Loading…
Loading…
2,954 results • Best match
SH C/O HP Culvert at RD 0/040 CC drain providing and laying metalling and tarring in km 0/0 to 0/570
Balance work of 6.00 mtrs span RCC Culvert U/S and D/S, both side wing walls and earth filling at Rd 2/930
C/o retaining wall at RD 5/525 to 5/542 and extension of culvert at RD 5/740 to 5/750) Under PDNA
SH-Construction of Culvert at RD 1/030, U- shape drain between km 0/000 to 1/000 and Edge wall at various RDs
C/o 2.00 mtr span culvert at RD 0/425 C/o Edge Wall Cement Concrete Pavement from Km 0/00 to 0/425)
Construction of C.C Pavement road
Formation cutting work, C/O R/Walls, 1.00 mtr span RCC culvert, U-Shape drain, Parapets, mettaling and tarring and cement concrete pavement road etc
SH Drilling and lowering of 1 No bore well 70 meters deep at Baradha near culvert LHS of Baradha Nallah H O Gulab Chand Negi
F.C. in km. 0/0 to 0/500 and C/O 6.00 mtrs. span RCC slab type culvert at Rd. 0/035) Under OTMNP Head
C/O Toe Wall of HP culvert at RD 2/150 and C/O U-shape drain at RD 2/130 to 2/230) (PDNA)
Strengthening of Pavement Including Improvement of Road Safety Work Construction of Retaining Wall Breast Wall Thrie Beam Crash Barriers Road Side Drains Slab Culverts Solid Cause Way etc in Km 286 00 to 329 00 on NH05 in the State of HP
C/O PCC R/Walls at various Rds C/O RCC Hume Pipe Culverts at Rd 0/230 0/820 0/920 1/105 i/c both side wing walls P/L Kharanja Stone Soling at Rd 0/000 to 1/000
SH- Providing and Laying WBM grade-I,II and Metalling and Tarring in km 0/00 to 2/200, Construction of RCC Hume Pipe Culverts at various Rds and Construction of Road Side V-Shape drain in km 0/00 to 2/200
SH ROFD, C.O PCC R.wall and B.wall in wire crate, C.O PCC V.shape drain, C.O Hume pipe culverts, C.O PCC Parapets, P.L GSB, G.II, G.III, M.T works and five year maintenance for five after completion in Km. 0.000 to 3.450) under NABARD RIDF.XXVIII
SH Poviding and Laying WBM grade-I,II and Metalling andTarring in km 0/00 to 2/200, Construction of RCC Hume Pipe Culverts at various Rds and Construction of Road Side V-Shape drain in km 0/00 to 2/200
C/o link road to Village Khurjail Km. 1/750 (SH- C/o 900mm dia Humpe Pipe Culvert at RD 0/540 i/c wing wall)
Balance work of C/o 4.00 mtr span culvert C/o R/wall at Rd 0/390 to 0/394.80 and 0/398.70 to 0/412.50
C/O 900 mm Dia H/pipe culvert at RD 2/405 and C/O V-shape drain from 2/175 to 2/250) Under SCSP
C/O Both side approaches of 4.00 Mtr. Span culvert at RD 0/105 and C/O New road in Km 0/116 to 0/175
C/o 900mm dia HPC culvert at RD 0/090, 0/225 and 0/350, C/o C.C. Pavement from Km 0/00 to 0/350.
SH Providing and laying GSB Wet Mix Macadam and 25mm thick bitumenious concrete in km 0/0 to 0/500. P/L PCC 1 5 10 retaining wall and CC 1 3 6 V-Shape drain in km 0/0 to 0/500
C/O R/wall at RD 0/050 to 0/070,0/240 to 0/272,edge wall at RD0/0 to 0/032 Both side parapets at RD 0/0 to0/170, interlocking paver block at RD 0/0 to 0/032,0/050 to 0/070,0/075 to0/110,0/135 to 0/150 and causeway at RD 0/070 to 0/075.
Improvement of Streets 1 Bhagsunag Parking up to curve on Bhagsu Heine Road including two culverts 2 Chelian Mohalla Street Mr Vijay Kumar house to Mr Rajesh sharma house ward No 8 3 HPCA Stadium ITI road towards Mr SP Gupta and Mr Kultar Guleria
I Improvement of Hamirpur Jahu road km 2/690 to 16/225 SH Balance work for Improvement of curves extension of culverts construction of retaining wall side drains and improvement of riding quality in between km 8/0 to 11/0 ii Construction of Hami
C/O Cement concrete pavement at RD 2/200 to 2/250 and 4/490 to 4/560 and 1.00 Mtr span culvert at RD 3/990
SH Construction of ROFD at various RDs, C/O R/wall in various RDs and C/O 6.0 metres. Span RCC Slab type culvert Under SCSP Head
Periodic Maintenance of Earthern Shoulder, Drain , Culvert, Sign Board, 200 meter stone, Kilometer stone and White Washing of Parapets in Km RD 12/375 to 22/375
Periodic Maintenance of Earthern Shoulder, Drain , Culvert, Sign Board, 200 meter stone, Kilometer stone and White Washing of Parapets in Km RD 0/000 to 10/000
Periodic Maintenance of Earthern Shoulder, Drain, Culvert,Sign Board , 200 metre stone, Kilometer stone and White Washing of Parapets in km RD 12/375 to 22/375
C/O road from Koti to Kingal Old HT road Km.0/000 to 2/840 SH P/L Kharanja stone soling Km 1/125 to 2/540 PCC R/wall at Rd 0/305 to 0/320 0/550 to 0/560 0/750 to 0/765 1/220 to 1/235 1/495 to 1/510 and RCC HP culvert at RD1/245 and 1/435 i/c both si
C/o Abutments and R.C.C. Slab etc. in KM 0/0 to 0/150
Construction of 900mm dia Hume pipe RCC culvert with wing walls at RD 0/900, Providing and laying cement concrete pavement at RD 0/885 to 0/960
Providing and laying under slab flooring, protection of D/S toe wall and C/O wing wall D/S Bhoura side of existing culvert at RD. 1/495
/O Volleyball pitch, Basketwall ground, C/O R/Wall for flood protection work and approach road with 3 mtr. Span RCC culvert at RD 0/100) Sports Deposit
(SH- C/O R/Wall both side of culvert Up-Stream and Down Stream, filling road C.C. pavement etc. at RD 0/040 to 0/050(Deposit work)
Formation Cutting in km 0/765 to 1/750, C/o 2 mtr slab Culverts at RD 0/800,1/540 and 3mtr SC at RD 1/060,HPC at RD 1/315 and Providing and laying GSB and G-II in km 0/765 to 1/750
SH-Widening of 5/7 metres to 10/12 metre wide road in Km. 1/840 to 3/805, extension of existing culverts cross drainage work, metalling and tarring to double lane standard, side drains, C/O essential parapets and providing road furnitures etc. in K
(SH Formation Deficiencies,CD with slab culverts,P/L GSB,WBM Gr II Gr III, M/T works, road side V shape Drain,Essential Parapets,P/L sign Board and Km stone and wire crate structure etc) and 5 Year Maintenance after completion UNDER NABARD RIDF- XXVI
SH C/O R/Wall at RD 0/050 to 0/060 0/145 to 0/155 C/O causeway at RD 0/620 to 0/630 P/L GSB and WMM in Km 0/0 to 0/300 0/310 to 0/620 0/630 to 1/0 and P/L cement concrete pavement at RD 0/300 to 0/310 under OTMNP Head
SH Construction of approaches in Gulling Side Retaining wall in km 0.393 to 0.398.50 and 0.401.50 to 0.419.50 Downstream and 3.00 span RCC slab type culvert at km 0.399.00.
Formation cutting km 3/0 to 3/525 and culvert at RD 3/330 and providing and laying GSB , WMM and SDBC in km 3/0 to 3/525
6.00 mtrs. Span RCC slab type culvert at Rd. 0/510, P/L solid couse way at Rd. 0/840 to 0/870 and P/L GSB and WMM
C/O 900 mm Dia H/pipe culvert at RD 3/420 and U-shape drain at RD 3/200 to 3/350 and 3/420 to 3/560
C/o C/wall at RD 2/630 to 2/740 , C/o 900mm dia H.P. culvert at RD 2/250, 2/500, 2/750 and 3/050). (Industrial Corridor)
Construction of Retaining walls in both sides approaches of 6.00mtr. Span culvert from R.D.3/840 to 3/860 Kothi side and 3/898 to 3/965 Bartiyal side approach
SH- Formation deficiency, C/0 900 mm dia HP Culvert at Rd 0-265, 0-610 alongwith wing wall and V-shape drain at Rd 0-255 to 0-390
(SH-repair and maintance road C/O unlined surface of culvert and C/O sub grade and earthen shoulders from 0/0 to 6/0 0/0 to 1/0)
SH C/O ROFD and at 0/0 to 1/185 C/O B/Wall R/Wall and C/O 2.5 Mtr. Span Salab Type Culvert at RD. 0/570