Loading…
Loading…
789 results • Best match
As per DNIT
SH- Building Portion Civil work , W.S. and S.I. and Site Development ) GROUND FLOOR. (Based on H.P.S.R. 2020).
As per DNIT
As per DNIT
15 Inch Dual Speaker Top with flight case, Flight case, SM 57 Instrumental Mics, SM 58 Instrumental Mics, Laple Collar Mic with receiver and body pack transmitter, Solo Headphone with 6.5mm converter, Stage Monitor with Flight Case, Snake Wire, XLR cables with converter, Rechargeable AA battery, charging adapter, PARTY BOX, AMPLIFIER, SPEAKER, SUBWOOFER, COARDLESS MIC
P/L Cement concerete 1 4 8 Cement concrete 1 1.5 3 form work , steel work, wood work, Plastering, distempering and painting etc
Construction of RCC cantilever retaining wall for embankment protection toe wall and apron river diversion removal of obstruction opposite bus stand towards parking area bridge at Sarwari Khad at RD 0 to 295 295 Rmt
SH_Drilling, lowering assembly and development of 1 Nos tube well 80 metre deep at Chandropa near Community hall Chandropa
P/L 25mm thick mix seal surface.
RO of fire fighting and fire alarm system at IGMC and Hospital campus block A B C D Medical College Cancer Hospital and Auditorium at IGMC Shimla for the year 2025 to 26.w.e.f 10.04.2025 to 09.04.2026
Construction of bundled SDRA foundation wall and gabion walls at back side of auditorium block and faculty housing upto bridge towards Kataula (Dhulchi) river and R.C.C. drains for channelization of surface water at North Campus of IIT Mandi
SH Formation cutting C O E wall in front of Existing Community Hall Building C O R wall for ground
As per DNIT
As per DNIT
(SH- Building Portion, Civil Work and WS and SI)
As per DNIT
As per DNIT
(SH-Building Portion Civil work, WS and SI of Ground Floor )
As per DNIT
SH-Building Portion Civil work, WS. and SI of Ground Floor
SH-Building Portion Civil work, WS. and SI of Ground Floor
As Per DNIT
As per DNIT
As per DNIT
AS per DNIT
(SH- Civil Work, WS and SI))
SH- Building Portion Civil work and W.S. and S.I.
AS per DNIT
As per DNIT
As per DNIT
As per DNIT
SH- Building Portion, Civil Work and WS and SI
SH-Building Portion Civil work, WS. and SI of Ground Floor
SH- Building Portion Civil work , W.S. and S.I. and Site Development ) GROUND FLOOR. (Based on H.P.S.R. 2020).
As per DNIT
SH- Building Portion, Civil Work and WS and SI
As per DNIT
SH - Civil work, WS and SI
As per DNIT
SH- Building Portion, Civil Work and WS and SI
SH - Civil work, WS and SI, Site Development
SH-Building Portion Civil work, WS. and SI of Ground Floor
SH- Building Portion Civil work , W.S. and S.I. and Site Development ) GROUND FLOOR. (Based on H.P.S.R. 2020).
SH- Building Portion, Civil Work and WS and SI
SH-Building Portion Civil work, WS. and SI of Ground Floor
As per DNIT
SH-Building Portion Civil work, WS. and SI of Ground Floor
As per DNIT
(SH- Civil work and W.S. and S.I. )