Loading…
Loading…
4,136 results • Best match
Civil Work
Construction of C C Road and RCC Drain with slab from Srikanta Mohalik House to Sashikanta Mohalik House at Rampalli in W. no-15
Constn of C C Road with Drain from SK Lalu house to Arshad Ali house via sahirul Haq House in Word no-3, Balasore
Construction of RCC Drain with Slab and C C Road from Munna Mishra House to Bira Behera House At Bada Bazar in W.no. 07
Constn. of C C Road and RCC Culvert at Gopalgaan Bye-Lane from DR. KK Das res to Abhimnyue Das in Word No-28
S/R to Salajharia to Sikharpur via Ranipada road for the year 2023-24 (such as construction of Retaining wall and Relaying of CC Pavement)
Improvement to Paradeepgarh Rangiagarh via Nimidhi Road ( such as providing widening with CC pavement ) from 3.100 k.m. to 3.578 k.m. for the year 2020-21
P/R to Baripada Gobindpur Road (Such as Streangthening with CC Pavement) from 0/944 km to 1/1140 km. for the year 21-22.
S/R to Badabhuin to Kalikaprasad road for 2023-24 (such as Gr-III metalling with BT and relaying of CC pavement and Paver Block)
GCI covershed, payeyard, Office-cum-FRS,Toilet Block with water supply arrangement, C.C. road
Construction of internal cement concrete road in R and R Colony at Solpali and Garmunda village under Sambalpur Municipal Corporation in Sambalpur District for Additional Spillway Project of Hirakud Dam.
Construction of RCC Road to Aluminium Park inside Smelter Plant.
Construction of RCC Road at Industrial Estate, Berhampur, Ganjam, Odisha.
R/R of C C Road and drain from Late Kalinga Mohapatra house to Sudhir Nayak house at P Panda Lane in Ward No-28
Constn. of C C Road and drain and culvert from B.N Dev Street Rajabati chhak to Nepal Bardhan(Nurshery Club) house in Word No-25
Construction of CC road from Mini Park to Sanischar Temple
CC Road
S/R to Road No.IR-32 from Ch 0/00 km to Ch 0/850 km (Such as CC pavement work) for the year 2024-25
S/R to Baunsiapada to Patachandiprasad road for the year 2023-24 (such as construction of CC Drain and Relaying of CC Pavement) Splitted Work Details
INTERNAL CC ROAD
ROAD AND DRAIN WORKS
Restoration work
Road and Drain
Construction of C.C. road from Plot No. 2D/780/41 to 2C/780/01, 2D/780/49 to 2C/780/04, 2D/780/02 to 2C/780/45, 2D/780/31 to 2D/780/32, 2D/221/27 to 2D/221/04 of Sec-11 CDA in Ward No.3.
Repair to J-B-C Road Such as Construction of C.C Approach Road at 26.000 Km (BHS), Damage C.C. Road from 23.600 Km to 23.625 Km (LHS), pot hole repair with BUSG, PMC and SC from 22.100 Km to 24.000 Km ,26.500 km to 27.000 km and 28.000km to 28.500 km
SR to Baramba Town road such as construction of cement concrete pavement from 2.208 km to 2.340 km and 2.093 km to 2.113 km, RCC drain from 2.208 km to 2.422 km and 2.097 km to 2.100 km, escape drain at 2.417 km and RCC box culvert 92.00 M x 1.50 M
CONSTRUCTION OF CEMENT CONCRETE ROAD AND SIDE DRAIN WITH COVER SLAB FROM BHAGIRATHI KHARSEL HOUSE TO SUDARSHAN BEHERA HOUSE AT FATEHNAGARPADA (LANE-4 R/S BALANCE PORTION) IN WARD NO 05
Provision of cement concrete road from Durga Mandap to 1st Electric substation at rehabilitation and resettlement site located at Nimpur for the person affected due to redevelopment of SCB MCH, Cuttack.
Construction of CC road from Pramod Behera house to Pitabali Temple
Construction of CC road from Adhikari house to Kunja Pradhan house
Construction of CC road from Basanta Behera house to Bidyadhar house
Construction of CC road from Tantichira main road to Tanti sahi
GCI covershed, Paveyard, FIC-cum-FRS, Toilet Block with water supply arrangement and C.C. road
Special repair to existing cement concrete road surface with fixing un polished unglazed vitrified industrial floor tile fixing side walls with kerb stone from Main entrance gate to BT road near MTC square and in front area of main entrance gate at Regional Plant Resource Center Bhubaneswar
Construction of C C road and drain from Champati house to main road back side of Jagdish Sethi ward no-02 under UNNATI for 2017-18
Constn. of C C Road and drain from Parbati Majhi house to Banthu Singh house and Ghanashyam House to Sudarshan Behera house in Word No-21
S/R to RD road to Kalatangi road such as Pothole repair and SDBC, over laying of CC pavement with paver block for the year 2025-26
S R to Paradeepgarh Rangiagarh via Nimidhi Road such as widening with CC pavement from 4 100 km to 4 260 km for the year 2024 25
Construction of CC road from Rama Samal house to Nirmal Rao house
Construction of RCC road inside plant area at NTPC TSTPS KANIHA
CC Road
CC ROAD
Special Repair to internal roads of Sailashree Vihar , Phase-II area C.S.Pur Bhubaneswar for the year 2019-20 Such as repair to damaged BT and C.C. Road from FR Block No 7 to 67 and Block No 95 to 40 and Block No 67 to 72 and Block No 1 to 14 Block