Loading…
Loading…
1,117 live696 closing this weekmost from Rural Development and Panchayati Raj and PWD
1,117 results • Best match
Janpad Chandauli me Amdaha se Narkati hote hue Gahila baba marg ke Km 9 me 3 gude 3 gude 3 m span ka RCC Box Culvert avam Pahuch marg ke Nirman Karya
Construction of 4 x 4 mtr span 5 cell Box Culvert and Approach road in place of Rapta in KM 06 of Sherkot Harewali Road to Kopa Road ODR in District Bijnor
Construction of 3 x 3 mtr span 3 cell Box Culvert and Approach road in place of Rapta in KM 07 of Sherkot Harewali Road to Kopa Road (ODR) in District Bijnor
Re-Construction work of RCC box culvert of 3 x 3 m 3 span in place of damaged and narrow bridge at Km-10 of Gabhana Kalua Pohina Jawan (ODR) in Aligarh district
Repairs and Raising of the Causeway across the Vasista River at Pedalanka Village Limits of Elamanchili Mandal in West Godavari District.
Construction of a box culvert (with 5m x 6m x 6m spans), a diversion, and approach roads to replace the narrow culvert situated at the 2 km mark of the Anapur-Moharab-Khanshah ka Purwa-Shringverpur-Shri Ram Chaura-Mendara-Sitakund-Bhaira Ghat route.
Construction of a 3 X 5 X 4.5 meter span box culvert in place of the previously constructed damaged minor bridge on Kauasar drain at Km 1 of Mehdiganj Naugawan road in Kushinagar district
Construction work of 2 X 5 X 5 m Box Culvert and approach road over the drain near Maurya Basti, Yadav Basti and Junior High School on the Vibhannamau Road in Development Block-Jalalpur.
Construction work of 2x3x3 m span Box culvert and other safety work on Usrain Innadih Bharohiya Hudri Link Road (Ch- 1-100) in Distt Gorakhpur in FY 2026-27 Lot No 4 of 5
Construction work of 2x3x3 m span Box culvert and other safety work on Usrain Innadih Bharohiya Hudri Link Road (Ch- 1-350) in Distt Gorakhpur in FY 2026-27 Lot No 5 of 5
Construction of 3 Cell 6x3.00 Meter box culvert, protection works, approach road and additional approach road between Barua Banjar village and Barua Khurd village in Block Dadraul in Distt. Shahjahanpur. (Fin Year 2026-27)
Construction of a 5x5 3 cell box culvert at km 2 of the Ramkola Link road in Gorakhpur district under the State Plan for the financial year 2026-27 Lot No 1 of 1
Construction Work of WBM with Paving Block Road, Box Culvert, Pipe Culvert, Open Shed, LED Street Light and PVC Pipe Line as Per Various Location Chart. At, Gariyadhar Under Swarnim Jayanti Mukhya Mantri Saheri Vikash Yojana (UDP-88) Year-2024-25 and 2025-26 (Second Attempt)
Construction of Single Cell 3.0m x 3.0m RCC Box Culvert at 1.35 km of Samaspur Baghan Road replacing narrow of and damaged slab culvert under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Repair Maintanance of Causeway/Kharanja/Repair Due to HewyRain
Repair Maintanance of Causeway/Kharanja/Repair Due to HewyRain
Construction of a 3cell RCC box culvert each span 3x3 meters over the drain at chainage km 14.30 of the Chanda Dhopap Shahgarh Major District Road MDR in Sultanpur district replacing the previously constructed damaged bridge
Janpad Chandauli me Chandauli Chakia ke Km 2 se Negura Tiyara tak marg vaya Negura Masouni Gorari Bhatroul marg ke Km 1 me Kshatigrast Setu ke Sthan par 3x3x3 m RCC Box Culvert ka Nirman karya
Restoration of Rain Damages road from from Kulhan Bridge to Zara Singh House GP Bilaspur Km. 0/00 to 1/700 SH ROFD C/o 3.00mtr span RCC slab culvert along with wing wall at RD.0/535 2.00mtr span at RD 0/815 0/965 900mm dia Hume pipe culvert at RD
JANPAD BASTI ME L D CHARKAILA ROAD TO BHAGWANTPUR JITUWAPAR LINK ROAD KE KM-2 TO GANGAPUR GRAMSABHA KE MADYA KM-1 ME 5X5X5 METER SPAN KA RCC BOX CULVERT, PAHUCH ROAD ATRIKT PAHUCH MARG AWAM SURAKSHATMAK KARYA
Carrying out Slope Protection Works from Km 27.410 to Km 27.540 and other associated works including construction of approach road, box culvert etc. at Melli Yard in connection with construction of Sivok Rangpo new BG Railway Line Project
Constructing a Box Culvert at Pond water Out-let Gate, & Box Drain From Pond Out Let Gate to City Mall Shopping Mall, For Vyara Nagar Palika, Dist. Tapi (with 3 year maintnace grantee period ) under sjmmsvy 2026-27
Restoration of rain damages on link road Mundkhar to Mohra km 0/00 to 3/735 SH Laying of RCC Slab Culvert 3.00 mtr Span at RD 3/430 and C/o R/wall at RD 3/436 to 3/464.25 Under NDRF
Reconstruction of Samardahari Mohammadapur Causeway Link Road with 05 Year Maintenance
Work of box culvert of 3 X 4 X 5.50 meter span in place of the previously constructed damaged minor bridge on Baitiah Nala of Hasanganj Matiyar Tola link road at Km-2 of Kaptanganj Pakriyar road in Kushinagar district.
Construction of an RCC culvert (3m x 6m x 4m span) and approach road to replace the existing causeway at km 1 of the Kapari-Jorwat Road (Other District Road) via BP Marg.
Proposed temporary construction of hume pipe culvert at the Approach road diversion of Aranya Tourism Property in Alipurduar District during the financial year 2026-27.
shifting water supply distribution pipe lines at various drain / culvert crossings of damaged culverts near EO office beside Anantharao tiffin shop in Ward No 98 of GVMC
Construction of R.C.C. Bos Culvert Span 5x6.00 m Height 4.00 m to replace the existing causeway at Km-118 of the Sisaiya Dhaurahra Nighasan Palia Dhanaurghat Puranpur Road SH 101 in District Lakhimpur Kheri.
Construction of R/wall at RDs 1/025 to 1/040, 1/040 to 1/060 and C/o Hume Pipe Culvert at RD 1/062)
CONSTRUCTION WORK OF BOX CULVERT OF 5 X 5 X 5 METER SPAN ON THE ROAD FROM MEHENDAWAL KHALILABAD MARG (MDR-81E) KM 1 BHARVALIYA PANDEY VAYA VIKAS KHAND KARYALAY BAUDHARA BABA (PRACHIN SHIV MANDIR) ROAD KM 11 IN SANT KABIR NAGAR DISTRICT
Construction of Causeway on Banas River from Gogathala to Mau Road Distt. Rajsamand
Construction work of box culvert of 3 X 5 X3 meter span in place of the previously constructed damaged minor bridge on Somal Tal at Km-3 of Bhathi Buzurg road via Tola Ghurchhapra of Bhathi Buzurg from Pandey Rai Pitch Road in Kushinagar district
SURVEY Drilling and Sampling Geo Technical Investigation Design and Estimation For Various Structures Such as Proposed Checkdam Wier Rubber Dam/Barrage Box Culvert And Protection Work and Other Miseellaneous Work of Damanganaga Project Division No-1 for Emergency Work. in the Kaparada,Valsad Distriet(for1year
Construction of Anicut cum causeway at Banas river near Village Kanwarawas GP Kanwarawas PS Todaraisingh District Tonk and Construction of Anicut cum causeway near Village Sentiawas at Banas river Tehsil Todaraisingh District Tonk.
Improvements to culverts in Hosakerehalli Ward-112
Construction of Causeway on Banas River from Gogathala to Mau Road – Distt. Rajsamand
Construction of RCC Slab Culvert at Vijayalakshmi Nagar in Kallakurichi Municipality (Ward No. 19)
CONSTRUCTION OF DRAIN & BOX CULVERT FROM KRISHNA VATIKA AT W.N. 48 (2nd Call)
Construction of Rampwell nalwaniya, Maintenance of Guzzler Tirthankar trail and causeway Sevto ka bera Range Sadri
Construction of Vented Causeway at Km 7/2 of Chikkavaram to Purushottapatnam Road in Krishna District
Construction anicut, anicut cum causeway, CCT, DCCT and amrit sarover Work in MJSA- 2.2 Block Thanagazi
Repairs and construction of culverts in Chikkalasandra Ward-110
Repairs and construction of culverts in Kamakya Ward-109
Construction of RCC Slab Culvert and Drain at Raja Nagar in Kallakurichi Municipality (Ward No. 05)