Loading…
Loading…
7,068 results • Best match
Laying of 15.9 km 400 SQ MM 33 KV XLPE cable for 2 nos 33 KV line from Baruipur GSS to Siddha Suburbia 33 kv stn under Baruipur Division of South 24 Parganas Region
REPAIRING OF STARTER PANEL EARTHING, 400 A XLPE CABLE REPAIRING AND RENOVATION OF ELECTRICAL WIRING WITH FITTING FIXING OF MOTOR FLOOR AREA, DRY PIT FLOOR AREA AND OTHER ALLIED WORKS AT JDPS UNDERBDPS (S_D)
Supply of street lights, underground XLPE cable and connected items for restoration of unserviceable street light at Action Area IC, ID, Cattle pound, Dog Creche, Picnic Spot and Immersion Ghat at NKDA, Newtown, Kolkata.
Metering KIOSK, XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098, Laying of cableDirect in ground, Laying of cableOn surface, Laying of cable Hanging in air, Cable termination
Micro tunneling with 160 mm HDPE pipe (PE-80, PN-6) and laying of 11 KV, 3C, 300 Sq. mm XLPE cable for NH-6 Crossing from Banitabla to Mahishrekha Bridge under Uluberia Division
Construction and laying of 33 KV,3 Core,400 sqmm XLPE Cable from NJP 220/132/33/11 KV S/S to proposed Fulbari 33/11 KV S/S at Chhobavita under Jalpaiguri Division
Supply, delivery and erection of 33 kV Straight Through and 33 kV Outdoor Jointing Kit suitable for 33 kV,3C, 400 sq mm XLPE cable for 33 kV Food Park evacuation under Uluberia Division
Supply installation commissioning transportation of Raychem HST jointing kit and Outdoor indoor term kit for 33 KV 3C 400 sqmm XLPE new 33 kv line 9.5 km from BRP GSS to Southwind 33/ 11 kv SS under Garia Div
STOP LIGHT SWITCH, FIELD COIL ASSY 24V, SOLENOID SWITCH 12V, SOLENOID SWITCH 24V, WIPER MOTOR ASSY 24V, DRIVE ASSY, SPEEDO METER CABLE, ARENS CONTROL CABLE STOP CABLE
FRONT AXLE OIL SEAL, SHAFT SEAL, LEAF NO 6, ARENS CONTROL CABLE, BUSH HOLDER, S A POWER STEERING, ELEMENT AIR CLEANER, SWITCH ASSY IGNITION, WATER PUMP ASSY
SPRG BRK CHAMBER ACTUATOR, HAND BRAKE VALVE, LEVER GEAR SHIFTING CONTROL, PUMP ASSY FUEL, OIL SEAL, TENSIONER BELT, PART KIT DRUG LINK TIE ROD, ARENS CONTROL CABLE
Construction of 01 nos of Power Transformer, CT, VCB, Cable end box support and Control cable trench at Paharpur 33/11 kV sub-station under Jalpaiguri Division
Switchyard development work including construction of power and control cable trench and outgoing cable trench partly at Gangajalghati 33/11 KV S/St under Bankura D Division
Manufacture, testing, supply and delivery of Composite Hardware Fittings for ACSR Weasel/Rabbit Conductor and Composite Hardware Fittings for ACSR Dog Conductor.
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6623923 Dated : 15-10-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 1120000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Lightning Conductor Installation at Howrah District Correctional Home
Erection of 4 nos 11 KV Outgoing Feeder Rl of 16.000 KM by 50Sq mm ACSR and 0.350 mtr AB Cable emanating from Mangalkote 33 11 KV Sub stn under Burdwan Region in the Burdwan District
Implementation of High Voltage Distribution System (HVDS) by installation of new DTr and using AB cable in sem- urban and rural areas including riverine areas of Kakdwip and Diamond Harbour Divisions under 24 Pgs. (S) Region
Construction of Cable Trench for laying of 33 KV, 1C X 630 mm X 6 nos. XLPE Power Cables for Metro Railway Bays at Howrah 220 KV S/Stn under Howrah Area Office, W.B.S.E.T.C.L
INSTALLATION OF POWER EQUIPMENTS WITH CONSTRUCTION OF SUPPORT STRUCTURES AND LAYING OF CONTROL AND POWER CABLES ALONG WITH DIFFERENT ALIGED ELECTRICAL WORKS AT SWITCHYARD AND CONTROL ROOM OF NARAYANPUR SUBSTATION UNDER SOUTH MALDA DIVISION
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days Bid Number : GEM/2025/B/6318647 Dated : 06-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days Bid Number : GEM/2025/B/6318915 Dated : 06-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days Bid Number : GEM/2025/B/6316875 Dated : 06-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Electrical Installation work related to construction of permanent Electrical cable Duct for laying of HT and LT cable in the campus of RG Kar Medical College and Hospital, Kolkata
RENEWING OF 95 SQMM 4 CORE LT CABLE FROM TRANSFORMER ROOM NEAR STATION 1 TO STATION 3 AND INSTALLATION OF BUSBAR CHAMBER, MAIN SWITCHES INCLUDING ELECTRICAL CONNECTIONS AT TPS
Supply and Changing of 2 nos damage LT cable due to construction work of Medical College from Pillar Box to Morgue area of North 24 Parganas District Hospital Barasat
Repair and Renovation of LED Glow Sign Board at Durgapur Circuit House and S and L of LT cable and supply of Electric Kettle at Durgapur Inspection Bungalow, PWD.
Upgradation of LT Cable from DG to Substation near Gyne ward for providing backup power for Gynae OT Section and PICU under Bankura Mechanical Division, P.H.E. Dte. Dist- Bankura
Electrician tool kit (Q3), SWITCH 6A 1WAY, SWITCH 10A 1WAY, PLUG 3PIN 16AMP ISI MARK, LED BULB ADORE PLUS 9W.10W, BATTEN BULB HOLDER, LED PANEL ROUND OCTANE 6W LED, LED PANEL ROUND OCTANE 9W LED, LED BULB ADORE PLUS 5W, LT XLPE Power Cables 300.SQMM ... Aluminium Conductor Outer ... XLPE Power Cables 70.SQMM ... Aluminium Conductor Outer ...
LIFTING OF BUSTEE DWELLER SERVICE CABLE AT 3-10 CANAL SOUT ROAD AND SURROUNDINGS IN WARD NO. - 57.
Relaying of power cable with allied work at OHR, switch room-II and IV of Bhulanpur w/s scheme under Bankura Mechanical Division, P.H.E.Dte.
DVD RW EXTERNAL, POWER CABLE LONG, UTP CABLE 100 MTRS, RJ 45 CONNECTOR, TPLINK SIM ROUTER WITH 5G, TPLINK WIRELESS EXTENDER BOQ Title TITLE1
Printer Fuser Assy, UPS 1KVA, Mother Board i3, Printer Head, Printer Circuit Board, VGA Cable, CPU Fan, Recycle Card, Power Supply unit, Power Cable
NK Water Level Indicator, NK Temp Gauge, NK Safety Valve, Nk000189 ECG Cable, NK000188 Power Cable, NK BP Cuff BOQ Title BOQ MED Water
Relaying of power cable and with allied work at switch room-I of Ratanpur Zone-B water supply scheme under Bankura Mechanical Division, P.H.E.Dte.
Laying of power cable from kiosk to quarter complex at kalyaneswari WTP and some other allied works under RCFA Part-I water supply scheme.
Replacement of power cable of Anti Sludge Blower motors and repairing of High Mast with allied works at WTP, AA-I under NTK Project.
60HP 12 STAGE Submersible Pump set, 30 HP 4x4 Monoset Pump, 25 mm 3 core Copper Armored Power Cable ISI BOQ Title BOQ BOQ
SUPPLY AND ERECTION OF GI STRUCTURES FOR EQUIPMENTS / 33KV BUS / EARTHING / CONTROL AND POWER CABLE AT CHAMPADANGA 33/11KV SUB STATION UNDER ARAMBAGH DIVISION
Replacement of heavy duty power cable including other accessories of submersible pump unit no. 1 (175 KW/1950 LPS) at Kasba drainage pumping station.
Supply of Different types of Single Core Flexible Copper Conductor for maintenance of different Govt Owned and Operated RLI Schemes under Burdwan (A-M) Sub-Division under Burdwan (A-M) Division under Non Plan Programme District of Purba Bardhaman.
PERIODICAL SERVICES INCLUDING MISC MAINT WORKS TO CERTAIN BUILDINGS, REPAIRS TO LEEKAGE/SEEPAGE IN ROOF, CHAJJA, BALCONIES AND REPAIR/REPLACEMENT OF STREET LIGHT, OH CONDUCTOR, DBs AT MES, DOMESTIC AND BASARA AREA INCLUDING MES AREA UNDER GE (AF) HAS
Laying of 33KV UG cable single line from Rishi Bankim 33/11 KV Substation and Basudevpur 33 kV Line T Off point at Malancha Roadcrossing to PHE Malancha along with 4P erection and Dog conductor stringing under Naihati Division
Construction of a G plus 5 storied Academic Building for the integrated Open Campus-cum-Regional Centre of NSOU at New town, Kolkata---EI for FCU unit, Repairing of Lightening Arrester, down conductor, Dismantling of Light and Ceiling fan
THIN WALLED E-BEAM IRRADIATION FLEXIBLE CABLE WITH COPPER CONDUCTOR WORKING VOLTAGE ABOVE 750 VOLTS AND UPTO 1.8/3.0 KV, GRADE SIZE 4 SQ. MM AS PER RDSO SPECN. No. ELRS/SPEC/ELC/0019 REV-4 OF FEB.2018
Rigid through connector to suit 50 dia aluminum tubular bus bar and SPIDER AAC conductor for 25 kV PT type II. (Part No.11111, 11112 & 11113) RDSO Spec: TI/SPC/OHE/Fittings/0130-10/13-Rev-1 or latest,
Earth discharge rod assembly for 25 KV AC Traction to be supplied along with two rail clamp (10mm to 20 mm dia conductor) and cable 9 meter long with canvas bag as per RDSO Specification no:-ETI/OHE/5
Semi conductor HRC Fuse 1000A, 1000 V AC SPEC: Bussmann type- 170L9609 or 170M8610 or similar. The dimension of the fuse must be 76mm x 92 mm x 75 mm and should not be varied . ( Note: 1) Fitting att
Strain Clamp suitable for ACSR Zebra Conductor (with Minimum Ultimate Tensile Strength of 7000 kg and Slip strength of 4000 kg) Spec: TI-SPC-OHE-Fittings-0130 with A-C Slip No.1, ETI-OHE-13 (4-84) may
THIN-WALLED E-BEAM IRRADIATION FLEXIBLE CABLE WITH COPPER CONDUCTOR WORKING VOLTAGE ABOVE 750 VOLTS AND UPTO 1.8/3.0 KV, GRADE SIZE 10 SQ. MM AS PER RDSO SPECN. No. ELRS/SPEC/ELC/0019 REV-2 OF FEB. 20