Restoration of damaged surface of road at bell mouth portion due to open trench cutting done by CESC for laying high tension underground cable from the crossing of Indra Biswas Road and Jessore Road Ch 6 point 745 kmp to CESC Belgachia Distribution
Operation and maintenance of underground Cable conduit including inspection Chamber Pit from Philips More to Ring Road (both side of the road) and from 215 Bus Stand to Webfill Office near AQ-11 (one side of the road) at Sector-V, under NDITA.
Emergent restoration of damage of Garia-Mathurapur Road from 26.00 km to 30.00 km( R/S) as damaged by WBSEDCL during laying of underground cable in the district of South 24 Parganas under South 24 Parganas Division, PWD during the year 2024-2025.
Restoration of road crust with blacktop surfacing related cutting of Ghoshpara road at chainage 15.40 (approx.) for a length of 12.00 mtr. By CESC (32/2, East Ghoshpara Road) for emergency repair of underground cable, during the year 2026-27.SL 01
Restoration of road crust with blacktop surfacing related cutting of Ghoshpara road at chainage 15.25 (approx.) for a length of 10.00 mtr. By CESC (32/2/6, East Ghoshpara Road) for emergency repair of underground cable, during the year 2026-27.SL 02
Making masonry trench from transformer to LT PDB Panel, Supply and laying of cable from LT PDB to ATS for V.T. pump at Kalyaneswari Head Works under RCFA Part-I W/S scheme.
Supply and laying of cable and other allied works for low lift pumping machineries at Bhandirbon Piped water supply scheme under Suri-I in the Dist of Birbhum under Bolpur Mechanical Division,P.H.E.Dte.
RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT GOSTOTALA NEW SCHEME ROAD FROM 1A- 82/4 TO T-93, SUBHAS PALLY IN WARD NO. 111 UNDER BR XI.
Supply, delivery and installation of Submersible Pumping Machinery in new deep tube well and laying of cable line along with allied works at Madandi water supply scheme under Purulia Mechanical Division, P.H.E. Dte.
FABRICATION AND INSTALLATION OF NEW FEEDER PILLAR BOX INCLUDING LAYING OF CABLE FOR DISTRIBUTION OF L.T POWER TO THE FLOWMETER AND VALVE OPERATOR ROOM WITH OTHER ANCILLARY WORKS AT WTP II UNDER GRWW
RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT USHA PALLY FROM CROSSING OF BORAL MAIN ROAD TO T- 78 USHA PALLY IN WARD NO. 111 UNDER BR XI
LAYING OF CABLE FOR OPERATING BIG-DIA TUBEWELL AND ALLIED WORK AT N. K. GHOSHAL ROAD AND KUMAR PARA SHITALA MANDIR IN WARD NO. 91 AND PADDAPUKUR HOLYDAY CLUB IN WARD NO. 98.
INSTALLATION OF ELECTRICAL OPERATING SYSTEM WITH CABLE LAYING OF NEWLY INSTALLED BIG-DIA TUBEWELL AT BAISNAB GHATA IN WARD NO. 100 AND KHANPUR PRAVAT SANGHA IN WARD NO. 98.
Replacement of pump motor set , column pipe ,cable laying and allied other works at OHR and PH-II of Chaknakaijuri water supply scheme under Bankura Mechanical Division,P.H.E. Dte.
Cable laying work at Malda Court Compound Providing Electrical Connection for LED Display in the front of Ejlas of Malda Court and some repairing work at Malda Court premises
Compound illumination including cable laying installation of high mast and other allied electrical works at open ground Reservoir at Lava Lake under Neorakhola WS and Mtc Division PHE Dte
Cable laying from river bed site to pump house at kashipur water supply scheme of augumentation and other allied works under PMD, PHE Dte in the district of purulia.
SURVEY OF CABLE ROUTE EARTHING COMPLETE EXCAVATION OF SOIL FOR CABLE TRENCHES EXCAVATION OF SOIL FOR CABLE TRENCHES BY CUTTING CEMENT CONCRETE SUPPLY 1ST CLASS KLIN BURNT BRICKS LAYING 1ST CLASS KLIN BURNT BRICKS LAYING OF 33 KV CAB
Referred to NIT
Distribution wiring, S and F of distribution board, AC power plug, Cabling work and S and F of Different type of Electrical accessories at different officees of Unnayan Bhawan. Different type of Electrical work at different places of Unnayan Bhawan
laying of 11 KV UG cable 3 Core XLPE 300 Sq mm of total length 2500M including micro tunneling 2300 M for drawl of new 11 KV feeder with other allied works from Megacity 3311 KV Sub Station iro Botanica Housing Project under Rajpur CCC of Garia
Laying of 33 KV 3C X 400 sq. mm. XLPE UG Cable from Mayapur 33 by 11 KV Substation to the premises of MS ISKCON at Mayapur (R.L. 2.71 KM) for Bulk power supply at 33 KV with ultimate contract demand of 4000 KVA i.r.o MS ISKCON.
Road restoration work due to damage of road for laying of the 220KV UG Cable to supply electric power from BHANGAR PGCIL 400 KV to NEW TOWN_IIC 220/132 KV by WBSETCL at i) Patipukur Rajarhat road from 7.00 to 9.58km, ii) Dumdum Laohati Road from 8.25
New HT bulk connection i.r.o The Partner Yash Jain of Anjy Estates LLP at Shubharara by laying of 11 KV UG Cable with 185 Sq. MM 3C XLPE 450 Mtr. Through Micro-Tunneling and 60 Mtr. in the existing Trench under Uluberia Division of Howrah Region
Laying of 11 KV UG cable 3 Core XLPE 300 Smm of total length 3400M including micro tunnelling 3300M for drawl of 2 nos new 11 KV feeder from two separate 33KV Ss ie from 4Sight Florence 33 KV SS(ongoing) and from Ozone 33KV Ss
laying of 11 KV UG cable 3 Core XLPE 300 Sq mm of total length 1050M including micro tunneling 950 M for drawl of new 11 KV feeder from Devaloke Sonarcity 3311 KV Sub-Station to effect the HT Bulk Connection of Teghoriya Booster Pump Rajpur Sonarpur
Laying of 33KV 3CX400 sq mm XLPE cable for VECC Feeder 1 and VECC Feeder 2 from DL Block to VECC via Karunamoyee Footpath under IPDS under Bidhannagar I Division WBSEDCL
Restoration work by supply and laying of cable and other allied works at Chandrapur Piped water supply scheme under rajnagar Block in the Dist of Birbhum under Bolpur Mechanical Division P H E Dte
Supply, delivery, Delivery and Installation of pump, laying of cable and other allied works at Bhandirbon Piped water supply scheme under Suri-I Block in the Dist of Birbhum under Bolpur Mechanical Division,P.H.E.Dte.
RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT ATABAGAN B BLOCK AREA FROM PRE. NO. B60/1 TO 100,BORAL MAIN ROAD IN WARD NO. 111 UNDER BR XI
RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT GHOSH PARA ROAD FROM V-53/6 TO V-54/43 GHOSH PARA ROAD IN WARD NO. 111 UNDER BR XI
Metering KIOSK, XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098, Laying of cableDirect in ground, Laying of cableOn surface, Laying of cable Hanging in air, Cable termination
Supply, delivery and laying of cable at street No 3333, 3333 (service rd), 880, 852, 568, 374, 687, 326, 299, 278, 326, 2222, 902, 644, 702 and other streets at Newtown, Kolkata under NKDA
RESTORATION OF TRENCH DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT ADI GANGA CANAL SIDE ROAD FROM 2 NO. USHA GATE TO 14, SUBHODH PARK IN WARD NO. 112 UNDER BR XI
Construction of underground cable duct by 3 nos 150mm. Dia. HDPE pipe with Manhole including 7 nos. 40mm. Dia pulling in 1no. 150mm dia. HDPE pipe both side/ one side footpath of the road, (i) Infinity building to Plasto Chemical (ii) RDB to Fishery
Construction of underground cable duct on one side of footpath ( 3nos. 150mm dia , 1 side)including Supplying Duct pulling 7 Nos 40/33 mm. HDPE Ducts with allied works (Phase - II) from old 201 Bus Stand to 215 A bus stand along Ring Road
Supply and Installation of CCTV camera in the pathway of Kanyashree including replacement of garden lights and LT cable laying arrangement at Kanyashree , Uttarkanya, Kamrangaguri in the District of Jalpaiguri.
Urgent cable laying works for new Power connection for the replacement work of the 2 (Two) nos. existing 13 Passenger Lifts at the Zilla Adalat Bhaban, Barasat, North 24 Parganas.
Providing additional LED light outside POD 1 POD 3 and cable laying near clock tower to provide power supply for proposed toilet installation New Town Kolkata under WBHIDCO O PALPDCT
Restoration of Main LT power line from WBSEDCL meter to distribution PANEL by supply and laying of cable and allied electrical works at Simlapal water supply scheme of Bankura district under Bankura Mechanical Division P.H.E.Dte.
RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT SAHID BENOY BOSE ROAD FROM 1 NO.SAHID BENOY BOSE ROAD TO BENOY BALLIKA GIRLS SCHOOL IN WARD NO. 113 UNDER BR XI
Urgent Repairing of Roads in Between Broadway Road and WT-12 (FE BLOCK SIDE) damaged due to laying of Cable Line by AIRTEL and WBSEDCL within Ward No-33 under Bidhannagar Municipal Corporation.(Deposit Work).
SUPPLY, FITTING AND FIXING NEW LED LIGHT FITTING INCLUDING LAYING OF CABLE ALONG THE ROAD FROM MAIN GATE NO-2 TO POLICE BARRACK AND SURROUNDING AREA OF STAFFS ROOM NEAR GATE NO-2 UNDER GRWW.
Construction of Office building G plus 4 for the Income Tax Department at West Bengal including Internal Water Supply and sanitary installations, drainage, sewer line, underground water sump and electrical work with Internal Electrical Installation ... AC cable laying earthing ...
Road restoration work due to damage of road for laying of the 220 KV UG Cable to supply electric power from BHANGAR PGCIL 400 KV to NEW TOWN IIC 220/132 KV by WBSETCL at i. Patipukur - Rajarhat Road from 7.00 Kmp. to 9.58 Km. ii. Dumdum - Lauhati Ro
Shifting of 33KV Line of Ckt 1 and Ckt 2 of new Dhulian 33 11KV Substation by 3Cx400 SQM XLPE UG Cable at LC Gate No 42 located at KM 239 By 8 to 9 between Basudebpur and Dhuliyan Ganga Railway Station for construction of new Railway Underpass under
Laying of 11 KV UG cable 3 Core XLPE 300 Sq mm of total length 3450M including micro tunnelling 3450 M for drawl of new 11 KV feeder from Renia 33/11 KV Sub-Station to Julpia Boaster Pumping Stationat KMC Ward No. 142 under Garia Division, WBSEDCL
Diversion and Shifting of 11 KV Town feeder from Majilpur 33/11 KV Sub/stn to Sabuj Sangha Club by 3CX300 SQMM UG cable RL-0.53 KM for safety point of view to bypass overhead line over POND emanating from Majilpur 33/11 KV Sub-station under Jaynagar
Withdrawing lowering of pump motor set ,cable laying,Repairing of Pump Motor set and allied works at CWR site of Kathjuridanga (Ashna) water supply scheme under Bankura Mechanical Division PHE Dte.