Loading…
Loading…
1,455 results • Best match
Providing and fixing of End Termination Kits for HT power cables installed for feeding power to various equipments like Lighting Transformers, Load Break Switches, Pump Starters installed at multiple locations in Lingaraj OCP, Lingaraj area
2 Ton electric wire rope Hoist with creep speed for crane at Test House Cell-1, Single girder 2TON EOT crane (OH FINAL BUILD) with necessary dismantling of existing EOT Crane, Single girder EOT cranes (5TON CRANES FOR AL55i HANGER), single girder 3 Ton EOT Crane (OH RD 33 FINAL BUILDING) with necessary dismantling of existing crane, Single Girder 3 Ton EOT Crane (OH STRIPIING BAY) with necessary dismantling of existing Crane, Double girder 3 Ton EOT crane (OH MACHINE SHOP) with necessary dismantling of existing crane
Shifting and construction of 3ph 6w LT line with LT XLPE AB Cable-1.971 CKM from Galua Chaka Bus Stop to Sai Mobile Point under Banpur to AyatpurRoad(0/0km to 9/300km), Khordha under state plan.
PVC Insulated Unsheathed Cable with Flexible Conductor as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6439132 Dated : 18-07-2025 Bid Document 1/8 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority RITES Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Providing and fixing of outdoor type end termination of 3.3 KV HT Copper power cable installed in various points of mines of SOCP, IB Valley Area
ICTP 415V 100A, MAIN SWITCH DP 32A, TUBELIGHT ROD 240V 40W, TUBELIGHT CHOKE 240V 40W, TUBELIGHT STARTER 240V 40W, 5 6 A SWITCH, 5 6 A SOCKET 3PIN, 15 16 A SWITCH, 15 16 SOCKET 6PIN, 32A CUTOUT FUSE, BULB HOLDER BATTEN AND B22 TYPE AS PER RELEVANT IS ... mm PVC INSULATED SINGLE ... CORE COPPER WIRE 1 ... mm PVC INSULATED SINGLE ... CORE COPPER WIRE 1 ... mm PVC INSULATED SINGLE ... CORE COPPER WIRE 1 ...
2.5 sqmm copper cable, 1.5 Sqmm copper wire, 6 modular PVC Box, 3 modular PVC Box, 6 modular Cover plate, 3 modular Cover plate, 16A modular socket, 16A modular switch, 6A modular socket, 6A modular switch, 16A plug top
Electrical connection Lugs or thimbles (Q3), PVC Copper Cable, Single Core, Unsheathed cables with Flexible conductor as per IS:694 (Q3), Electrical Plug (Q3)
3000011424 1 82001114090 4 core x 35 sq. mm AYWY: Aluminium conductor, 3000011424 2 82001103010 3.5 core x 120 sq. mm AYWY: Aluminium conductor
120 sq. mm 11 kV grade XLPE insulated Copper conductor cable (Q3), 70 sq. mm 11 kV grade XLPE insulated Copper conductor cable (Q3)
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), PVC Insulated Copper Cable Single and Multi - Core Circular Sheathed Cable with Flexible Conductor (V2) as per IS 694 (Q2) MSE Exemption for Years Of Experience ... category XLPE Cable for ...
6.6KV UE 3CX185 INDOOR TERMINATING KIT_1, 6.6KV UE 3CX185 INDOOR TERMINATING KIT_2, 11KV UE 3CX185 INDOOR TERMINATING KIT, 11KV UE 1CX500 INDOOR TERMINATING KIT, 11KV UE 3CX185 STRAIGHT THROUGH JOINT
Design, engineering and Supply of LT Power Cables and Emergency MLDB alongwith accessories etc. required for Coal Handling Plant and Rapid Loading System with Surge Bin near Kaniha Wharfwall Siding (10 MTY) of MCL KANIHA ODISHA
Supply, Installation, Testing and Commissioning of 1 no.100KVA, 11/0.4KV Plinth mounted S/S, 11KV 4pole structure ,11KV line DP with 3Cx35 sqmm 11KV XLPE cable for Power Supply to Boys Hostel at Govt. Polytechnic, Bolangir.
Day to day handling, shifting and laying of power cable in various parts of mine at Lajkura OCP, IB Valley Area for a period of 02 years
Custom Bid for Services - Day to day cable handling or shifting of power cable Similar Category Manpower Outsourcing Services - Man-days based Manpower Outsourcing Services - Minimum wage
Design, Supply, Installation,Testing,Commissioning of equipments for 2X1000 KVA 330.440 KV Distribution Transformer Substation, associated 33 KV,LT Cable laying works etc in Railway Siding of NTPC at Darlipali in Odisha
Laying and handling of both HT/LT Power Cables (on surface or in trenches in pipes along with transportation ) during shifting of field switches/ starters of HEMMS, associated transformers , towers, motors and other electrical installations as well
Supply, installation, testing and commissioning of 11 0.4KV, 250KVA plinth mounted substation, 11KV DP on 11 mtr joist pole, 11KV line DP along with Construction of 3 phase 4 wire AB cable for Power Supply to GCPE, Kulundi, Sambalpur
Digital Megger, Series Lamp, Multimeter, DC Shunt Motor, M.G. Set., 3-Point starter, Regulator, Panel for MG Set, DC Voltmeter, DC Ammeter, Digital Tachometer, Resistive Load Box, Pony Brake Arrangements, Panel for DC Shunt Motor, Variable Rheostats, ... core copper cable , ... core copper cable , ... core copper wire , ... lugs, Copper wire , ...
Handling of PVC/XLPE power cable of different sizes like 3.3KV/6.6KV/11KV along with lighting cable during switch shifting of shovels, starter and motors of pumps, shovel marching, Transformer shifting in mine as and when required.
Dismantling and replacement of 06 Nos MS gates with SS gates and repair or maintenance work at MLC Jetty and Replacement of certain XLPE cable and Provision of auto syn panel for 03 DG sets at MLC, Dhamara
PVC Insulated Unsheathed Cable with Flexible Conductor as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6386181 Dated : 06-07-2025 Bid Document 1/8 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 63079 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 24 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/8 PFA/SER/GRC South Eastern Railway, Indian Railways, South Eastern Railway, Ministry of Railways (Pfa/ser/grc) Splitting
Laying of LT power cable from substation-1 to DRT pilot plant, supply and installation of 400kvar capacitor bank and other allied works at CSIR-IMMT, Bhubaneswar-751013
Dismantling, shifting, laying and cable jointing of PVC power cable, single core 1.1 KV, 630 Sq. mm., Aluminium, Armoured at Silo top of New Silo, Bharatpur OCP, MCL.
Provision of lighting at T1,T2 terminal Car Parking Area,internal electrical works at T1 terminal public toilets at B.P.I Airport,Bhubaneswar.SH-ITC of Street Light Poles,Electrical Panels,laying of electrical power cables and associated Elect. works
Loading, Transportation, Unloading / Placement of 02Nos. of 76LPS X 150mHead Pump set consisting of Pump,Motor,Starter and its accessories,etc. transportation of Two Nos. of Transwitch Units,Power Cables,MSPipes from surface to UG of Nandira COlliery
Aluminium Conductors for Overhead Transmission Purposes (Powergrid) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years of Experience and Turnover No
Doubling of 33KV conductor for 40MVA transformer of jorabaga substation, Lakhanur Area
Come along clamp for Earth wire 19/2.5 mm (galvanized) steel conductor
PVC Insulated Unsheathed Cable with Flexible Conductor as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6443688 Dated : 21-07-2025 Bid Document 1/9 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 60842 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 18 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/9 PFA/SER/GRC South Eastern Railway, Indian Railways, South Eastern Railway, Ministry of Railways (Pfa/ser/grc) Splitting
10 Sqmm copper wire, 6 Sqmm copper wire, 4 Sqmm copper wire, 1.5 Sqmm copper wire, 2.5 sqmm copper cable, 70Sqmm aluminium cable, 125A TP MCCB, 8 way SPN DB, 40A TPN MCB, 32A TPN MCB, 40A DP MCB, 32A DP MCB, 40A SP MCB, TPN Enclouser, DP Enclouser, 63A 3 phase changeover, 32A 1 phase changeover, 6 modular PVC Box, 2 modular PVC Box, 6 modular Cover plate, 2 modular Cover plate, 16A modular switch, 16A modular socket, 6A modular switch, 6A modular socket, 16A DP starter, 16A plug top, PVC trunking, 25mm PVC pipe, 25mm flexible, 16mm flexible, 25mm c clamp, half inch casing caping
10.0 sqmm copper wire, 6.0 Sqmm copper wire, 4.0 sqmm copper wire, 8 way VTPN DB, 63A TPN MCB, 20A TPN MCB, 63A TP MCB, 20A TP MCB, 20A industrial socket, 32mm PVC pipe, 32mm PVC bend, One inch casing caping