Loading…
Loading…
6,931 results • Best match
Construction of road from Daba to Gali Ziarat,Makhuwala to Gali Zairat Loran,by way of Earth Work in Cutting,Walling Providing and Laying of 900 /600 mm dia Hume Pipe Culvert .
Construction of road from Daba to Gali Ziarat, Makhuwala to Gali Zairat Loran,by way of Earth Work in Cutting,Walling Providing and Laying of 900 /600 mm dia Hume Pipe Culvert
Upgradation of road from Kalaban to Parat via Therpur by way of Construction of Kacha Drain,Surface Dresing ,Providing and Laying of 900mm dia Hume Pipe Culvert 150mm thick WBM Gr-II.
Restoration of road by way of Sheep Farm to Birla Ghani by way of balance Earth Work in Cutting and Providing and Laying WBM Grade-II and 900mm dia Hume Pipe Culvert
Construction Upgradation of road from Kojra Bandichechian to Kamal Dheri via Jhambra by way of balance Earth Work in Cutting, Walling Providing and Laying of 900 /600 mm dia Hume Pipe Culvert
Restoration of road from Sialsui to Phalli by way of slip clearance/drain clearance, berm dressing, filling of ruts and providing and laying of 04 Nos. 0.90 m dia Hume pipe culvert.
Upgradation of road from Harni Nar to Kasyote Gali to Mohalla Ferozalla in Km 2nd by way of Providing and Laying of 900mm dia Hume Pipe Culvert and 150mm thick WBM Grade
Construction of road Mandi Phagla Km 6th to Kanal via Sayeed Muzaffar Hussain Shah by way of Balance Earth Work in Cutting ,Providing and Laying of 900mm 600mm dia Hume Pipe Culvert
CONSTRUCTION OF SINGLE CELL ONE NO RCC BOX CULVERT ACROSS AMBERPORA HARITAR ROAD RD 1360M
Construction of 1.0 Mtr span RCC slab culvert with approahes on road from Siya to Bakerwal Basti.
Construction of RCC Slab Culvert over Nallah ,Ward No 08,Near H/O Madan Lal of M.C.Poonch
Construction of road from Thanda to Nari Kalai ,Surankote in Km 1st RD 0 -1000 to Km 3rd RD 1000 by way of balance Earth Work in Cutting,Walling, X-Drainage,900mm dia Hume Pipe Culvert 8.0mtr Span RCC Culvert.
Construction of 2 Nos Hume Pipe Culvert, providing and laying RCC slab over existing U/C culvert and providing and laying WBM Grade II 7.5cm thick in single layer on road from link road Kinara Laroka to Sh. Chander ParkashMohalla.
Construction of road from Bhawani to Laroka by way of earth work in cutting/filling, 20 Nos 900 mm dia NP3 Hume Pipe culvert, 06 Nos 1.0 mtr span RCC culvert, 03 Nos 3.0 mtr span RCC culvert, 1 No 6.0 mtr span RCC culvert, R/wall, B/wall, Pucca Dra
Upgradation of road from High School Bachwali to Taranwali Panchyat Bachwali in Km 1st RD 0-500 by way of Providing and Laying WBM Grade-II and 900mm dia Hume Pipe Culvert,Surankote
Construction of road from Jhullas Behra to Tand Nar Potha by way of Providing and Laying of WBM Grade-II,600mm dia Hume Pipe Culvert and Construction of Protection Work in Km 4th
Construction of road from Bus Stand to Khad Store by Way of Earth work cutting , Cross Drainage Providing Laying 02 No 900 mm dia Hume Pipe Culvert in Km 1st RD 0-1000
Construction of Main road Kazi Mohra to Mohalla Chowana Near H/O Ch.Mohd Akram by way of Earth Work in Cutting and Walling and Providing and Laying 900 mm dia Hume Pipe Culvert
Construction of road from Kandi to Kotain via Naloi Thana by way of Balance Earth Work in Cutting,Protection Work and Providing and Lying 900 mm dia Hume Pipe Culvert,WBM Grade -II.
Construction of road Gali Pindi to Shahpur in Km 1st by way of balance Earth Work in Cutting and Providing and Laying 900mm dia Hume Pipe Culvert ,Block NSSB, Under District Plan BDC.
Construction of road from Narol to Paloon Razi Wala by way of balance Earth Work in Cutting Providing Laying 150mm thick WBM Gr- II and 900mm dia Hume Pipe Culvert in different location
Upgradation of Awan to Charoon road by Way of 900 mm diad Hume Pipe Culvert and Providing Laying WBM Gr-II and WBM Gr-III 75mm Each Layer in Km 1st Km 2nd
Upgradation of Sheindhara Link road to Bandi to Lub via Patuwala in Km 1st by way of Providing Laying WBM Gr- II ,900 mm dia Hume Pipe Culvert and Construction of Kacha Drain
Upgradation of road from Jarranwali Gali to Khindo Gali in Km 2nd RD 700 to Km 3rd1000 by way of Providing and Laying WBM Grade-II and 900/600mm dia Hume Pipe Culvert
Construction of road from Main road to Mohalla Paswala via H/O Mohd Sadeq by way of Earth Work in Cutting ,Walling Providing and Laying of 900 /600 mm dia Hume Pipe Culvert .
Upgradation of road from Bhatakass to Mohalla Gujjran Topa in Km 1st Km 2nd by way of balance Earth Work in Cutting and Providing Laying 900mm dia Hume Pipe Culvert in different location
Construction of road from main road to Master Dharam Singh Mohalla Sialsui by way of earth work, 02 Nos 600 mm dia NP3 Hume Pipe culvert, walling and providing/laying 150mm thick WBM
Construction of road from Gourwali Bni to Mohalla Khokara by Way of Earth work cutting , Cross Drainage Providing Laying 02 No 900 mm dia Hume Pipe Culvert in Km 1st RD 0-1000 .
Construction of road from Main road Qasba Mandhar to Mohalla Sokar in Km 1st by way of Earth Work in Cutting, Walling Providing and Laying of 900 /600 mm dia Hume Pipe Culvert .
Construction of road from Mohalla Pathana to BSF Chowki Hill Mohalla Deena, Mandi by way of balance Earth Work in Cutting, Walling Providing and Laying of 900 /600 mm dia Hume Pipe Culvert
Construction of road MS Noonnabandi to Danna in Km 1st and Km 2nd by way of balance Earth Work in Cutting,Walling Providing and Laying of 900 /600 mm dia Hume Pipe Culvert
Construction of hume pipe Culvert at Maneh Mohalla Jeevan Singh w no 6, Pyt Kathar Upper, Block Dansal, under component PRI GRANTS District Capex Budget for the year of 2023-24 (Pyt Level)
Construction of Main road Gundi to Mohalla Chowana by way of Earth Work in Cutting and Walling and Providing and Laying 900 mm dia Hume Pipe Culvert and 150mm thick WBM Grade-II .
Construction of Main road Gundi to Mohalla Chowana by way of Earth Work in Cutting and Walling and Providing and Laying 900 mm dia Hume Pipe Culvert and 150mm thick WBM Grade-II
Construction of road from Rajal Hanjana to Baba Nar Singh Ji road alongwith other links by way of earth work in cutting/filling, construction of 27 Nos 0.90m dia Hume Pipe Culvert, 03 Nos 1.0m span RCC culvert, 02 Nos 2.0m span RCC culvert, 01 No 6.0
Construction of 4.0mt span RCC Box culvert on J.A road Km 3rd near Sabzi Mandi Janipur
Please Refer BOQ
Construction of 6 mtr span RCC slab culvert on Kharak Panhar road in km 6th RD 350-400
Construction of 6 Mtr span RCC slab culvert alongwith approach road at Mungral Gala Ward No 02 Kalsian
Construction of road from Saral Khaiwala to Shahpur by way of Earth Work in Cutting in Km 4th RD0-1000 Providing and Laying of 900mm dia Hume Pipe Culvert in Km 1st and 2nd.
Construction of road Indiagate to Mohalla Passwala High School Qasba in Km 1st by way of Earth Work in Cutting and Walling and Providing and Laying 900 mm dia Hume Pipe Culvert ,Block NSSB
Upgradation of road from PMGSY to Zairat Khorian Via Mohalla Awana Sanai in Km 1st by way of Providing Laying WBM Gr- II ,900 mm dia Hume Pipe Culvert and Construction of Kacha Drain
Construction of 01 No. 0.90 M Hume Pipe Culvert,Pucca Drain and R/wall by way of providing and laying WMM, BM and 25mm thick OGPC on road from Patrari to Domel via Thangiote.
Construction of road from Chhatral to Banola Pathanatir in Km 1st,Mendhar,Poonch by way of Earth Work in Cutting ,Providing and Laying of 900 mm dia Hume Pipe Culvert and WBM Grade-II .
Construction of road from Tarkhara to Mohalla Barwal Basooni Dharana by way of Earth Work in Cutting and Providing and Laying WBM Grade-II,WBM Grade-III and 900/600mm dia Hume Pipe Culvert
Construction of road from Chura Gali to Shastar Near Ziyarat Sharief in Km 1st RD 0-1000 by way of Earth Work in Cutting and Providing and Laying of 900mm dia Hume Pipe Culvert.
Balance work for the construction of link road from Mohalla Kalas by way of providing and laying of Hume pipe culvert and Breast wall in Km 2nd RD 0 to 1000 under District plan
Upgradation/Construction of road from Dabri Ban to Sheran Wala Mohra ,Mendhar by way of balance Earth Work in Cutting,Walling , Providing and Laying of 900mm dia Hume Pipe Culvert and WBM Grade-II
Construction of road from Jaba Bhera Extension to Dachan Bramana by Way of Earth work cutting , Protectaion Work and Providing Laying 03No 900 mm dia Hume Pipe Culvert at Different location l -0.500 Kms
Upgradation of Charallan to Sangla via Dandidhara road in Km 3rd and Km 4th road by way of Providing Laying WBM Gr- II ,900 mm dia Hume Pipe Culvert and Construction of Kacha Drain