Loading…
Loading…
4,221 results • Best match
Unbranded 1 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid, Unbranded 1 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid Conductor
MESCAB 1 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid, MESCAB 1 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid Conductor
MESCAB 1 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid, MESCAB 1 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid Conductor
Unbranded 2 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid, Unbranded 2 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid Conductor
Unbranded 4 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid, Unbranded 4 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid Conductor
Unbranded 1 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid, Unbranded 1 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid Conductor
havells 4 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid, havells 4 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid Conductor
shyam cable 4 Core Type ST1 Sheath Pvc Aluminium Cable With Rigid, shyam cable 4 Core Type ST1 Sheath Pvc Aluminium Cable With Rigid Conductor
Work contract for erection of H-beam pole and laying overhead conductor of rating 415 V at ash dyke of phase-1, SSTPP, MPPGCL, Dongalia
Estt. For 01 km of 11 kv line on H-beam with Dog conductor average span 40 meter for urban area under Danish Kunj D.c
Estimate for proposed 11 kv Deori Dom. (S/s Deori To Deori Dom.) Feeder 7KM 11KV Line Conductor Augumentation Under Deori DC ONM Dn. Bareli
Unbranded 2 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid, Unbranded 2 Core Type ST2 (HR) Sheath Pvc Aluminium Cable With Rigid Conductor
Estimate for 11 Kv Conductor augmentation from S/s Madkhan singh ki Factrory to Khanota village under Suthaliya DC under O N M Division Biaora
ESTIMATE FOR CONDUCTOR AUGMENTATION OF 11KV FEEDER AT LOCATION PACHORE ROAD TO 100 KVA SONI WALA DTR UNDER BODA DC. O n M DN. NARSINGARH
Estimate for Conductor Augmentation of 11 KV Kajlash Feeder Emanating from 33/11 KV Tigariya S/s Under Dolariya under O and M Division Narmadapuram
Estt for conductor augmentation og 11 kv Umariya Pump feeder from Kaladev to Umariya under Lateri under Tyonda D/c of Oand M Division Basoda.
Est. for Augumentation of 11 KV Conductor under General SSTD Scheme at Bhaisana to Sikrouda under SPR R D/c under OnM Dn. I Shivpuri.
Construction of CC Road at ward 27 New Kajipura Mohammad Lohar house to Aklim house and Salim Conductor house to Rafiq Pinter house.(II call)
Estimate for conductor augmentation 2.6 Km at 33/11 kv S/s Gorai to Raghu ka pura Pump (scheme- EFSU- SSTD) Under ron D/c
Estimate for Conductor Augmentation of 11 KV Pathriya pump Feeder at location Village at location Village Khatakhedi to Shankarpur Bhandha 5 km in Chhaphiheda Dc.
ESTIMATE FOR CONDUCTOR AUGMENTATION OF 11KV KANDARA KOTRI PUMP FEEDER AT LOCATION KANDARA KOTRI TO BIRAM PIPLIYA UNDER BODA DC. O N M DN. NARSINGHGARH.
Estimate for Augumantation of 10 KM 11 KV Keljhiri Feeder Conductor and 50 No. Mid-span Pole under Rehatgaon DC under OandM Harda South Division.
Estimate for 33 kv Conductor Augmentation from S/s Chatha Tepping to Chatha S/s Under Biaora R D/c. O N M Dn. Biaora
Works for 11 KV line with Insulated Conductor Proposed for Omkareshwar Simahastha at Vill. Omkareshwa under (OnM) division Khandwa-I. Estimate no- 431222 Dt.06.03.25.
Estt. for conductor augmentation of of 11 KV water works feeder from 33/11 KV Sironj S/s to basoa naka under Sironj T DC
Estt. For Proposed for Providing conductor theft of 11 KV Atarikhejda pump feeder near at Village Nolai and Dighore NH-146 Road under Gyaraspur DC
Estt for conductor augmentation from 33/11 kv sirnota s/s to 11 kv Bhilaya Pump feeder under Tyonda DC of Oand M Division Basoda.
Estimate for 11 KV Line Conductor Aug. At Barkhana feeder Various location Barkhana S/S to Naigadi Madaukhedi under Mirkabad D/c under Mungaoli Division
Estimate for proposed 11 kv Uradmau Ag. (S/s Udaipura To Uradmau Ag.) Feeder 4KM 11KV Line Conductor Augumentation Under Udaipura DC ONM Dn. Bareli
Interconnection of 11 KV Line with covered conductor for Simhasth-2028 at various locations of Nai Sadak Zone of City West Division for Simhasth-2028
Est. for Augumentation of 11 KV Conductor under General SSTD Scheme at Pohari to Sarwani under Pohari-II D/c under OnM Dn. I Shivpuri.
Supply of Pad Clamp for Isolator Suitable for panther/Dog conductor for use in various offices under Jurisdiction of General Manager OM Circle, MPMKVVCL,Gwalior
Estt for Conductor augmentation of AAAC Rabbit to AAAC Raccoon of 11 KV Sojna Pump feeder under Mirjapur DC In O and M Div. Vidisha
Estimate for 11 KV Line Conductor Aug. At Malawani feeder Various location malawani S/S to semritanki tapping under Piprai D/c under Mungaoli Division
Tender Notification of Restringing of theft conductor at different location of 11 KV DLF feeder at Village Ratanbarri from 33 to 11 KV Substation Ratanbarri
STIMATE FOR CONDUCTOR AUGMENTATION OF 11KV DHABLA PUMP FEEDER AT LOCATION DHABLA PETROL PUMP TO PANWADI TAPPING UNDER BODA DC. O N M DN. NARSINGHGARH.
Construction of Semi Conductor Technology and Packaging Centre 2nd and 3rd Floor for National Institute of Technical Teachers Training and Research NITTTR at Bhopal MP
Work for 33 KV Line Bare to Covered Conductor at Various Location under Maxi Road Zone City East Division Ujjain in SSTD Simhastha 2026 Scheme
Estimate for providing mid span pole and replacement of damage conductor of 33 KV Civil Airport feeder under DD Nagar zone City Dn. East Gwl
Inviting proposals for Transportation of Cable Conductor CTPT VCB H Beam RS Joist and other material at different location under EZ Area of MPPKVVCL Jabalpur
Blow Pipe For Welding And Cutting-IS 7653, Electrode Holder - as per IS 2641, PVC Copper cable single and multi core Circular Sheathed cable with flexible Conductor as per IS:694, Acetylene Pressure Regulator - as per IS 6901, oxygen gas regulators, Rubber Welding Hoses-IS 447
Custom Bid for Services - Operational maintenance works of all electrical equipment and installation in all 03 shifts including general shift with shifting of power cable of pumps etc for a period of 01 year at Amlai OCM of Sohagpur Area SECL Similar Category Manpower Outsourcing Services - Man-days based
HOIST, ELECTRIC, WIRE ROPE, 5T, 35M, W-TROLLY, DISMANTLE, ERECTION and COMMISSIONING, ELEC, HOIST, ELECTRIC, CHAIN, 12T, 5M, W-HOOK SPNSN, ERECTION and COMMISSIONING, COUNTER WEIGHT, HOIST, ELECTRIC, CHAIN, 10T, 6M, W-HOOK SPNSN, HOIST, ELECTRIC, ... ELECTRIC, WIRE ROPE, ...
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6322040 Dated : 08-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6325675 Dated : 11-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6326887 Dated : 11-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6322024 Dated : 08-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6325111 Dated : 11-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6282636 Dated : 10-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Estimate for Electrification of Street light of Installation single core LT cable at location shadora under Shadora