sub Station under Durgapur Division Dist Paschim Bardhaman
Renovation of existing Switchyard including gravel respreading Construction of collapsed Boundary wall construction of Cable trench cover slab Development of 11 KV yard and Switchyard Pathway other allied civil works within the premises of Lachipur
Strengthening of existing boundary wall by bullah pilling (L-200m) with outside painting of Control room Building switchyard concreting cable trench and allied works at Chandpala 33/11 kV S/Stn under Diamond Harbour Division
Construction of 100 Bedded Critical Care Block CCB G Plus 3 at Nadia District Hospital , Saktinagar Campus in the District of Nadia_Construction of Chiller Plant, Gas Manifold Room, Sub-Station and R.C.C. Electrical Cable Trench.
New Cable laying work from 33 KV sub-station to ADM Main panel at IIMC Campus, Joka.
Renovation and modification of outdoor streetlight, replacing old overhead service line by underground cable at Bhatar irrigation campus to be executed through DMED during the year 2024-25
Supply and laying of cables for taking power to the barge, installation of pump and allied works under Bathanbari w/s scheme under PMD, PHE Dte. in the district Purulia.
Supply and Installation of LED outdoor Street lights on existing Steel tubular Pole, cable looping boxes, Supply and Laying of Cables etc. at Khatra SubDivisional Court CompoundKhatra, BankuraUnder Khatra ElectricalSectionII.
Panel Work
Laying of cable and other works at Augmentation of Bolpur Water Supply Project Zone x under Bolpur Mechanical Divn. PHE Dte
RESTORATION OF ROAD AT GIRI BABU LANE DISTURBED BY CESC FOR LAYING OF CABLE OF ISLAMIA HOSPITAL IN WARD NO 44
Supply and laying of cable for submersible pump motor sets at Sutaboi W/S scheme under Purulia Mechanical Division, P.H.E., Dte.
Supply and laying of cable to supply power to the AC installed at electrical panel room of IT Department under KMC.
Repairing of pumping machineries and supply and laying of cable related to Phase-II at WTP, AA-I under NTK Project.
Supply Laying of cable for power connection to signage Board and different area under MAR 1111 New Town Kolkata under WBHIDCO
Supply and installation of Main switch, MCCB and some ancillary works and laying of cable for AHU at Nazrul Mancha, Kolkata
RESTORATION OF RD. DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT DAKSHIN PARA AND HORITOKITALA IN WD. NO.-114