Loading…
Loading…
1,339 results • Best match
Custom Bid for Services - Consultancy Charges for the Detailed Scope of work and Assignment Deliverables as mentioned at SCC, Custom Bid for Services - Incidental Charges Other Miscellaneous Expenses Refer Clause 9 of SCC
Expression of Interest (EOI) for Consultancy work for the Construction of chaupal at Ahariya Basti in village Mawai of Ward No.28 Div-III Faridabad
Appointment of consultancy agency for Construction of various community centers/ chaupals and shed at various locations in MC, Barwala under CM Announcement code no. 22820.
Consultancy for Strengthening of bank and construction of 7.5M wide bridge at RD 64600 of Main Drain No 2 to make the revenue path functional
Consultancy for the work of Re-construction of Permanent Pump House at RD 45000/L of BML Barwala Link Channel in village Ujhana (Sr. No
Providing Perimeter road lighting (Electrical Work) at Maharaja Agarsen Airport, Hisar (Phase-II) (Providing Consultancy Service for Preparing Estimate, BOQ, DNIT etc for electrical work.)
Hiring of Consultants - Milestone/Deliverable Based - Hiring of Agency for Providing Manpower Infrastructure Logistics Technical Support for the works in Distt Udaipur Salumber division Distt Rajasmand Amet Rajasmand division Distt Chittorgarh C..
Hiring of Consultants - Milestone/Deliverable Based - Hiring of Agency for Providing Manpower Infrastructure Logistics Technical Support for the works in Distt Udaipur Division Rural District Udaipur Distt Pratapgarh Pratapgarh division Package1; D..
Hiring of Consultants - Milestone/Deliverable Based - As Per Nit; Appointment of agency for carrying out Geotechnical investigation works and soil Analysis for Formulation Of; No; Hybrid(As specified in scope of work)
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Agency for Providing Services for Rendering Technical Logistic Support for Various Infrastructure Projects in the State of Karnataka under Scheduled Tribes Welfare Department; Proj..
SUPPLY OF BOTTLE HOLDER OF VB TRAIN SET EXECUTIVE SEAT OF M/s. PERFECT TECHNO CONSULTANTS PVT.LIMITED TO PART NUMBER -205324,CONFORMING TO SPEC: ICF/MD/SPEC-389,REV -00,AMD-01.
Custom Bid for Services - LIMITED TENDER FOR CONDUCTING T4S AUDIT AS PER PNGRB REGULATIONS FOR KARNAL LPG BOTTLING PLANT UNDER INDIAN OIL DELHI STATE OFFICE Similar Category Empanelment of Consultants/Service Providers
Hiring of Consultants - Milestone/Deliverable Based - Carrying out Topographical Survey using Drone LiDAR System Hydrographic Survey for the Barrage Projects in Puducherry Region; Carrying out Topographical Survey using Drone LiDAR System Hydrograp..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Augmentation at Fatehgarh II PS Fatehgarh IV PS (Sec II) and Barmer-I PS; Energy (Oil, Gas, Power, Renewables); No; Hybrid(As specified in scope of work)
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Transmission System under ISTS for evacuation of power from Kudankulam Unit 3 and 4 (2x1000 MW); Energy (Oil, Gas, Power, Renewables); No; Hybrid(As specif..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Transmission System for Evacuation of Power from REZ in Rajasthan (20GW) under Phase-III Part I; Energy (Oil, Gas, Power, Renewables); No; Hybrid(As specifi..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Transmission System under ISTS for evacuation of power from Kudankulam Unit - 3 and 4 2x1000 MW; Energy (Oil, Gas, Power, Renewables); No; Hybrid(As specifi..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Transmission system for evacuation of power from Rajasthan REZ PHIV Part 1 Bikaner Complex Part C; Energy (Oil, Gas, Power, Renewables); No; Hybrid(As speci..
EXPRESSION OF INTEREST (EOI) FOR EMPANNELMENT OF CONSULTANT FOR PREPARTION OF DETAILED PROJECT REPORT (DPR) FOR WORK CONSTRUCTIUON OF STORM WATER CHANNEL/DRAINFROM KHERA MANDIR TO MAIN PUMPING STATION MC RADAUR
Appointment of Consultant for Preparation of Detailed Project Reports and Project Management for Sewage Treatment Plant, Sewerage Network and Sprinkler Irrigation System in the Premises of Indira Gandhi University, Meerpur, Rewari.
Consultant for preparation of detail project report including complete drawing GAD, Carrying out survey, Geotechnical investigation, Feasibility Study, layout Collecting Hydraulic n all other relevant data. The Geotechnical investigation working draw
Empanelment of Consultant with Municipal Council, Kalka for the purpose of Planning, Designing and Submission of DPR w.r.t Architectural Works, Urban Regeneration, Infrastructure Development i.e., Road works, Water Supply, Sewerage etc.
Hiring of Consultants - Per Person Per Month Based - Subject Matter Experts; Energy (Oil, Gas, Power, Renewables); BE or BTech with Masters in data Analytics or AI or any other relevant field from top 100 QS World University Rankings with Minimum 15 .., Renewables); BE or BTech with MBA from top 500 QS World University Rankings (PhD is preferable) with Minimum 10 years of relevant experience; No, Renewables); BE or BTech with MBA or PGDM equivalent with Minimum 5 years of relevant experience; No, Renewables); BE or BTech with MBA or PGDM equivalent with Minimum 3 years of relevant experience; No
EXPRESSION OF INTEREST FOR EMPENELLMENT/ENGAGEMENT OF ARCHITECT FIRM/CONSULTANCY FIRM FOR SETTING UP SPICES AND CEREAL/GRAIN PROCESSING PILOT PLANT AT NIFTEM, KUNDLI SONEPAT, HARYANA
Hiring consultancy for technical ........ for the work of Construction of HL Bridge 04 Span, 20 meters, each over river Tangri x-ing road Syamtoo to Amrala
Hiring of Consultants - Milestone/Deliverable Based - Geotechnical Investigations for Construction for Permanent Campus at JNV in Assam for Navodaya Vidyalaya Samiti; As per Tender Document; Yes; Hybrid(As specified in scope of work)
Hiring of Consultants - Milestone/Deliverable Based - Appointment of REC Third Party Quality Monitoring Agencies for Revamped Distribution Sector Scheme; comprising of West Bengal Assam Arunachal Pradesh and Andaman Nicobar; No; Hybrid(As specified ..
Hiring of Consultants - Milestone/Deliverable Based - ESTABLISHMENT OF SURVEY CONTROL POINTS AND CARRYING OUT TOPOGRAPHIC SURVEY USING DRONE WITH LIDAR TECHNIQUE FOR AMBA PUMPED STORAGE PROJECT MAHARASHTRA; ESTABLISHMENT OF SURVEY CONTROL POINTS AND ..
Hiring of Consultants - Milestone/Deliverable Based - Manual Preparation Checking and Finalization of Data and IND AS Standalone Consolidated Financial Statements of NPCC Limited for period ending December 2024; As per tender; No; Onsite
Hiring of Consultants - Milestone/Deliverable Based - ESTABLISHMENT OF SURVEY CONTROL POINTS AND CARRYING OUT TOPOGRAPHIC SURVEY USING DRONE WITH LIDAR TECHNIQUE FOR KUMBHE PUMPED STORAGE PROJECT MAHARASHTRA; ESTABLISHMENT OF SURVEY CONTROL POINTS AN..
Hiring of Consultants - Milestone/Deliverable Based - Carrying out Geotechnical Investigations Subsurface for the for the Barrage Projects in Puducherry Region; Carrying out Geotechnical Investigations Subsurface for the for the Barrage Projects in P..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Transmission system for evacuation of power from Rajasthan REZ Ph IV Part3 6GW Bikaner complex Part B; Energy (Oil, Gas, Power, Renewables); No; Hybrid(As s..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Network Expansion scheme in Gujarat for drawl of about 3600 MW load under PhaseI in Jamnagar area; Energy (Oil, Gas, Power, Renewables); No; Hybrid(As speci..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Transmission system for evacuation of power from Rajasthan REZ Ph IV Part3 6GW Bikaner complex Part A; Energy (Oil, Gas, Power, Renewables); No; Hybrid(As s..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Transmission System for Evacuation of power from RE Projects in Rajgarh 1000MW SEZ in Madhya Pradesh Phase II; Energy (Oil, Gas, Power, Renewables); No; Hyb..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Augmentation of Transformation Capacity by 3x500 MVA 400/220 kV ICTs 6th to 8th and 1x1500 MVA, 765/400 kV ICT 4th at Bidar PS; Energy (Oil, Gas, Power, Ren..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Inter-Regional (NR-WR) Transmission System Strengthening to relieve the loading of 765 kV Vindhyachal-Varanasi D/c line; Energy (Oil, Gas, Power, Renewables..
Request for Proposal of Empanelment of Consultant with Municipal Corporation, Rohtak for the purpose of Architectural Planning, Surveying, Estimation, Designing of Infrastructures Development and Submission of Estimate and DPR, Deputing Site Engineer
Inviting Expressions of Interest for Appointment of Consultant Agency for Wildlife Division of Hissar Forest and Wildlife Department of Haryana for development of Plans and Detailed Project Report for various Conservation Entities
Selection of Consultant for preparing DPR, Design, Cost Estimates, Bid Process Management and Project Supervision Services etc. for construction of Multi-Storey Pre-Engineered Steel Structure Building for New Office Complex PMDA
Appointment of Safety Consultant for the Package Upgradation of Gurgaon-Pataudi-Rewari section of NH-352W (design length 46.110 km) as Feeder route in the state of Haryana on Hybrid Annuity Mode
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Transmission system for evacuation of power from Rajasthan REZ Ph IV Part 4 3500 MW Part A; Energy (Oil, Gas, Power, Renewables); No; Hybrid(As specified in..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Transmission system for evacuation of power from Rajasthan REZ Ph IV Part 4 3500 MW Part B; Energy (Oil, Gas, Power, Renewables); No; Hybrid(As specified in..
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Transmission system for evacuation of power from Rajasthan REZ Ph-V Part 1 (4 GW) Sirohi Nagaur Complex; Energy (Oil, Gas, Power, Renewables); No; Hybrid(A..
Consultancy Services for the Feasibility Study and Preparation of DPR for Construction of L - Shape RUB/LHS over L/C no. 60-B at Km 70/6-7 on Rohtak yard west end on Delhi Bhatinda railway line crossing Kacha Beri road in Rohtak Town.
Hiring of Consultants - Milestone/Deliverable Based - Appointment of REC Third Party Quality Monitoring Agencies for Revamped Distribution Sector Scheme; Package5 States comprising of Bihar Meghalaya Nagaland and Sikkim; No; Hybrid(As specified in s..
Hiring of Consultants - Milestone/Deliverable Based - Manual Preparation Checking and Finalization of Data and IND AS Standalone Consolidated Financial Statements of WAPCOS Limited for the period ended December 2024; As per tender document; No;..
Empanelment of Consultants with Directorate Urban Local Bodies, Haryana for the purpose of preparation of Detailed Project Report on Assessment of Road Safety and Audit of Major Road Network including CRN within Municipal Limits
Empanelment of Engineering Consultants for the preparation of BDEP, FEED, PMC and EPCM services for the Petrochemicals, Petroleum Pipelines, Bio-energy, Refining processes or technologies etc being developed by IndianOil-R and D Centre
Hiring of Consultants - Milestone/Deliverable Based - Selection of Agency for Conducting Detailed Topographic Survey of the project area by DGPS on LCS basis; As per NIT; No; Hybrid(As specified in scope of work)