Loading…
Loading…
9,146 results • Best match
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
Smart class room equipments for G.U.P.S Elappully (Laptop Computer, Projector, Speaker, UPS, And Projector Scren)
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
Multifunction Machines MFM, Online UPS Rack Mountable Type, Line Intractive UPS with AVR, Computer Printers
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
PCC, RCC, RR Masonry, Brick Masonry, Plastering, Floor Tiling, Painting, Plumbing, Electrical, Furniture, computer network
ANPR Camera, Camera, Illuminator, Computer System, Monitor, Un Interrupted Power Supply, Civil Work, Electricity, Internet
Executive Table (V2) (Q3), Revolving Chair (V2) (Q3), Computer Table (Q3), Chair Office (V2) (Q3)
virtualisation cloud software Average Turn Over of Last 3 Years 20 Lakh (s) Experience with Gov. Required 3 Year (s) Virtualisation Cloud Software ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values BASIC INFORMATION ... Server Desktop , ... FOR DESKTOP & ... deliver Desktops and ... hosted desktops and ... - Desktops and ... and desktop virtualization ... advanced desktop management ... to desktops and ... and desktops false ... and desktops if ... and desktop /end ...
virtualisation cloud software Average Turn Over of Last 3 Years 300 Lakh (s) Experience with Gov. Required 3 Year (s) Virtualisation Cloud Software ( 10 ) Technical Specifications Specification Specification Name Values Allowed Values BASIC ... Cloud Desktop , ... FOR DESKTOP & ... deliver Desktops and ... hosted desktops and ... - Desktops and ... and desktop virtualization ... advanced desktop management ... to desktops and ... and desktops false ... and desktops if ... and desktop /end ...
computer servers Average Turn Over of Last 3 Years 1300 Lakh (s) Experience with Gov. Required 5 Year (s) Computer Servers ( 26 ) Technical Specifications Specification Specification Name Values Allowed Values Specification Form Factor Rack Rack Size (RU) 2 - Processor Make Intel Intel, AMD, SPARC Max. Number of sockets available on chipset 2 2, 2.0 Max. Number of sockets populated with processor 2 2, 2.0 Number of core per Processor 16 16, 18 Processor Configuration Intel Xeon Gold 6130 (2 .10GHz/16-core/22MB/1 25W) Intel Xeon Gold 6130 (2 .10GHz/16-core/22MB/1 25W) Chipset compatible with CPU Yes - Availability of Co- Processor No - If Yes Co-Processor Configuration NA Tesla V100 SXM2 32GB PCI Slots (Express Gen 6 - 1/5 3.0) Type of RAM DDR4 - RAM Size (GB) 512 512 RAM upgradable upto (GB) 3072 DIMM Slots (No.) 24 - Type of Hard Disk Drive SSD SSD Hard disk drive Capacity (GB) 800 800 Hard disk drive Speed (RPM) NA - RAID Controller Cache (MB) 2048 - RAID Type 5 - RAID Controller Ports @12 Gbps 8 - Video Controller (support VGA or above resolution) Yes - Keyboard No - Mouse No - Bays (min. 2 internal or more hot plug) 8 - USB Ports (version 2.0/3.0) 4 - Certifications Compliance support by Windows, Red Hat or Novell. or Oracle Cluster S/W Yes - DVD ROM (or better) 8x or better - Network Card Supported 1G, 10G - FC HBA Dual port card Available - FC HBA Dual port card Speed 16 - Power Management - - Redundant Power Supply Yes - Redundant Fan Yes - Total No of Ports 8No (4No 1G Ports +4No of 10G SFP+ Ports with LC-LC cables) - 2/5 Declare SPEC int rate base 2006 & specfp rate 2006 for 1, 2, 4, 8 prcessor as applicable. - - Server scalability to be achieved within the box without adding nodes Yes - RoHS Compliance Yes - BIS Registration number & its Validity - - Max. power consumption of the system (Watt) 800 - Availability of Type test reports consisting of verification of all the features & functional parameters & environmental tests sequences as under: a Dry heat test (For 16 hrs at a temperature of 45 degree C in accordance with IS: 90 00/part-3/section-5/197 7) b Cold test(For 4 hrs at a temperature of 0 degree C in accordance with IS: 9000/part-2/sec tion-4/1977 c Damp Heat Cyclic Test ( For 2 cycles of 24 hrs at a temperature of 40 degree C & 95% RH in accordance with IS: 90 00/part-5/section-1/198 1) Note:- The server shall be checked for all the parameters before conditioning, After completion of the above environmental tests sequence, with a recovery period of 1 to 2 hrs, the server shall be functional No - Name address of Lab - - Test Report No. date - - Power Supply 230 V +/-10%, 50 Hz - On Site OEM 5 5 3/5 Warranty (years) * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Rajendra Kumar 226024, NATIONAL INFORMATICS CENTRE UTTAR PRADESH 18 42 2 Jayaprakash G 695033, NIC KERALA STATE CENTRE CDAC BUILDING, VELLAYAMBALAM TRIVANDRUM, KERALA STATE PIN - 695033 8 42
C ARM Machine, Anaesthesia Workstation, Laparoscopic surgery system, Ortho Drill Machine plus Saw Machine, 300 W Cautery Machine, O.T Table Fully Automatic, O.T Instruments Trolley, ETO Machine, Horizontal Autoclave Machine, 5KW Mobile Radiography System
GENERAL-KERI -Publication building-GENARAL - Action plan 2022-23 Arranging facilities for setting up of Computer lab-CM/AP22-23/KERI/6-Providing electrical wiring in proposed computer lab near seminar hall, KERI Peechi-General Electrical Work
WOODEN PARTITIONCOMPUTER TABLE WORKSFURNISHING AND PAINTING WORKS AT DIVISION OFFICE KOLLAM
Building Maintenance
SITC of LAN system at Govt womens ITI Chalakkudy
computer servers Average Turn Over of Last 3 Years 250 Lakh (s) Experience with Gov. Required 3 Year (s) Computer Servers ( 4 ) Technical Specifications Specification Specification Name Values Allowed Values Specification Form Factor Rack Rack Size (RU) 2 - Processor Make Intel Intel, AMD, SPARC Max. Number of sockets available on chipset 2 2 Max. Number of sockets populated with processor 2 2 Number of core per Processor 16 16 Processor Configuration Intel Xeon Gold 6130 (2 .10GHz/16-core/22MB/1 25W) Intel Xeon Gold 6130 (2 .10GHz/16-core/22MB/1 25W) Chipset compatible with CPU Yes - Availability of Co- Processor No - If Yes Co-Processor Configuration NA Phi-7210, 64 core, 1.30 GHz with 32 MB L2 cache memory, 215 1/5 watt, Phi-7210F, 230 watt, Phi-7230, 215 watt, Phi-7230F, Phi-7250, 68 core, 1.40 GHz with 34 MB L2 cache memory, Phi-7250F, Phi-7290, 72 core, 1.50 GHz with 36 MB L2 cache memory, 245 watt, Phi-7290F, 260 watt, NA PCI Slots (Express Gen 3.0) 6 - Type of RAM DDR4 - RAM Size (GB) 512 512 RAM upgradable upto (GB) 3072 DIMM Slots (No.) 24 - Type of Hard Disk Drive SAS, SSD SAS, SSD Hard disk drive Capacity (GB) 10000 10000, 9800 Hard disk drive Speed (RPM) NA - RAID Controller Cache (MB) 2048 - RAID Type 5 - RAID Controller Ports @12 Gbps 8 - Video Controller (support VGA or above resolution) Yes - Keyboard No - Mouse No - Bays (min. 2 internal or more hot plug) 8 - USB Ports (version 2.0/3.0) 4 - 2/5 Certifications, Compliance support by Windows, Red Hat or Novell. Yes - DVD ROM (or better) 8x or better - Network Card Supported 1G, 10G - FC HBA Dual port card Available - FC HBA Dual port card Speed 16 - Power Management - - Redundant Power Supply Yes - Redundant Fan Yes - Total No of Ports 8No (4No 1G Ports +4No of 10G SFP+ Ports with LC-LC cables) - Declare SPEC int rate base 2006 & specfp rate 2006 for 1, 2, 4, 8 prcessor as applicable. - - Server scalability to be achieved within the box without adding nodes Yes - RoHS Compliance Yes - BIS Registration number & its Validity - - Max. power consumption of the system (Watt) 800 - Availability of Type test reports consisting of verification of all the features & functional parameters & environmental tests sequences as under: a Dry heat test (For 16 hrs at a temperature of 45 degree C in accordance with IS: 90 00/part-3/section-5/197 7) b Cold test(For 4 hrs at a temperature of 0 degree C in accordance with IS: 9000/part-2/sec tion-4/1977 c Damp No - 3/5 Heat Cyclic Test ( For 2 cycles of 24 hrs at a temperature of 40 degree C & 95% RH in accordance with IS: 90 00/part-5/section-1/198 1) Note:- The server shall be checked for all the parameters before conditioning, After completion of the above environmental tests sequence, with a recovery period of 1 to 2 hrs, the server shall be functional Name address of Lab - - Test Report No. date - - Power Supply 230 V +/-10%, 50 Hz - On Site OEM Warranty (years) 5 5 * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Rajendra Kumar 226024, NATIONAL INFORMATICS CENTRE UTTAR PRADESH 2 42 2 Jayaprakash G 695033, NIC KERALA STATE CENTRE CDAC BUILDING, VELLAYAMBALAM TRIVANDRUM, KERALA STATE PIN - 695033 2 42 EMD Required No ePBG Advisory Bank State Bank of India ePBG Percentage(%) 2.00 Duration of ePBG required (Months). 62
Construction of Electrical Substation and AC Plant Rooms,Septic tank and STP for the New Building at C-Met Athani,Thrissur,Kerala including SITC of IEI, Substation Equipment,10 KLD STP and External development works.SH: Engaging services of Technical ... cum computer /data ...
Providing services of computer data entry operator for preparation of Architectural or Structural drawings in AutoCAD to the office of the Chief Engineer and Data Entry Operator to the office of the Architect or Executive Engineer - Trivandrum, CPWD, C.G.O. Complex, Poonkulam, Trivandrum for the period from 01st August 2023 to 31st January 2024
Providing services of computer data entry operator for preparation of Architectural or structural drawings in AutoCAD to the office of the Chief Engineer and Data Entry operator to the office of the Architect or Executive Engineer - Trivandrum, CPWD, C.G.O. Complex, Poonkulam, Trivandrum for the period from 24th January 2023 to 31st July 2023.
Revolving Chair (V4) (Q2), Executive Computer Table (Q3), Executive Table (V2) (Q3), Meeting Table (V2) (Q3)
Construction of new building, Plumbing work, Electrical Work,Computer Network, Telephone Cabling, Work station and Furniture
Govt Secretariat Urgent rectification work at computer cell of CM at forth floor in north block
Construction of new building, Plumbing work, Electrical Work,Computer Network, Telephone Cabling, Work station and Furniture
Earthwork Pcc Rubble works Rcc and finishing works Plumbing Electrical works computer networkingTelephone cabling furniture etc
PCC RCC RR Masonry Laterate Masonry Plastering Tiling Painting Aluminium works Plumbing Electrical Computer Network Furniture
Dismantling of existing Wiring, Installation of new wiring in class room, computer lab and Air Conditioning.