Loading…
Loading…
6,936 results • Best match
Construction of road from Tundla to Kothian by way 01 Nos 900mm dia hume pipe culvert in Km 2nd RD 900 925 providing and laying 150mm thick WBM Gr II Shingling in two layers
Restoration of road from Solki to Bela, Kharak to Panhar, Keri Chabber road by way of slip clearance/drain clarance, berm dressing filling of ruts and 06 Nos. 0.90 M dia Hume Pipe culvert.
Reconstruction of Damaged Hume Pipe Culvert , Edge Walling , Catch pits and Drain on SEKLOO TO Saloonia In km 6th Rd 700-800 Instreches And km 6th to 9th Streches FOR THE Year 2022-23
Constt.of D channel moh.Subash Chander w.no.4 and Constt.of Hume pipe culvert at mohalla Ganesh Dass w.no.4,Pyt. Ambaran Block Akhnoor under PRI Grant Distt.Capex Budget, for the year 2026-27(Pyt Level)
Upgradation of road from M.S.Ajote Dherrian Community Hall road at Ajote Dherrian and C-Chunga road by way of Construction of Walling,B/Wall ,Providing and Laying of 900mm dia Hume Pipe Culvert, 3.0 Mtr Span RCC Culvert in different location ,Providi
Construction of road from Patrari to Dandesar by way of earth work in cutting/filling, 20 Nos 900 mm dia NP3 Hume Pipe culvert, 06 Nos 1.0 mtr span RCC culvert, 03 Nos 3.0 mtr span RCC culvert, R/wall, B/wall, Pucca Drain, Providing and laying 15cm
Restoration of Buffliaz Phagla road Buffliaz Side in Km 13th RD 0-325 in Stretches by way of Construction of Crated R/Wall,Kacha Drain and Providing and Laying of 900mm dia Hume Pipe Culvert
Construction/ Upgradation of Road at Chatron Pyt. Gadyog by way of earth work in cutting /filling, Construction of R/B/ Created Wall, providing and Laying of GSB, Providing and laying 02 No Hume Pipe Culvert
Construction Upgradation of road from Sheindra Old Bus Stand to Chamber Ward No 05 and 06 Panchyat Lower Sheindra by way of Providing and Laying WBM Grade-II and 900mm dia Hume Pipe Culvert,Surankote
Construction of road Akber Khan Main road Jamia Masjid Dhakki via Chaini Mangaan Peer Sakhi Sarwar ,Mendhar by of Walling and Providing and Laying of WBM Grade-II and 900 mm dia Hume Pipe Culvert
Construction of road Mohalla Khawaja to Naka Qasba via M/S Margimar in Km 1st and 2nd ,Mandi by way of Earth Work in Cutting,Providing and Laying 900mm dia Hume Pipe Culvert ,Block NSSB
Upgradation of PMGSY Pathanater to PMGSY Saruthi via Jabri by Way of 900 mm diad Hume Pipe Culvert and Providing Laying 150mm thick WBM Gr-II in Km 1st RD 0 Km 2nd RD 500
Upgradation of road from Airfield to Mohalla Jogian Mendhar by way of balance Earth Work in Cutting , Providing and laying of 900mm dia Hume Pipe Culvert in different location 150 mm thick WBM Gr-II.
Construction of road from Salwa to Masooriwala via Margan Sarwan in Km 1st and Km 2nd,Mendhar by way of Earth Work in Cutting and Providing and Laying of 900 mm dia Hume Pipe Culvert.
construction of road from Kotan Sadwala to Sal Maskeen Via Mohalla Lambardara by way of Earth Work in in Cutting ,Protection Work and Providing and Lying 900 mm dia Hume Pipe Culvert,WBM Grade -II.
Construction of link road Motorable bridge Kulani to Upper Khenu Mohalla Chandain via Lower Khenu Near Masjid by way of Earth Work in Cutting ,Walling and Providing and Laying 600/900mm dia Hume Pipe Culvert
Construction of Link road from Munday Bandi Morh to Kirni via centre Qasba by way of R/Wall ,B/Wall,Catch Pit of Hume Pipe Culvert ,Parpet in Km 1st and 2nd at Different Location
Restoration of road from Gura to Nimma in Km 4th RD 500 to Km 6th RD 1000 by way of Drain Clearance and Providing and Laying of 900mm dia Hume Pipe Culvert ,WBM Grade-II .
Construction of road from Main road Chandak Mandi to Timbra Danna Doyian ,Mandi in Km 1st by way of Earth Work in Cutting,R/Wall Providing and Laying of 900 mm dia Hume Pipe Culvert
Construction of 2.0 mtr Span RCC Box culvert at Mohalla Brahmana Road Near Shiv Mandir Khanpur Nagrota
Construction of balance work of triple cell RCC box culvert in KM 3rd of Amerpora-Haritar road
Construction of link road from Korara to cherote By way of construction of 1000 mm Hume Pipe culvert 4 5 Mtr height R wall 3 00 Mtr height R/wall, 1.5 Mtr height Edge wall, 2.5 Mtr height semi pucca B/wall and Drain Under State Sector
Please Read BOQ
Providing/laying WBM Grade-II, 150mm thick in two layers, 75mm thick each, 75mm thick WMM and providing/laying 600 MM dia Hume Pipe culvert at main road to Raja Mandlik Mandi Kalsian Ward No. 06
Upgradation of road from Goursai More to Gallian Goursain in Km 5th RD 0-600 by way of Earth Work in Cutting ,Providing and Laying of 900 mm dia Hume Pipe Culvert and WBM Grade-II.
Upgradation of road from Ghani to Mohalla Jattan Km 3rd RD 0 to 1000 by way of Providing and Laying WBM Gr-II and Providing and Laying of 900mm dia Hume Pipe Culvert at Different Location
Construction of link road Motorable bridge Kulani to Upper Khenu Mohalla Chandain via Lower Khenu Near Masjid by way of Walling and Providing and Laying 900mm dia Hume Pipe Culvert and 75mm thick WBM Grade-II
Balance work for construction of road from Lamberi to Chaprar via Dum by way of walling, drain, 12 Nos Hume Pipe culvert and WMM, Bituminous Macadam and 25mm thick OGPC in km 4th to km 5th
Upgradation of road Saloonia to Gali Km 10th by way of Construction of R/Wall,B/Wall,Drain and Providing and Laying of 900mm dia Hume Pipe Culvert different Location and WBM Grade-II ,Saloonia A
Construction of road from Dandesar to Shiv Chowki by way of WBM Grade II 15cm thick in two layers 7.5 cm thick each in km 1st, pucca drain, walling and 0.90 M dia Hume Pipe Culvert.
Upgradation of Salwah to Therpur Upper road by way of balance Earth Work in Cutting and Providing and Laying of WBM Grade-II in Km 2nd and Km 3rd and 900/600mm dia Hume Pipe Culvert.
Balance work for construction of road from Lamberi to Chaprar via Dum by way of walling, drain, 12 Nos Hume Pipe culvert and WMM, Bituminous Macadam and 25mm thick OGPC in km 4th to km 5th
Construction of Link road from MLA road end Point Gagrian to Central Gagrian via Jamia Masjid Gagrian by way of Earth Work in Cutting, Walling Providing and Laying of 900 /600 mm dia Hume Pipe Culvert
Construction of road from Chura gali to Shastar zaiyrat, by way of balance Earth Work in Cutting, and P/L 900mm/600 mm dia Hume Pipe Culvert in different location ,150 mm thick WBM Gr-II.
Upgradation of road from Hundi to Chaki More , Chaki More to High School Chaki More Jaba by way of Providing and Laying of 900mm dia Hume Pipe Culvert,WBM Gr-II WBM Grade-III , Pyt. Bachianwali
Upgradation of road from Hundi to Chaki More , Chaki More to High School Chaki More Jaba by way of Providing and Laying of 900mm dia Hume Pipe Culvert,WBM Gr-II WBM Grade-III , Pyt. Bachianwali
Permanent Restoration of Janipur Ambgrota road by way of construction of box culvert and drain Under UT CAPEX
Construction of 2.0 M span RCC slab Culvert on road from Qila Darhal to Kampla in km 5th RD 650
Construction of 3.0m Span RCC Slab Culvert near House of Mohd. Qasim by way of Retaining wall in km 5th
Re-construction of damaged walling and abutment of RCC slab culvert on Rajal Garan road in km 3rd and 4th.
Construction of 3 M span RCC slab culvert on road from Seri to Thuri in km 2nd Rd 400 500.
Construction of 2.0 Mtr span RCC slab culvert with approaches on road from main road Gagrote to Tallian Da Mohra..
Construction of 2.0 Mtr span RCC slab culvert with approaches on road from main road Gagrote to Tallian Da Mohra.
Balance Work for constrution of 3.0 mtr Span RCC Slab Culvert Near House of Mohd Qasim on Darhal Kampla Road .
Upgradation of link road from Village Basooni to Post 9 in Km 1st and Km 2nd by way of balance Providing Laying WBM Gr- II,WBM Gr-III and 900mm dia Hume Pipe Culvert in different location.
Construction of road from main road to Mohalla Dullian Dhakki Km 1st RD 0-500 by way of balance Earth Work and Providing and Laying of WBM Gr-II and 900 mm dia Hume Pipe Culvert,Mendhar
Completation of balance Work of road Faqir Din to Kassalian via Churan Gali by way of Construction of Earth Work Cutting Pucca Drain,R/Wall B/Wall and 900 mm dia Hume Pipe Culvert at Different Loction
Construction of road from Gulpur Karmara road to M/S Dehri Khari from Km 2nd , by way of Earth Work in Cutting,R/Wall,B/Wall,Pucca Drain and 900mm dia Hume Pipe Culvert in different location
Construction of road from House of Lamberdar Mohinder Singh to House of Tilak Raj Manpur Ward No 05 by way of earth work in cutting filling 02 Nos 900mm dia hume pipe culvert walling and pucca drain
Upgradation of Uchad to Kasblari road Km 1st to Km 3rd, by way of Providing and Laying of 900mm dia Hume Pipe Culvert,WBM Gr-III ,50mm thick BM 25mm thick OGPC including 6mm thick seal Coat .