Loading…
Loading…
2,954 results • Best match
SH- Dismantling of 8.00 meter span culvert in Km 2/000
C/O H-pipe culvert, P/l wearing and tarring etc.
C/O 3.00 mtr span RCC culvert at Rd 0/180)
C/O 1.00 mtr span culvert at RD. 3/650) (PDNA)
Construction of Drainage with RCC Pipe plus chamber work from culvert to Promod Singh house in Village Radoh and Repair of road from Talab to Promod Singh house in Village Radoh G.P Sunet SH Construction of drainage with RCC Pipe U shape drain layi
Job 3 Construction of link road Sidhyana to Menon Abadi Lower Dehlan km. 0-0 to 0-700 Sub Head C.O 6 mtr. Span Culvert at RD 0-260, C.C. Pavement at RD 0-225 to 0-400, C.O Retaining wall and wire crates etc.
C/o link road from O.B.C basti Kotlu Brahmna to SC/ST Basti Kotlu Brahmna G.P. Kotlu Brahmna Tehsil Ghumarwin Distt.Bilaspur H.P. SH C/o R.C.C. H/pipe Culvert 900 mm dia at Rd 0/240 along with wing wall towards valley side over Nallah
Repair and Maintenance of bridge and culverts on various RD,s 23/825, 24/480,25/075,25/825,29/195,31/980,32/830,34/380 and 35/655
SH Deployment Hiring of JCB Excavator cum loader and tipper for removal of slips clearance of road side drain culverts etc. at various RDs
SH Const of Solid Causeway at RD 0085 to 0095 1585 to 1595 and 1650 to 1660 and Providing and Laying GSB WMM and Tarring Between km 0058 to 0085 and 0095 to 0205 Under MNP
C/O RCC H-pipe culvert, P/L soling wearing tarring etc.
SH Construction of 10 mtr span RCC culvert at RD 0/505.
Construction of 3.00 mtr. Span culvert at RD 1/100) (Under SCSP)
Providing 4.00 mtr span culvert at RD 0/195 alongwith wing walls
C/O CC pavement, R/wall andHume pipe culvert at various RD
C/O formation cutting,R/Wall ,B/wall RCC h-pipe culvert
SH C.O Hupe pipe culvert at RD 36.585 along with wing wall
C/o H/pipe culvert at Rd 1/400 and 1/480
C/O 900 mm Dia H/pipe culvert at RD 2/810
C/O 3.00 mtr. Span RCC slabl culvert at RD. 2/240
Providing 4.00 mtr span culvert at RD 6/390 alongwith wing walls
C/O 1.00 mtr span Culvert at RD. 11/740) (PDNA-2025)
C/O 6.00 meter span culvert slab dirt wall) MMSY (Balance work)
C/O Toe walls for 6.00mtrs span culvert at RD 16/735
SH R.O.F.D. C.O wire crate R.walls, C.O R.C.C. Hume pipe culverts at various RDs, Kutcha side drain and essential soling between Km. 0.000 to 1.475
formation cutting, R/wall, C.D. soling ,wearing ,Tarring ,Parapets, V-Shape drain and 2 Nos 10.00 mtr span RCC slab culverts ) Under Nabard RIDF-XXV).
Providing and laying Grade-I in Km.5/00 to 5/500 and C/o hume pipe culverts at Rd.5/355 and 5/730
Construction of road from culvert to House of Bhan Singh etc. in GP Fatehpur km 0.0 to 1.0 SH Construction of R.wall at RD 0.015 to 0.055 RHS, 0.135 to 0.215 RHS and E wall at RD 0.0 to 0.060 LHS under Mukhya Mantri Sadak yojna
Provn of 04 x toilets in 28/4 Camp, addition/alteration of road, culvert at depot entry gate, provn of hard standing at RiSEPTA, pathway at 9 CIB, Brick wall and re-fixing of rolling shutter in building No P-13 (Rice shed) at Mil Stn Yol
R/R Damages on link road to Jailand Km 0/00 to 1/500 C/o Protection wall of Up Stream of Culvert at RD 0/040 and B/wall at RD 0/05 to 0/020 and E/wall at RD 0/070 to 0/078
Construction of road from Kasial to Village Punal in GP Luthial Km 0.0 to 1.530 SH Construction of formation cutting, 900mm dia HP culvert at RD 0.227 and 0.407, U shape drain at RD 0.121 to 0.225 and cement concrete pavement at RD 0.121 to 0.250 Und
SH- Protection work of Existing culvert at km. 7/555 and 7/870.)
SH c/o 6.00 meter span culvert at RD. 1/000)under MNP
P/L 4.00 mtrs. Span culvert at Rd. 2/755 Under SCSP Head
C/O 4.00 Mtr span slab type culvert at RD 0/340 SCDP
C/o 6.00 mtr. span culvert at Rd 0/930 alongwith wing wall
C.o 900 mm dia RCC hum pipe culvert at Rd 2.165 and 2.465
C/o 10.00 mtrs. Span RCC slab type culvert at Rd. 0/750
Construction of 4.00 mttr. span RCC culvert at RD-7/070 under PDNA
C/O 10.37 mtr span RCC Slab type culvert at Rd 0/295
( SH C/O Extension home pipe culvert in km. 1/600) Under SCDP
C/o RCC Box Cell culvert at RD 186/660 to 186/670.
SPECIAL REPAIR TO APPROACH ROAD, HARDSTANDING, FOOTPATH AND CULVERT UNDER GE (KH) YOL
Improvement of Deficiency, Construction of 900 mm dia hume pipe culverts along with wing walls and Metalling and Tarring in km 5/665 to 8/800
SH Deployment Hiring of JCB Excavator cum loader for removal of slips, dressing of kacha roads surface berms and cleaning of road side drain culverts etc.)
Formation cutting at various Rds, C/o Hume pipe culverts at Rd 27/520, M/T work and V-Shape drain 27/520 TO 33/200).
Restoration of rain damages on NH-20A Km39/00 to91/00 (SH Extension of culvert atRD 64/125 channelized at Nallah portion andU-Shape drain with cover slab at RD 64/140to 64/440 (LHS) for the year 2019-20 in the State of HP under FDR(New).
Restoration of rain damages on Raja Ka Talab Gurial road km 0.0 to 3.200 SH Construction of Retaining wall at RD 2.550 to 2.580 2.670 to 2.700, U-shape drain at RD 0.225 to 0.268 0.810 to 0.890, 1.50 mtr span culvert at RD 2.702, Providing and lay
C/O hume pipe culverts, at RD. 0/155 with wing wall, 0/320 with wing wall, 0/374 with wing wall 0/482 with wing wall
SH- C/O 900mm dia Hume pipe culverts at RD 5/370 and B/Wall at RD 0/360 to 0/370, 5/375 to 5/380.