Loading…
Loading…
7,067 results • Best match
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6391286 Dated : 11-08-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 628750 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6991954 Dated : 20-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6814585 Dated : 23-10-2025 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 1508040 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6881680 Dated : 15-11-2025 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7053794 Dated : 02-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6926600 Dated : 24-11-2025 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7053576 Dated : 02-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6738007 Dated : 28-09-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 10 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Construction of 200 Capacity auditorium at Central staff training and research institute(CSTARI) campus, EN 81,Saltlake Kolkata 700091 including interior acoustic Treatment, external GRC elements & art, providing Internal electrical installation ... lightening conductors , ...
Erection of 51 nos 8 mtr long pcc pole and drawal LT AB cable double feeder and UG cable PVC 15 sgm 3.5 C for pump house of floating boat at WTP under Dhuliyan Municipality
Procurement of 6 , 4 Sqmm 3C Flat water proof submersible Flat cable and 16, 10, 6, 4 Sqmm PVC Copper Wire under the Store of Chanchal(A-I) Sub Division under Malda(A-I)Division.
supply and installation of RCC precast post as per specifications, supply and installation of LED Post Top Lantern 30W and XLPE LT Cable 10 Sqmm x 2 Core
REPLACEMENT OF BREAKDOWN TRANSFORMER AT BALLYGUNGE SCIENCE COLLEGE INCLUDING REPLACEMENT OF HT and LT CABLE,CT and PT OF VCB, LT ACB,OCB ELECTRONIC TRIP UNIT, EARTHING ETC.
Restoration of Emergency Break down of 11/0.415 KV Indoor Sub-Station along with allied E.I. Work at Udaynarayanpur State General Hospital, Howrah --- Replacement of damaged LT Cable
Replacement of faulty outgoing LT Cable along-with Filtration and De-hydration of 750 KVA,6/0.433 KV Transformer with allied works at Serampore MPS under Serampore Municipality.
Supply And Installation Of RCC Precast Post As Per Specifications, Supply And Installation Of LED Post Top Lantern 30W And XLPE LT Cable 10 Sqmm X 2 Core
Construction, Installation and Commissioning of Air Pollution Control System along with Chimney and Power Cable for Wood Base Crematoria at Kashimitra Burning Ghat.
Replacement of lighting luminaires and power cable and other allied works at Burning Ghat Pumping Station under RCFA Part - I Water Supply Scheme .
Restoration of Main Power Cable Fault from LT Panel To New Hostel Building and allied Electrical Works at Institute of Fire Service, WBFES..
INSTALLATION OF POWER CABLE FOR VRF AC SYSTEM WITH ALLIED WORKS INCLUDING DISMANTLING OF OLD DUCTING SYSTEM AT BUILDING DEPTT OF CMO, KMC.
Laying of Extra power cable from PDB to Panel incomer at Tirat Low Lift colliery Pump House under Tirat Colliery Water Supply Scheme.
Construction of Control and Power Cable Trench, Switchyard Development and other ancillary Civil Works at Chingra 33 / 11 Kv. Sub Station, Dist. Jhargram.
Manufacture, testing, supply and delivery of 1.1 KV Grade and 11 KV Grade Armoured XLPE Insulated PVC Sheathed Power Cable of different sizes.
Construction of 10 pole yard,path way to 10 pole and power cable trench approx 40.00m at parui 33 11 Kv Sub Station.
INSTALLATION OF POWER EQUIPMENT WITH CONSTRUCTION OF SUPPORT STRUCTURES AND LAYING OF CONTROL AND POWER CABLES AT SWITCH YARDS AND CONTROL ROOMS ALONG WITH DIFFERENT ALLIED ELECTRICAL WORKS AT MANIKCHAK AND HARISCHANDRAPUR SUBSTATIONS
1. Repairing and Maintenance of 415V Overhead power line changing of damage steel pole, re-strengthening of conductor, fitting, fixing of insulator, bracket, cradle guard considering safety point of view at Sodepur (R) 3A pit Colliery residence colon
Manufacture Testing Supply and Delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220KV Main Bus from twin ACSR Zebra to Twin ACSR Moose conductor and allied works at Kasba 220KV SS
REPAIR AND REPLACEMENT OF UNSERVICEABLE PARTS OF DG SET, CORRODED PANEL, REPAIR OF EARTHING STRIPS, UNSERVICEABLE SIGN BOARD, LIGHTING CONDUCTOR, PCC WORKS, STP AND REWINDING OF MOTORS INCLUDING ALLIED WORKS AT BAGRAKOTE MIL STN UNDER GE SEVOKE ROAD
Earth Discharge rod assembly for 25KV AC Traction to be supplied along with two rail clamps, Top Clamp (10MM to 20MM Dia Conductor) and Cable 9 meters long with Canvas bag as per RDSO Spec. No. ETI/OH
150Sq.mm thin walled flex elast cable(blue) with copper conductor, 750V to 1.8/300KV, as per drawing ELRS/Spec/ELC/0019, Rev-4 as per RDSO letter no. EL/2.2.37 dt.23/03/2009 or latest. Packing should
Supply of 4 core x 400 Sq.mm XLPE insulated pvc sheathed armoured , Aluminium conductor cable,ISI marked and as per IS 7098 pt-01, 1988 with Amd no. 1,2,3 or latest drum as per IS 10418 latest avail
25 KV OHE Discharge Rod for conventional type OHE as per RDSO Specification No. ETI/OHE/51 [9/87] Rev -1 [Mar2019] or latest suitable for round/stranded conductor of 10 MM to 20 MM dia. Firm's make:
EARTH DISCHARGE ROD ASSEMBLY FOR 25KV AC TRACTION TO BE SUPPLIED ALONG WITH TWO RAIL CLAMPS, TOP CLAMP (10MM TO 20MM DIA CONDUCTOR) AND CABLE 9 METERS LONG WITH CANVAS BAG AS PER RDSO SPECN. NO: ETI/O
25 KV Earthing/Discharge Rod with top clamps suitable for 50/90 mm dia conductor/ busbar, working voltage 25KV AC Traction to RDSO specification No. ETI/OHE/51 (9/87) with latest A and C Slip No.- 1(
Set of 05 nos. of assembled WAGO type terminal block of size 2.5 sq.mm cable each consisting of (i) 25 numbers of front entry 4- conductor terminal (WAGO type no.280-833 or similar),(ii) 01 number of
TEE CONNECTOR TO SUIT 50- O/D ALUMINIUM TUBE & "SPIDER" AAC CONDUCTOR FOR (25 KV SUSTEM) RI NO. 11141, 11142, 11143 AND RDSO SPEC. NO. ETI/PSI/P/11140 REV.-B or latest. Firm's offer : Material FOR des
AUTOMATIC TYPE COME ALONG CLAMP FOR CATENARY SUITABLE FOR 19/2,10.8MM CONDUCTOR ,AS PER DRG NO.M/TRD/SK 311 CONFORMING TO IS 226/70 (BODY) AND IS 3885/GR-C55(JAW) Firms Offer:Same as above. AS PER RAI
Supply of 4 core x 400 Sq.mm XLPE insulated pvc sheathed armoured , Aluminium conductor cable,ISI marked and as per IS 7098 pt-01, 1988 with Amd no. 1,2,3 or latest Drum as per IS 10418. (Accepted de
Earth discharge rod assembly for 25KV AC Traction to be supplied along with two rail clamps, Top clamp (10mm to 20mm dia conductor) and cable 9 meter (7.5 +1.5)m long with size:248/0.45mm and canvas b
Earth discharge rod assembly for 25KV AC Traction to be supplied along with two rail clamps, Top clamp (10mm to 20mm dia conductor) and cable 9 meter (7.5 +1.5)m long with size:248/0.45mm and canvas b
Top Clamp for 25 KV OHE Discharge Rod as per RDSO specification No ETI/OHE/51 ( 9/87) REV.1 (Mar%u20192019) or latest made of copper or aluminium bronze suitable for round/stranded conductor of 10 MM
Set of 05 nos. of assembled WAGO type terminal block of size 2.5 sq.mm cable each consisting of (i) 25 numbers of front entry 4- conductor terminal (WAGO type no.280-833 or similar),(ii) 01 number of
2-CONDUCTOR TERMINAL BLOCK 35 mm SQUARE WITH OPERATING LEVERS 125A,1000V WITH INTEGRATED END PLATE,SIDE AND CENTER MARKING FOR DIN 35 X 15 RAIL AS PER WAGO CAT NO. 285-635.MAKE/BRAND-WAGO OR SIMILAR.
Old Street Lighting repairing work of 8 mtr Street Light Poles connection damage Al armoured cable changes and 120, 150-watt LED light replace including all allied works at Bajapratappur Fly Over Bridge area of ward no 04 under Burdwan Municipality.
Supply and transportation of 50 sq mm 3.5 core aluminium armoured cable, rubber hand gloves and fuse wire for maintenance of diff. Major RLI Scheme under Gazole (A-M) Sub-Division within Malda-I (A-M) Division under Non-Plan maintenance.
SUPPLY AND INSTALLATION HOT DIP GALVANISED OCTAGONAL POLE (7mtr. LONG) INCLUDING S/F 75W LED LIGHT FITTINGS, ARMOURED CABLE, PILLAR BOX AND OTHER ACCESSORIES FOR LIGHTING FACILITY FROM U.C. Sinha Street Shiv Mandir to Tushar Chand House of Ward no.7
SUPPLY AND INSTALLATION HOT DIP GALVANISED OCTAGONAL POLE (7mtr. LONG) INCLUDING S/F 70W LED LIGHT FITTINGS, ARMOURED CABLE, PILLAR BOX AND OTHER ACCESSORIES FOR LIGHTING FACILITY FROM Anandomoyee School to Netaji Subhash Road More of Ward no.- 06,PM
PPGI Sheet, Electric Cable, Glass, False Ceiling, LED Lamp, Hylum Sheet, Light, PVC Seat, Rubber Shoe, XLPE Cable, Spring assembly, Link assembly, Fuse, GOD Connection, Operation handle, Steel Nut, HRC fuse link, Power supply
Drawl of 300 sq mm 3 core XLPE cable through Micro Tunnelling from Genexx 33by11 KV Sub-Station for new service connection to the housing project of Rajat Gateway LLP at Joka DH Road
Laying of 15.9 km 400 SQ MM 33 KV XLPE cable for 2 nos 33 KV line from Baruipur GSS to Siddha Suburbia 33 kv stn under Baruipur Division of South 24 Parganas Region