Loading…
Loading…
6,412 results • Best match
Computer Printer (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6916631 Dated : 23-11-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 481984 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Computer Printer (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6829735 Dated : 28-10-2025 Bid Document 1/7 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
2 TB EXTERNAL HDD HARD DISK, COMPUTER USB SPEAKER, WEB CAMERA WITH MIC, Internal Storage Device (SSD/HDD), Random Access Memory (RAM) Card (V2)
Works
Computer Printers (Q2) ( PAC Only ) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Experience Criteria, Bidder Turnover, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5676800 Dated : 08-12-2024 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Estimated Bid Value 168000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes Details of the Competent Authority approval for PAC Competent Authority Approval document for PAC : View Document Name of Competent Authority District Judge Designation of Competent Authority District Judge Office/Department/Division of Competent Authority office of the District Judge CA Approval Number 8966 Competent Authority Approval Date 2024-11-29 00:00:00 Brief Description of the Approval Granted by Competent Authority The purchase committee and procurement authority has been pleased to procure the brand/model 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Correspondence Envelopes (V3) Conforming to IS 13892 (Q4), Correspondence Envelopes (V3) (Q4), Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4), knife blades (Q4), Desktop Calculator - Electronics (Q4)
Indoor Wireless Coverage Unit, Outdoor Wireless Coverage Unit, Centralized Network Controller, 55-inch LED Display, All-in-one Desktop, AAA Server Implementation, Milestone based manpower, Installation of commissioning devices
Computer Printer (V2) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/7032895 Dated : 23-12-2025 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 606780 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 12136 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 4 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : MCL Basundhara Area Regional Stores, Materials Management, Basundhara Area, MCL, Dist-Sundargarh, PIN-770076 Odisha (Mcl Basundhara Area) 2/10
Desktop Publishing Software (PDF Viewer and Writer) (Q3) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/7006479 Dated : 16-12-2025 Bid Document 1/12, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Required No ePBG Detail Required No
computer kiosk (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Bid Number ( ) : GEM/2025/B/6121320 Dated : 25-04-2025 Bid Document 1/13 Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 20000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : HINDUSTAN AERONAUTICS LIMITED HAL-Engine Division Koraput, Department of Defence Production, Hindustan Aeronautics Limited (HAL), Ministry of Defence (Engine Division Koraput) MII Purchase Preference MII Purchase Preference Yes 2/13 MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Computer Paper (V3) Conforming to IS 12766 (In Packet) (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6534272 Dated : 25-09-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Almirah Steel (V2) (Q3), Public Place Seating Chair (Q3), Steel Tables as per IS 8126 (Q3), Computer Table (Q3), Executive Table (V2) (Q3), Revolving Chair (V3) (Q2)
Modular Table (V2) (Q2), Steel Shelving Cabinets (Adjustable Type) confirming to IS 3312 (V3) (Q2), Office Chair (V3) (Q2), Revolving Chair (V4) (Q2), Computer Table (V2) (Q2)
Computer Printer (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days Bid Number ( ) : GEM/2025/B/5925586 Dated : 05-03-2025 Bid Document 1/8 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Estimated Bid Value 785400 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 15708 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 4 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : Staff Officer (MM), Talcher Area Talcher Area Mahanadi Coalfields Limited, Talcher Area OFFICE OF GENERAL MANAGER, TALCHER AREA, DERA, TALCHER ANUGUL, ODISHA, 759103 (Debasish Nayak) MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference 2/8 MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
E-Learning Content Development - Non-iGOT; Restructure & rewrite content, storyboarding with production support; Hindi, English, Odiya, Other Multiple Languages; Mobile and Laptop/Desktop Both; AI, Business Analytics, Rural Tourism, Rural Services, ..
Video Conferencing Unit with Integrated Codec -DRONA, Video Conferencing Camera Unit -Internet VC, Video Conferencing Audio Unit -Internet VC, Display Units, Workstation for Internet VC, Layer 2 Access Switch, 10G Small Form-Factor Pluggable Transceiver, Customized Mounting Setups, H Res AV Cable, HDMI Multiplexer, PDU with Integrated SPD, Services -Installation Integration and Commissioning
Modular Work Stations (V2) (Q3), Computer Table (V2) (Q2), Revolving Chair (V4) (Q2), Executive Table (V3) (Q2), Cafeteria Chair (Q2) MSE Exemption for Years of Experience and Turnover
Paper, Zista Paper, Trimax Pen, Karbon, Paper Weight, Stappler Big, Stappler Pin Big, Call Bell, Room Spray, Colin 500ML, ALL Out, Hand Wash, Whitener Pen, Pencil Battery, Register 6 nos, Register 8 nos, Scissor, Card Board, Fevistick, Plastic Mug, ... Table, All in one PC , ...
E-Learning Content Development - Non-iGOT; Restructure & rewrite content, storyboarding with production support; English, Odiya; Mobile and Laptop/Desktop Both; Hardware and Software based Skilling Courses, AI, Business Analytics, Rural Tourism, Rura..
Removing old cement plaster, 12mm thick cp, wall painting two coat, Supplying and fixing M.S. window, AL door, window sliding type, false celing, fixing of wall paneling and fixing of file cabinet and cupboard.
Construction of Paver Road over Kutcha Road
Computer Printer (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Bid Number ( ) : GEM/2025/B/6017437 Dated : 05-03-2025 Bid Document 1/12 Time allowed for Technical Clarifications during technical evaluation 7 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 18053 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 38 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : MAHANADI COALFIELDS LIMITED, HINGULA AREA Name of Bank: STATE BANK OF INDIA, Bank Branch Name: HINGULA AREA, MAHENDRAPUR Bank Account No.: 11094460922 Beneficiary Bank Branch IFSC: SBIN0012068 Beneficiary Address: MAHANADI COALFIELDS LIMITED, HINGULA AREA, BALARAM TOWNSHIP, PO- NEHRU SATABDI NAGAR, BHARATPUR, DIST-ANGUL, ODISHA, 759148 (Mahanadi Coalfields Limited, Hingula Area) MII Purchase Preference 2/12 MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Computer Printer (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6403998 Dated : 21-07-2025 Bid Document 1/9 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 864500 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 17300 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 3 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : MAHANADI COALFIELDS Office of the Chief General Manager Material Management Department Lakhanpur Area MCL, At Post Bandhabahal - 768211, District Jharsuguda Odisha. (Mahanadi Coalfields Limited, Lakhanpur Area) 2/9 Splitting
Computer Printer (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6691551 Dated : 25-09-2025 Bid Document 1/21 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1134000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI EMD Amount 22700 ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 5 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Mahanadi Coalfields Limited, Lingaraj Area OFFICE OF THE GENERAL MANAGER, MAHANADI COALFIELDS LIMITED, LINGARAJ AREA, PO-DEULBARA COLLIERY, TACLHER, DIST-ANGUL, ODISHA-759102 2/21 (Staff Officer Mm, Lingaraj Area) UIN Number NCTGC2415P
Sofa (V3) (Q2), Revolving Chair (V5) (Q2), Chair for General Purpose (Q2), Plastic Chairs For General Purposes conforming to IS 13713 (V3) (Q2), Computer Table (V3) (Q2) (3 (3 ))
Dual Desk, Sliding Pannel Enclosure with Green and White Board, Enclosure Base Unit, Wooden Podium, Teacher s Table, Teacher s Chair, Science Laboratory Table Chemistry, Science Laboratory Table Biology, Science Laboratory Table Physics, Lab Stool, ... Linear Workstation 5 ...
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4), Tea Set (V2) (Q4), Desktop Calculator - Electronics (Q4), Wall Clocks (Battery Operated) (V2) Conforming to IS 12510 (Q4), knife blades (Q4) (3 (3 ))
Manpower Outsourcing Services - Minimum wage - Skilled; ANY GRADUATE WITH CCC; Admin, Manpower Outsourcing Services - Minimum wage - Skilled; MS OFFICE OR DCA; Admin, Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Others, ... OF COMPUTER ; ... of computer , ... Knowledge Computer ; ... Knowledge Computer Autocad; ... of computer ; ... of computer ; ... of computer ; ... of computer , ... of computer , ...
Executive Table (V3) (Q2), Revolving Chair (V4) (Q2), Office Chair (V3) (Q2), Computer Table (V2) (Q2), Steel Bookcases confirming to IS 7761 (V2) (Q2), Modular Extendable Conference Table (V2) (Q2)
16 GB RAM (DDR4) (Q3), 2.5 inch SATA SSD 940 GB (Q3), 10G 2 PORT BASE-T/X NIC (Q3), Multi-core Single Board Computer (Q3), 8 Port KVM (Q3)
NVR, Hard Disk Drive, Cat-6 Cable, POE Network Switch, Desktop Network Switch, NVR Rack, Network Server Rack, HDMI Cable, USB Cable, Wireless Mouse, HDMI Switcher BOQ Title BOQ for Security and Surveillance System
Matress, Bedsheet, Pillow With Cover, Gas Stove Big Size, Steel Try, Steel Glass, Serving Spoon, Big Top with cover, Small Top With Cover, Mixer Grinder, Aluminium Bucket, Vegitable Cutter, Iron Rice Stainer, Aluminium Kadai Big size, Iron Paniki, SS ... MDF Computer Table ... X2.5, Desktop Computer i3 ...
Repair and Overhauling Service - Uninterruptible power supply (UPS); POWER APPLICATION SYSTEM--POWER APPLICATION SYSTEM; No; Service Provider Premises, Repair and Overhauling Service - Computer Printers; Pantum; Yes; Service Provider Premises, Buyer Premises
Artificial intelligence, Machine Learning, and Deep Learning as a Service - Development, O&M, Integration with pre- developed service provider’s module; Computer Vision and Automated Image Recognition; Manufacturing, Mining; Video, Image; Supervised..
Artificial intelligence, Machine Learning, and Deep Learning as a Service - Development, O&M, Integration with pre- developed service provider’s module; Computer Vision and Automated Image Recognition; Manufacturing, Mining; Audio, Video; Supervised; ..
Instructor Console, Desktop PC, UPS five KVA online, Central Display, English Language System Software, Regional Language to Hindi Training Softwares, Electric Connection, Supply and work of nature including cables, Tables for work stations, Revolving Chair
Washing Machine, Wall Mounted Fan, Ceiling Fan, 1450VA or Higher Shine Wave Inverter, 12V 150Ah or Higher Lead Acid Battery, Single Battery Trolly, Desktop Intel i3, Line Interactive UPS 650VA 15Min Backup, Headphone Buetlooth Wire
Computer Printer (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7061112 Dated : 12-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 76068 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Construction of work stations provision of Computer Desk and Cup Boards UKHEP Bariniput and Supply Installation of New Split Air Conditioner for Work Station in IT Room of Administrative Building UKHEP Bariniput
Sofas (Version 2) (Q3) ( PAC Only ), Executive Computer Table (Q3) ( PAC Only ), Revolving Chair (Version 2) (Q3) ( PAC Only ), Chair Office (Version 2) (Q3) ( PAC Only ), Modular Work Stations (Q3) ( PAC Only )
Correspondence Envelopes (V3) Conforming to IS 13892, Correspondence Envelopes (V3), Desktop Trays or Organizers (V2), Staple Pins/Staples(V3), Staplers(V3), Alpins, Net wt. 100 gm (100 pins in a Box), Alpin Box, Oval Size Magnetic
Construction of Paver Road over Kutcha Road
computer servers Computer Servers ( 16 ) Technical Specifications Specification Specification Name Values Allowed Values Specification Form Factor Rack Rack Size (RU) 2 - Processor Make Intel Intel Max. Number of sockets available on chipset 2 2 Max. Number of sockets populated with processor 2 2 Number of core per Processor 12 12 Processor Configuration Intel Xeon Silver 4116 ( 2.10GHz/12-core/16.5M B/85W) E3-1585 v5, 4 Core, 3.5 GHz, 8 MB L3 cache memory, 65 watt, E3-1585L v5, 3.0 GHz, 45 watt, E3-1565L v5, 2.5 GHz, 35 watt, E5-4669 v4, 22 core, 2.2 GHz with 55 MB cache memory, 135 watt, E5-4667 v4, 18 core, 2.2 GHz with 45 1/12 MB cache memory, E5-4660 v4, 16 core, 2.2 GHz with 40 MBcache memory, 120 watt, E5-4655 v4, 8 core, 2.5 GHz with 30 MBcache memory, E5-4650 v4, 14 core, 2.2GHz with 35 MBcache memory, 105 watt, E5-4640 v4, 12 core, 2.1 GHz with 30 MB cache memory, E5-4628L v4, 1.8 GHz with 35 MB cache memory, 75 watt, E5-4627 v4, 10 core, 2.6 GHz with 25 MB cache memory, E5-4620 v4, 2.1 GHz with 25 MB cache memory, E5-4610 v4, 1.8 GHz with 25 MB cache memory, E5-2699A v4, 2.4 GHz with 55 MB cache memory, 145 watt, E5-2699 v4, 2.2 GHz with 55 MB smart cache memory, E5-2698 v4, 20 core, 2.2 GHz with 50 MB smart cache memory, E5-2697 v4, 2.3 GHz with 45 MB smart cache memory, E5-2697A v4, 2.6 GHz with 40 MB smart cache memory, E5-2695 v4, 2.1 GHz with 45 MB smart cache memory, E5-2690 v4, 2.6 GHz with 35 MB smart cache memory, E5-2687W v4, 3.0 GHz with 30 MB smart cache memory, 160 watt, E5-2683 v4, 2.1 GHz with 40 MB smart cache memory, 120 watt 2/12, E5-2680 v4, 2.40GHz with 35 MB smart cache memory, E5-2667 v4, 3.20GHz with 25 MB smart cache memory, E5-2660 v4, 2.00GHz with 35 MB cache memory, E5-2650 v4, 2.20GHz with 30 MB smart cache memory, E5-2650L v4, 1.70GHz with 35 MB smart cache memory, E5-2643 v4, 6 core, 3.40GHz with 20 MB smart cache memory, E5-2640 v4, 2.40GHz with 25 MB smart cache memory, 90 watt, E5-2637 v4, 3.50GHz with 15 MB smart cache memory, E5-2630 v4, 2.20GHz with 25 MB smart cache memory, 85 watt, E5-2630L v4, 1.80GHz with 25 MB smart cache memory, 55 watt, E5-2623 v4, 2.60GHz with 10 MB smart cache memory, E5-2620 v4, 2.10 GHz with 20 MB smart cache memory, E5-2609 v4, 1.70 GHz with 20 MB smart cache memory, E5-2603 v4, 1.70GHz with 15 MB smart cache memory, E5-1680 v4, 3.40GHz with 20 MB cache memory, 140 watt, E5-1660 v4, 3.20GHz with 20 MB cache memory, E5-1650 v4, 3.60GHz with 15 3/12 MB cache memory, E5-1630 v4, 3.70GHz with 10 MB cache memory, E5-1620 v4, 3.50GHz with 10 MB cache memory, E7-8894 v4, 24 core, 2.4 GHz with 60 MB cache memory, 165 watt, E7-8893 v4, 3.2 GHz with 60 MB cache memory, E7-8891 v4, 2.8 GHz with 60 MB cache memory, E7-8867 v4, 2.4 GHz with 45 MB cache memory, E7-8890 v4, 2.2 GHz with 60 MB cache memory, E7-8880 v4, 150 watt, E7-8870 v4, 2.1 GHz with 50 MB cache memory, E7-8860 v4, 2.2GHz with 45 MB cache memory, E7-4850 v4, 2.1 GHz with 40 MB cache memory, 115 watt, E7-4830 v4, 2.0 GHz with 35 MB cache memory, E7-4820 v4, 2.0 GHz with 25 MB cache memory, E7-4809 v4, 2.1 GHz with 20 MB cache memory, D-1577, 1.30 GHz with 24 MB cache memory, D-1571, D-1567, 2.10 GHz with 18 MB cache memory, D-1559, 1.50 GHz with 18 MB cache memory, D-1557, 1.50 GHz with 18 MB cache 4/12 memory, D-1539, 1.60 GHz with 12 MB cache memory, D-1529, 1.30 GHz with 6 MB cache memory, 20 watt, Intel Xeon Bronze 3104(1.70 GHz/6-core/8.25MB/85 W), Intel Xeon Bronze 3 106(1.70GHz/8-core/11 MB/85W), Intel Xeon Silver 4108(1.80GHz/8- core/11MB/85W), Intel Xeon Silver 4109T(2.00 GHz/8-core/11MB/70W), Intel Xeon Silver 4110 (2.10GHz/8-core/11MB 85W), Intel Xeon Silver 4112 (2.60GHz/4-core 8.25MB/85W), Intel Xeon Silver 4114 (2.20 GHz/10-core/13.75MB/8 5W), Intel Xeon Silver 4116 (2.10GHz/12-core 16.5MB/85W), Intel Xeon Gold 5115 (2.40G Hz/10-core/13.75MB/85 W), Intel Xeon Gold 5118 (2.30GHz/12-core 16.5MB/105W), Intel Xeon Gold 5119T (1.90 GHz/14-core/19.25MB/8 5W), Intel Xeon Gold 5120 (2.20GHz/14-core 19.25MB/105W), Intel Xeon Gold 5120T (2.20 GHz/14-core/19.25MB/1 05W), Intel Xeon Gold 5122 (3.60GHz/4-core 16.5MB/105W), Intel Xeon Gold 6126 (2.60G Hz/12-core/19.25MB/12 5W), Intel Xeon Gold 6126F (2.60GHz/12-cor e/19.25MB/135W), Intel Xeon Gold 6126T (2.60 GHz/12-core/19.25MB/1 25W), Intel Xeon Gold 6128 (3.40GHz/6-core 19.25MB/115W), Intel Xeon Gold 6130 (2.10G Hz/16-core/22MB/125W ), Intel Xeon Gold 6130F (2.10GHz/16-core/22MB 135W), Intel Xeon Gold 6130T (2.10GHz/16-cor 5/12 e/22MB/125W), Intel Xeon Gold 6132 (2.60G Hz/14-core/19.25MB/14 0W), Intel Xeon Gold 6134 (3.20GHz/8-core 24.75MB/130W), Intel Xeon Gold 6134M (3.20 GHz/8-core/24.75MB/13 0W), Intel Xeon Gold 6136 (3.00GHz/12-core 24.75MB/150W), Intel Xeon Gold 6138 (2.00G Hz/20-core/27.5MB/125 W), Intel Xeon Gold 6138F (2.00GHz/20-cor e/27.5MB/135W), Intel Xeon Gold 6138T (2.00 GHz/20-core/27.5MB/12 5W), Intel Xeon Gold 6140 (2.30GHz/18-core 24.75MB/140W), Intel Xeon Gold 6140M (2.30 GHz/18-core/24.75MB/1 40W), Intel Xeon Gold 6142 (2.60GHz/16-core 22MB/150W), Intel Xeon Gold 6142F (2.60 GHz/16-core/22MB/160 W), Intel Xeon Gold 6142M (2.60GHz/16-cor e/22MB/150W), Intel Xeon Gold 6144(3.50G Hz/8-core/24.75MB/150 W), Intel Xeon Gold 614 6(3.20GHz/12-core/24. 75MB/165W), Intel Xeon Gold 6148(2.40GHz/20- core/27.50MB/150W), In tel Xeon Gold 6148F(2. 40GHz/20-core/27.50M B/160W), Intel Xeon Gold 6150(2.70GHz/18- core/24.75MB/165W), In tel Xeon Gold 6152(2.1 0GHz/22-core/30.25MB 140W), Intel Xeon Gold 6154(3.00GHz/18-core 24.75MB/200W), Intel Xeon Platinum 8153(2. 00GHz/16-core/22MB/1 25W), Intel Xeon Platinum 8156(3.60GHz 4-core/16.5MB/105W), I ntel Xeon Platinum 815 8(3.00GHz/12-core/24. 75MB/150W), Intel Xeon Platinum 8160(2.10GHz 6/12 24-core/33MB/150W), I ntel Xeon Platinum 816 0F(2.10GHz/24-core/33 MB/160W), Intel Xeon Platinum 8160M(2.10G Hz/24-core/33MB/150W ), Intel Xeon Platinum 8 160T(2.10GHz/24-core 33MB/150W), Intel Xeon Platinum 8164(2.00GHz 26-core/35.75MB/150 W, Intel Xeon Platinum 8168(2.70GHz/24-core 33MB/205W), Intel Xeon Platinum 8170(2.10GHz 26-core/35.75MB/165 W), Intel Xeon Platinum 8170M(2.10GHz/26-cor e/35.75MB/165W), Intel Xeon Platinum 8176(2. 10GHz/28-core/38.50M B/165W), Intel Xeon Platinum 8176F(2.10GH z/28-core/38.50MB/173 W), Intel Xeon Platinum 8176M(2.10GHz/28-cor e/38.50MB/165W), Intel Xeon Platinum 8180(2. 50GHz/28-core/38.50M B/205W), Intel Xeon Platinum 8180M(2.50G Hz/28-core/38.50MB/20 5W), Intel Xeon Silver 4114T (2.20GHz/10-cor e/13.75MB/85W), Intel Xeon Silver 4116T (2.1 0GHz/12-core/16.5MB/8 5W), D-1553N, 2.3 GHz with 12 MB cache memory, D-1543N, 1.9 GHz with 12 MB cache memory, D-1533N, 2.1 GHz with 9 MB cache memory, D-1523N, 2.0GHz with 6 MB cache memory, D-1513N, 1.6 GHz with 6 MB cache memory, EPYC-7251, 2.1 GHz, 32 MB cache memory, EPYC-7281, 32 MB 7/12 cache memory, 170 watt, EPYC-7301, 2.2 GHz, 64 MB cache memory, EPYC-7351, 2.4 GHz, EPYC-7351P, EPYC-7401, 2.0 GHz, EPYC-7401P, EPYC-7451, 2.3 GHz, 180 watt, EPYC-7501, 32 Core, EPYC-7551, EPYC-7551P, EPYC-7601, SPARC S7 (4.27 GHz, 16 MB Cache, 8 Cores), SPARC M7 (4.13 GHz, 64 MB Cache, 32 Cores), SPARC M8 (5.0 GHz, 32 Cores) Chipset compatible with CPU C 620 SERIES - Availability of Co- Processor Yes - If Yes Co-Processor Configuration NA Phi-7210, 64 core, 1.30 GHz with 32 MB L2 cache memory, 215 watt, Phi-7210F, 230 watt, Phi-7230, Phi-7230F, Phi-7250, 68 core, 1.40 GHz with 34 8/12 MB L2 cache memory, Phi-7250F, 1.40 GHz with 34 MB L2 cache memory, Phi-7290, 72 core, 1.50 GHz with 36 MB L2 cache memory, 245 watt, Phi-7290F, 260 watt, NA PCI Slots (Express Gen 3.0) 2 - Type of RAM DDR4 - RAM Size (GB) 128 RAM upgradable upto (GB) 512 DIMM Slots (No.) 16 - Type of Hard Disk Drive SAS SAS, NL SAS, SSD, SATA Hard disk drive Capacity (GB) 4800 Hard disk drive Speed (RPM) 10K - RAID Controller Cache (MB) 8192 - RAID Type 5 - RAID Controller Ports @12 Gbps 2 - Video Controller (support VGA or above resolution) Yes - Keyboard Yes - Mouse Yes - Bays (min. 2 internal or more hot plug) 8 - USB Ports (version 2.0/3.0) 4 - Certifications, Compliance support by Windows, Red Hat or Novell. Yes - DVD ROM (or better) 8x or better - Network Card Supported 10G - FC HBA Dual port card NA - 9/12 FC HBA Dual port card Speed NA - Power Management - - Redundant Power Supply Yes - Redundant Fan Yes - Total No of Ports 4x USB Port, 2.0 min (Dynamically enbled USB port )OEM letter certifying, silicon root of trust, Automatic BIAS - Declare SPEC int rate base 2006 & specfp rate 2006 for 1, 2, 4, 8 prcessor as applicable. - - Server scalability to be achieved within the box without adding nodes Yes - RoHS Compliance Yes - BIS Registration number & its Validity - - Max. power consumption of the system (Watt) 750 - Availability of Type test reports consisting of verification of all the features & functional parameters & environmental tests sequences as under: a Dry heat test (For 16 hrs at a temperature of 45 degree C in accordance with IS: 90 00/part-3/section-5/197 7) b Cold test(For 4 hrs at a temperature of 0 degree C in accordance with IS: 9000/part-2/sec tion-4/1977 c Damp Heat Cyclic Test ( For 2 cycles of 24 hrs at a temperature of 40 degree C & 95% RH in accordance with IS: 90 00/part-5/section-1/198 1) Note:- The server shall be checked for all Yes - 10/12 the parameters before conditioning, After completion of the above environmental tests sequence, with a recovery period of 1 to 2 hrs, the server shall be functional Name address of Lab - - Test Report No. date - - Power Supply 230 V +/-10%, 50 Hz - On Site OEM Warranty (years) 5 5 * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Sambit Kumar Panda 751001, Multiple locations delivery in the Districts of Odisha State. List of Districts will be provided to L1 vendor(through mail or print out will be given). 16 30 EMD Advisory Bank HDFC Bank EMD Percentage(%) 1.00 EMD Amount 88000 ePBG Advisory Bank ICICI ePBG Percentage(%) 2.00 Duration of ePBG required (Months). 62
computer servers Computer Servers ( 17 ) Technical Specifications Specification Specification Name Values Allowed Values Specification Form Factor Tower Tower Size (RU) 5 - Processor Make Intel Intel Max. Number of sockets available on chipset 2 2 Max. Number of sockets populated with processor 1 1 Number of core per Processor 8 8 Processor Configuration Intel Xeon Silver 4108( 1.80GHz/8-core/11MB/8 5W) E3-1585 v5, 4 Core, 3.5 GHz, 8 MB L3 cache memory, 65 watt, E3-1585L v5, 3.0 GHz, 45 watt, E3-1565L v5, 2.5 GHz, 35 watt, E5-4669 v4, 22 core, 2.2 GHz with 55 MB cache memory, 135 watt, E5-4667 v4, 18 core, 2.2 GHz with 45 1/12 MB cache memory, E5-4660 v4, 16 core, 2.2 GHz with 40 MBcache memory, 120 watt, E5-4655 v4, 8 core, 2.5 GHz with 30 MBcache memory, E5-4650 v4, 14 core, 2.2GHz with 35 MBcache memory, 105 watt, E5-4640 v4, 12 core, 2.1 GHz with 30 MB cache memory, E5-4628L v4, 1.8 GHz with 35 MB cache memory, 75 watt, E5-4627 v4, 10 core, 2.6 GHz with 25 MB cache memory, E5-4620 v4, 2.1 GHz with 25 MB cache memory, E5-4610 v4, 1.8 GHz with 25 MB cache memory, E5-2699A v4, 2.4 GHz with 55 MB cache memory, 145 watt, E5-2699 v4, 2.2 GHz with 55 MB smart cache memory, E5-2698 v4, 20 core, 2.2 GHz with 50 MB smart cache memory, E5-2697 v4, 2.3 GHz with 45 MB smart cache memory, E5-2697A v4, 2.6 GHz with 40 MB smart cache memory, E5-2695 v4, 2.1 GHz with 45 MB smart cache memory, E5-2690 v4, 2.6 GHz with 35 MB smart cache memory, E5-2687W v4, 3.0 GHz with 30 MB smart cache memory, 160 watt, E5-2683 v4, 2.1 GHz with 40 MB smart cache memory, 120 watt 2/12, E5-2680 v4, 2.40GHz with 35 MB smart cache memory, E5-2667 v4, 3.20GHz with 25 MB smart cache memory, E5-2660 v4, 2.00GHz with 35 MB cache memory, E5-2650 v4, 2.20GHz with 30 MB smart cache memory, E5-2650L v4, 1.70GHz with 35 MB smart cache memory, E5-2643 v4, 6 core, 3.40GHz with 20 MB smart cache memory, E5-2640 v4, 2.40GHz with 25 MB smart cache memory, 90 watt, E5-2637 v4, 3.50GHz with 15 MB smart cache memory, E5-2630 v4, 2.20GHz with 25 MB smart cache memory, 85 watt, E5-2630L v4, 1.80GHz with 25 MB smart cache memory, 55 watt, E5-2623 v4, 2.60GHz with 10 MB smart cache memory, E5-2620 v4, 2.10 GHz with 20 MB smart cache memory, E5-2609 v4, 1.70 GHz with 20 MB smart cache memory, E5-2603 v4, 1.70GHz with 15 MB smart cache memory, E5-1680 v4, 3.40GHz with 20 MB cache memory, 140 watt, E5-1660 v4, 3.20GHz with 20 MB cache memory, E5-1650 v4, 3.60GHz with 15 3/12 MB cache memory, E5-1630 v4, 3.70GHz with 10 MB cache memory, E5-1620 v4, 3.50GHz with 10 MB cache memory, E7-8894 v4, 24 core, 2.4 GHz with 60 MB cache memory, 165 watt, E7-8893 v4, 3.2 GHz with 60 MB cache memory, E7-8891 v4, 2.8 GHz with 60 MB cache memory, E7-8867 v4, 2.4 GHz with 45 MB cache memory, E7-8890 v4, 2.2 GHz with 60 MB cache memory, E7-8880 v4, 150 watt, E7-8870 v4, 2.1 GHz with 50 MB cache memory, E7-8860 v4, 2.2GHz with 45 MB cache memory, E7-4850 v4, 2.1 GHz with 40 MB cache memory, 115 watt, E7-4830 v4, 2.0 GHz with 35 MB cache memory, E7-4820 v4, 2.0 GHz with 25 MB cache memory, E7-4809 v4, 2.1 GHz with 20 MB cache memory, D-1577, 1.30 GHz with 24 MB cache memory, D-1571, D-1567, 2.10 GHz with 18 MB cache memory, D-1559, 1.50 GHz with 18 MB cache memory, D-1557, 1.50 GHz with 18 MB cache 4/12 memory, D-1539, 1.60 GHz with 12 MB cache memory, D-1529, 1.30 GHz with 6 MB cache memory, 20 watt, Intel Xeon Bronze 3104(1.70 GHz/6-core/8.25MB/85 W), Intel Xeon Bronze 3 106(1.70GHz/8-core/11 MB/85W), Intel Xeon Silver 4108(1.80GHz/8- core/11MB/85W), Intel Xeon Silver 4109T(2.00 GHz/8-core/11MB/70W), Intel Xeon Silver 4110 (2.10GHz/8-core/11MB 85W), Intel Xeon Silver 4112 (2.60GHz/4-core 8.25MB/85W), Intel Xeon Silver 4114 (2.20 GHz/10-core/13.75MB/8 5W), Intel Xeon Silver 4116 (2.10GHz/12-core 16.5MB/85W), Intel Xeon Gold 5115 (2.40G Hz/10-core/13.75MB/85 W), Intel Xeon Gold 5118 (2.30GHz/12-core 16.5MB/105W), Intel Xeon Gold 5119T (1.90 GHz/14-core/19.25MB/8 5W), Intel Xeon Gold 5120 (2.20GHz/14-core 19.25MB/105W), Intel Xeon Gold 5120T (2.20 GHz/14-core/19.25MB/1 05W), Intel Xeon Gold 5122 (3.60GHz/4-core 16.5MB/105W), Intel Xeon Gold 6126 (2.60G Hz/12-core/19.25MB/12 5W), Intel Xeon Gold 6126F (2.60GHz/12-cor e/19.25MB/135W), Intel Xeon Gold 6126T (2.60 GHz/12-core/19.25MB/1 25W), Intel Xeon Gold 6128 (3.40GHz/6-core 19.25MB/115W), Intel Xeon Gold 6130 (2.10G Hz/16-core/22MB/125W ), Intel Xeon Gold 6130F (2.10GHz/16-core/22MB 135W), Intel Xeon Gold 6130T (2.10GHz/16-cor 5/12 e/22MB/125W), Intel Xeon Gold 6132 (2.60G Hz/14-core/19.25MB/14 0W), Intel Xeon Gold 6134 (3.20GHz/8-core 24.75MB/130W), Intel Xeon Gold 6134M (3.20 GHz/8-core/24.75MB/13 0W), Intel Xeon Gold 6136 (3.00GHz/12-core 24.75MB/150W), Intel Xeon Gold 6138 (2.00G Hz/20-core/27.5MB/125 W), Intel Xeon Gold 6138F (2.00GHz/20-cor e/27.5MB/135W), Intel Xeon Gold 6138T (2.00 GHz/20-core/27.5MB/12 5W), Intel Xeon Gold 6140 (2.30GHz/18-core 24.75MB/140W), Intel Xeon Gold 6140M (2.30 GHz/18-core/24.75MB/1 40W), Intel Xeon Gold 6142 (2.60GHz/16-core 22MB/150W), Intel Xeon Gold 6142F (2.60 GHz/16-core/22MB/160 W), Intel Xeon Gold 6142M (2.60GHz/16-cor e/22MB/150W), Intel Xeon Gold 6144(3.50G Hz/8-core/24.75MB/150 W), Intel Xeon Gold 614 6(3.20GHz/12-core/24. 75MB/165W), Intel Xeon Gold 6148(2.40GHz/20- core/27.50MB/150W), In tel Xeon Gold 6148F(2. 40GHz/20-core/27.50M B/160W), Intel Xeon Gold 6150(2.70GHz/18- core/24.75MB/165W), In tel Xeon Gold 6152(2.1 0GHz/22-core/30.25MB 140W), Intel Xeon Gold 6154(3.00GHz/18-core 24.75MB/200W), Intel Xeon Platinum 8153(2. 00GHz/16-core/22MB/1 25W), Intel Xeon Platinum 8156(3.60GHz 4-core/16.5MB/105W), I ntel Xeon Platinum 815 8(3.00GHz/12-core/24. 75MB/150W), Intel Xeon Platinum 8160(2.10GHz 6/12 24-core/33MB/150W), I ntel Xeon Platinum 816 0F(2.10GHz/24-core/33 MB/160W), Intel Xeon Platinum 8160M(2.10G Hz/24-core/33MB/150W ), Intel Xeon Platinum 8 160T(2.10GHz/24-core 33MB/150W), Intel Xeon Platinum 8164(2.00GHz 26-core/35.75MB/150 W, Intel Xeon Platinum 8168(2.70GHz/24-core 33MB/205W), Intel Xeon Platinum 8170(2.10GHz 26-core/35.75MB/165 W), Intel Xeon Platinum 8170M(2.10GHz/26-cor e/35.75MB/165W), Intel Xeon Platinum 8176(2. 10GHz/28-core/38.50M B/165W), Intel Xeon Platinum 8176F(2.10GH z/28-core/38.50MB/173 W), Intel Xeon Platinum 8176M(2.10GHz/28-cor e/38.50MB/165W), Intel Xeon Platinum 8180(2. 50GHz/28-core/38.50M B/205W), Intel Xeon Platinum 8180M(2.50G Hz/28-core/38.50MB/20 5W), Intel Xeon Silver 4114T (2.20GHz/10-cor e/13.75MB/85W), Intel Xeon Silver 4116T (2.1 0GHz/12-core/16.5MB/8 5W), D-1553N, 2.3 GHz with 12 MB cache memory, D-1543N, 1.9 GHz with 12 MB cache memory, D-1533N, 2.1 GHz with 9 MB cache memory, D-1523N, 2.0GHz with 6 MB cache memory, D-1513N, 1.6 GHz with 6 MB cache memory, EPYC-7251, 2.1 GHz, 32 MB cache memory, EPYC-7281, 32 MB 7/12 cache memory, 170 watt, EPYC-7301, 2.2 GHz, 64 MB cache memory, EPYC-7351, 2.4 GHz, EPYC-7351P, EPYC-7401, 2.0 GHz, EPYC-7401P, EPYC-7451, 2.3 GHz, 180 watt, EPYC-7501, 32 Core, EPYC-7551, EPYC-7551P, EPYC-7601, SPARC S7 (4.27 GHz, 16 MB Cache, 8 Cores), SPARC M7 (4.13 GHz, 64 MB Cache, 32 Cores), SPARC M8 (5.0 GHz, 32 Cores) Chipset compatible with CPU C 620 SERIES - Availability of Co- Processor Yes - If Yes Co-Processor Configuration NA Phi-7210, 64 core, 1.30 GHz with 32 MB L2 cache memory, 215 watt, Phi-7210F, 230 watt, Phi-7230, Phi-7230F, Phi-7250, 68 core, 1.40 GHz with 34 8/12 MB L2 cache memory, Phi-7250F, 1.40 GHz with 34 MB L2 cache memory, Phi-7290, 72 core, 1.50 GHz with 36 MB L2 cache memory, 245 watt, Phi-7290F, 260 watt, NA PCI Slots (Express Gen 3.0) 5 - Type of RAM DDR4 - RAM Size (GB) 64 RAM upgradable upto (GB) 512 DIMM Slots (No.) 16 - Type of Hard Disk Drive SAS SAS, NL SAS, SSD, SATA Hard disk drive Capacity (GB) 4800 Hard disk drive Speed (RPM) 10K - RAID Controller Cache (MB) 8192 - RAID Type 5 - RAID Controller Ports @12 Gbps 2 - Video Controller (support VGA or above resolution) Yes - Keyboard Yes - Mouse Yes - Bays (min. 2 internal or more hot plug) 8 - USB Ports (version 2.0/3.0) 4 - Certifications, Compliance support by Windows, Red Hat or Novell. Yes - DVD ROM (or better) 8x or better - Network Card Supported 1G - FC HBA Dual port card NA - 9/12 FC HBA Dual port card Speed NA - Power Management - - Redundant Power Supply Yes - Redundant Fan Yes - Total No of Ports 4x USB Ports, 2.0 MIn (Dynamically enabled USB Ports), All hardware sub- component should be from the server OEM.OEM's spare inventory in or around bhubaneswar .OEM should in the leader's quardant in last pusblished Gartners magic quadrant for modular server.80 plus platinum rated power supply . - Declare SPEC int rate base 2006 & specfp rate 2006 for 1, 2, 4, 8 prcessor as applicable. - - Server scalability to be achieved within the box without adding nodes Yes - RoHS Compliance Yes - BIS Registration number & its Validity - - Max. power consumption of the system (Watt) 750 - Availability of Type test reports consisting of verification of all the features & functional parameters & environmental tests sequences as under: a Dry heat test (For 16 hrs at a temperature of 45 degree C in accordance with IS: 90 00/part-3/section-5/197 7) b Cold test(For 4 hrs at a temperature of 0 degree C in accordance Yes - 10/12 with IS: 9000/part-2/sec tion-4/1977 c Damp Heat Cyclic Test ( For 2 cycles of 24 hrs at a temperature of 40 degree C & 95% RH in accordance with IS: 90 00/part-5/section-1/198 1) Note:- The server shall be checked for all the parameters before conditioning, After completion of the above environmental tests sequence, with a recovery period of 1 to 2 hrs, the server shall be functional Name address of Lab - - Test Report No. date - - Power Supply 230 V +/-10%, 50 Hz - On Site OEM Warranty (years) 5 5 * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Sambit Kumar Panda 751001, Multiple locations delivery in the Districts of Odisha State. List of Districts will be provided to L1 vendor(through mail or print out will be given). 17 30 EMD Advisory Bank HDFC Bank EMD Percentage(%) 1.00 EMD Amount 68000 ePBG Advisory Bank ICICI ePBG Percentage(%) 2.00 Duration of ePBG required (Months). 62
Chair Office (V2) (Q3), Steel Filing Cabinets for General Office Purpose (V2) as per IS 3313 (Q2), Computer Table (Q3), Plastic Moulded Chair as per IS 13713 (V2) (Q3), Revolving Chair (V3) (Q2)
Multifunction Machine MFM (V2) (Q2), Entry and Mid Level Desktop Computer (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past ... Level Desktop Computer Time ...
Pannel Enclosure, Dual desk, Faculty Table, Faculty Chair, Display Board Covered with glass, Notice Board, Wooden Storage Unit, Workstation, Side Unit, Meeting Table, Chair, Tractor Diesel Engine, Tractor trailer with hydraulic system, Grass Bush cutter, Tractor, Disc Plough, Mechanical power Weeder, Multi crop thresher, Power tiller, Rotavator, Sewing Machine Bag stitcher, Chisel Plough, Small paddy dehauskar, Submersible pump complete unit
Computer Printer (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days Bid Number ( ) : GEM/2025/B/6100236 Dated : 22-05-2025 Bid Document 1/12 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Estimated Bid Value 275000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 5 (a). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : HOD FINANCE CMPDI Regional Institute 7 Bhubaneswar, COAL INDIA LIMITED, Central Mine Planning and Design Institute Limited, Ministry of Coal (Cmpdi Ri Vii) MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "