Loading…
Loading…
898 results • Best match
STBR/SOPD-G/Hailakandi-01/3 (i) Improvement and upgradation of Road with Cover Drain and Culvert of Gangpar Dhumkar PMGSY Road to Tool Road Via Byelane-1 under MMPNA of SOPD(G) for the year 2025-26. (ii) Improvement and upgradation of Road starts fr
(i) Impt. of road with earth filling and Sand Gravelling from Bhuyanpara PWD Main Road via Namghar to Jugdan Boro House main road 1 Km with Culvert at Ch.700.00m under SOPD (BTC) for the year 2026-27 (ii) Impt. of road with earth filling and Sand Gra
1. Balisara Culvert to Public pond 2. Lathabori Bamun Gukhai Than to Lathabori Tiniali
1.Krisna Patar house to Balipathar tiniali with sand gravel and 1 no. RCC Culvert at Thekeraguri 2. Construction of CC Block Road from 4 lane to railway line with one ring culvert at Morakolong
Construction of ICBP road at Bengtol Kumguri village including RCC culverts in Chirang District under Article 275(I) of the Constitution of India during the year 2019-20
As per BOQ details
Improvement of various works under Guwahati Municipal Corporation
Dodhere FIS ( Renovation of existing Head work, construction of afflux bund, Guide bund, Improvement of existing Main canal, village road crossing culvert, cattle crossing culvert and outlet etc.) under SOPD (SCSP) for the year 2019-20 under Kokrajh
Construction of outlet drain along the railway track from proposed culvert of Homen Borgohain Road near LG tower to existing railway culvert at Narengi for flood mitigation of Guwahati city under SOPD(G) for the year 2022-23
Construction of road diverting the Level Crossing at Kayasthagram Singaria road with HP culverts (Ch.0.00M to 650.00M) under SOPD-G for the year 2017-18, Karimganj Rural Road Division.
Construction of 5 nos G plus 2 RCC watch tower including internal water supply sanitary installation and 6 nos HML with PTZ camera at GIN 514 GIN 515 GIN 515A and Plugging of GAP under Baily bridge at GIN 508 with pipe culvert and 3 row composite fencing near Nathanpur BOP AOR 131 Bn BSF
Resectioning of Canal system, Constn of RCC Culvert-1 unit, Constn of Cattle Cart crossing Culvert-1 Unit, Constn of Cattle crossing-5Nos, Ber Barrier-2 Nos, RCC precast Slab-5 Nos, PVC canal outlets-12 Nos, Strengthening of Afflux etc
Reconstruction of Flood damaged road of Bidyerdabri Chariali to Kathaltoli Bazar Road under SOPD (FDR) for the year 2019-20. (Reconstruction of H.P. Culvert No. 3/4 including E/W, GSB, WBM-III, ICBP at approaches of culvert with protection work).
Improvement of road with earth filling and sand gravelling Belguri to Nizwmguri including 1 No RCC culvert
Conversion of damaged culvert of Homen Borgohain road to RCC bridge for flood mitigation of Guwahati city.
Construction of 2 Nos. of RCC Box Cell Culverts at Athiabri Daoraigabnai FV Link Road, Total Cost 170.00 Lakh, Phase-I for Rs.65.00 lacs under BADP, 2019-20 of Kokrajhar District.
MMPNA/2023-24/228_Periodic Renewal of Silchar Hailakandi Road Construction of 1_4m _4m cross culvert at Ch.688.00m near CR Avenue and its approaches Das Colonyb Panchayat Road Construction of 2 two nos culvert at Ch.529.00m and at Ch.980.00m and i
Restoration of Culvert no. 2/3 at Sonajuli nath gaon Road under SDRF for the year 2021-22.
Construction of CC Block road with 2nos.ring culvert from Sarat patar house to Anaram Teron house at Mikirati
DPRD/BTC/SOPD/Udl-11/2024/07
DPRD/BTC/(15th FC)UT/V/Udl-16/2024/10
Improvement of Various works under Guwahati Municipal Corporation
MMPNA/2023-24/74_Periodic Renewal of MDR NH 15 at Gandhjuli to Belsiri Rly. Station Road ( Ch. From 1000.00m to 2930.00m), Repairing of Culvert No.2/2and 3/2 on Garmara to Gangapur Road (Ch.From 0.00 to 2500.00m), Culvert No.4/1 NH-15 Gejengaguri to
Construction of Culvert and Road on link road between Matikhad Basti and NH 38 of Margherita LAC (Length, 1.00 km)
Construction of Cross Culvert at B. Baruah Road near Reyaz Saloon for Mitigation of Flood for the year 2023-24.
Re-sectioning and cleaning of main canal from Bineswar Brahma Road (near Don Bosco School) towards Narabari upto culvert near Bodoland transport.
DPRD/BTC/(SOPD)Udl-06/2025/13
DPRD/BTC/6th ASFC/DF/V/Udl-03/2024/07
As 03 96 Construction of Rural Road from A NH 53 to Dolugram Khasia Punjee. B PWD Road to Pollarbond grant via Akshaya basti SC village, roads,Culverts and Minor Bridges including Routine Maintenance for 5 years under PMGSY Regular Phase VIII of
Improvement of Lachit Ghat (from Lachit Ghat to Alfresco Grand) by GSB, WBM, ICBP, Cross Culvert etc. under SOPD (G) for the year 2021-22
MAINT/SOPD-G/2025-26/79_1_Construction of 3 Cell 5.00m x 5.00m box cell culvert on Mandia Palhaji Road under SOPD_G for the year 2025_26
DPRD/BTC/(SOPD)Udl-04/2023/08
Improvement of Birina Path, Janakpur at Kahilipara with RCC load bearing drain, RCC cross culvert and Road works under SOPD(G) for the year 2023-24
Recovery and Restoration of Howly Chuba to Majarchuba by providing 8.00 M span culvert under NDRF(PDNA-2022) in Udalguri District for the year 2025-26
Improvement of Kachamari Ghat (From Kachomari Ghat to Sukleswar Temple) by GSB, WBM, ICBP, S.S. Railing, Cross Culvert etc. under SOPD (G) for the year 2021-22
1.Construction of road with RCC culvert from Laduras house to Sri Lanka Gaon 2.Construction of CC Block (Paver Block) road from PWD Road to smokhan
1.Construction of road from Kanphala road to Mela-ati Pathar 2.Construction of CC Block road from Kaliajari Tiniali to Bhatkhowabori culvert (pull) at Bhatkhowabori village
Construction of 2x5.0Mx5.0M Box Cell Culvert over Kuria Nallha at Barni Breach GP under Hailakandi District Territorial Road Division under SOPD-G for the year 2020-21.
DPRD/BTC/SOPD/Udl-144/2020/9
As per BOQ
Construction of Stone Masonry Guard wall, Brick Masonry wall, Approach Road, Cross Culvert and approach slab at Manik Choudhury Road under SOPD (G) for the year 2022-23
Prep of Br site at T Pt Balija Provn of Abutment on H oblique Bk and F oblique Bk, Op Tr 100.00 into 4.00 mtr with Interlocking tiles and kerb stones, Drainage, RCC Retaining wall, A Wire mesh boxes, B Wire mesh boxes, Hume pipe culverts
DPRD/BTC/(SOPD)Udl-07/2024/09
Improvement of road from Sri Sri Ram Thakur Mission, Gobindaji Gouriya Math and Kali Mandir to Nauka Mandir including RCC cover drain, RCC cross culvert etc. at Pandu. (RETENDER).
DPRD/BTC/SOPD/Udl-140/2020/8
Rajadabri Flow Irrigation Scheme (Construction of Spillway, Construction of Guide Bund, Afflux Bund, Imp. of Public Dong and Construction of Cattle crossing Culvert) under TSP for the year 2020-21
Improvement of Mahapurush Madhavdev Path (VIP Road), construction of a RCC cross culvert and approaches at Magzine Ch. 4350.00 M near Hindustan College under SOPD (G) for the year 2020-21