Loading…
Loading…
6,983 results • Best match
Construction of Foot Path from Culvert to H/o Zubair Ah Khatana near Gujjar Basti Akhal B. Block Kangan PRI 703
Construction of Damaged Culvert on Directoutlet 62000 at Rd 1900M and T-Xing on 65900 at RD 150M of Main NPC.
Construction of RCC Pipe Culvert, approach and other allied works on Bobsipora side for the construction of Watalbagh bridge at Ganderbal.
Construction of Culvert at Bain Pyt Glar Block Samba District Samba under Scheme Capex Budget DDC for the Year 2020-21
CONSTRUCTION OF CULVERT NEAR JAMIA MASJID SHAREEF HARDABOORA A . PYTT HALQA ,- HARDABOORA A BLOCK HARDABOORA SCHEME,- ADP (BDC) FY,- 2026-27
REPAIR/ REPLACEMENT OF ROAD/ PATH/ CULVERT IN ZONE II OF THE AOR OF AGE B/R II UNDER GE (SOUTH) UDHAMPUR
Permanent restoration by way of Contruction of RCC Culvert near shamshan Ghat sainth. Under Permanent Restoration (FY 2026-27) (Ist Call)
Construction of 2 No 3 Meter culvert at Chinar Chowk Shangus and kharmohalla middle School Including Drain behind the SDH Shangus
C/o Culvert on Bandy road near Pyt Ghar Kachwa Muqam pyt halqa kachwa muqam b block wagoora under adp pri
c/o irrigation khul along with cover slab from masjid Shareef putpora to culvert link road babapora (ward 7) Babapora Hyhama
Const of Culvert and lane moh Choudhary Pyt kaink Jagir Block Akhnoor under PRI Capex Budget for the year 2026-27
Repair of Culvert near H/O Ab Majeed Rather at Power Canal Gujjer Basti URPASH Block Ganderbal PRI 121 2nd Call
Construction of Culvert on New Road along with P Wall near House of Nazir Ahmad Lone Panchayat Shahpora Payeen Block Gurez
Const. of Culvert at Main Market/Drain Slab ward no. 01 Pyt Jerri Block PouniDistt. Reasi under PRI Capex 2026-27
RDDDC2627104321 -(IMPROVEMENT OF LANE ROAD WITH CULVERT FROM HOUSE OF BASHIR AHMAD SHAH TO HOUSE OF MOHD AKRAM AT PACHAR (SHADIM))
Const. of Pully Culvert near agriculture office village Rattian.Pyt. Tanda,Block Miran Sahib ,Year 2026-27 under PRI Capex (Block Level)
GE/BAS-44/2026-27 Repair to wall, fencing, drain, path, culvert, gate etc at Madhopur Mil station under GE Basoli
GE/BAS-30/2026-27 Repair to wall, fencing, drain, path, culvert, gate etc at Basoli Mil station under GE Basoli
Development of Berm at Badipora Sogam road at Astan Mohalla incl. Construction of Box type culvert and toe wall at Badipora.
C/O CULVERT ON BANDY ROAD NEAR PYT GHAR KACHWA MUQAM PYT HALQA KACHWA MUQAM B BLOCK WAGOORA UNDER ADP PRI
Construction of culvert near the HO M Ramzan Ahanger Ahanger mohalla Botingoo B Under CDF FOR THE 2026-27 Block -Zaingeer
Improvement of channel section of D6 RD 50 to 400M and RD 5200 to 5400M and Const of 2 no. culverts at RD 250 to 1600M near Vishwa Bharti School under UT Capex Budget 2025-26
Construction of road from Patta Thana to Simbli Gali by way of R wall and crated wall , pacca drain n Providing and laying 01 no 1 mtr dia HP culverts Km 5th Rd 400 to 700
Desilting of Hakkal khul market area satwari khul of Distributary No.9A between RD 0 to 3200m near Military Farm Raipur and covered channel position RD 975M D/S trash racks and under culverts at palces
Construction of 8 No. RCC Culverts for CROSS Drainage Road No. F18, F19, R1, R2, L3, L4 AND Main spine road (phase - II) on backside of Dabur India Ltd. at Industrial Complex Bari Brahmana. (2nd Call)
C/O 5 NO. CULVERTS NEAR H/O SHOWKAT AHMAD GANIE, GHULAM MOHD GANIE, IRFAN AHMAD WANI, FAROOQ AHMAD GANIE AND MOHD SABIR AT AMARGRAH PYT HALQA, AMARGRAH UNDER ADP(PRI) YEAR 2026-27 BLOCK, SANGRAMA
Construction of road from Kandi to Kesari Hill by way of earth work in cutting/filling construction of 12 Nos 1.00 Mtr dia H.P Culvert,02 No RCC culvert. R/B Wall, Pacca Drain, providing and laying , GSB, WBM Gr-II , 150 mm thick in two layers (75mm
Construction of road from main road Tandwal Shiv Mandir to Radha Krishan Mandir n extension upto Bakerwal Basti by way of earth work in cutting fling construction of 11 nos 1 mtr dia HP culvert 01 no 3 mtr span RCC culvert and construction of R B wa
Balance work for const. of left side approach of Ujhan Bridge by way of earth filling, clearance of slips, const of B wall, const. of 04 Nos. 1 Mtr dia H.P culvert, 01 No. 2 Mtr span RCC culvert, crated wall , Providing and laying WBM Gr -II in on
Constt of Culvert near the house of Hukam Chand OBC Mohalla Bhabnoo Pyt. Uchapind and Constt of Culvert with T/Road from PWD Road to Rachana and others Pyt. Mukwal and Constt of P/work PWD Road near Bansi Lal House Khorga Pyt. Tharakalwal A and P/Wor
Construction of link road from Gambhir Mughlan More to Chanja Mohalla by way of Earth work in cutting filling 03 Nos 1 00 Mtr dia Hp Culvert 01 Nos 0 60 Mtr dia H P Culvert and construction of walling in km 1st RD 0 500 3rd call
Balance work of Mandagali Koyli road from Km 4th onward by way of Earth work in cutting/filling, providing and laying 10 No 1.00 Mtr dia HPC, 04 No 0.60 Mtr dia RCC H.P Culvert,Construction of 02 Nos 3.00 Mtr RCC Culvert,Construction of R/B wall
Construction of R.Wall on U.S Right side of Culvert near the H O Mr. Ghulam Rasool Akhoon and Imtiyaz Ahmad Dar and other L_30.00 M) and on D.S Both sides of Culvert near the H/o Manzoor Ahmad Wani and others L_32 mtrs B.S of Astan Nallah at Pahloo
Construction of road from Hayatpura to Suka Kass Mohra Kamrian by way of earth work in cutting filling construction of 02 nos 1 00 mtr dia HPC culvert 01 nos 3 00 mtr span RCC culvert R B wall crated wall Pacca drain Providing and laying WBM GR
Construction of culvert over Dhobi Canal (Grata Khul) B/O Dab Canal near the H/O Hilal Ahmad Sofi S/O Ali Mohd Sofi at Khranihama, Construction of culvert on Satwatoo B/O Maryab Canal at RD 145 Mtrs. D/S and Crate protection... (see more on NIT)
Construction of road from Patta Chui Bowli via middle School Patta to peer Mohala Godhar by way of earth work in cutting fling construction of 10 nos 1 00 mtr dia HP culvert, 01 no 3.00 mtr span RCC culvert and construction of R B wall,GSB Providing
Construction of road from Gurdan Bala to Kanyal via Pattian by way of earth work in cutting/filling construction of 09 nos 1.00 mtr dia HP culvert,01 No 3.00 mtr span RCC culvert and construction of R/B wall, Providing and laying WBM GR-II in two la
Construction of road from Shahdra Sharief road to Ajah via Bandian by way of earth work in cutting filling, construction of 10nos 1.00 mtr dia HP culvert, 01 no 3.00 mtr span RCC culvert R B walls crated wall, pacca drain, P laying 150 mm thick GSB,1
Construction of road from Mian Nagri to Malash Mohalla by way of earth work in cutting filling construction of 1 no 3 mtr span RCC culvert 04 nos 1 00 mtr dia HP culvert pucca drain construction of R B wall Providing and laying WBM GRII in two layer
Balance work for const.of left side appraoch of Ujhan Bridge by way of earth filling const of B wall, const. of 04 Nos. 1 Mtr dia H.P culvert, 01 No. 2 Mtr span RCC culvert, crated wall , Providing and laying WBM Gr -II in one layer, WMM and 25m
Construction of road from main road to Ziarat Meeran Shah via Gorkha Gali by way of earth work in cutting/filling construction of 05 Nos 1.00 Mtr dia H.P Culvert, 1.00 No 6.0 Mtr Span RCC Culvert, R/B R/B Wall, Pacca Drain, providing and laying 150m
Construction of road from Tak Point to Ponthal by way of earth work in cutting/filling construction of 16 Nos 1.00 Mtr dia H.P Culvert, 2.00 No 3.0 Mtr Span RCC Culvert, R/B Wall, Pacca Drain, providing and laying 150mm thick GSB, WBM Gr-II , 150mm t
Construction of road from Bali Ma to Kotli by way of earth work in cutting/filling construction of 12 Nos 1.00 Mtr dia H.P Culvert, 02 Nos 3.00 Mtr span RCC Culvert R/B Wall, Pacca Drain, providing and laying 150mm thick GSB, WBM Gr-II , 150mm thick
Construction of road from Hayatpura to Sukakass to Kamarian by way of Providing and laying 06 nos 1.00 mtr dia H.P culvert 02 nos 0.60 mtr dia H.P culvert , clearance of slips drain Providing and laying WBM GR-II 75 mm thick single layer in km 1st R
Construction of road from Main road Godhar khalsa to SC Mohalla upto H/O Chander Prakash by way of Earth work in Cutting and Filling, Const. of B/wall, R/wall, Pacca drain, 01 no. 3.0mt. span RCC culvert, 05 no. 0.90mt. dia. HP culvert, P/L 150mm t
Constt.of Lane/small culvert at Langth Moh. Baldev Raj Pandit Pyt Badheri Block Samba under the scheme Capex Budget PRI for the Year2024-25
C/O culvert at khui kul traran Pyt. Halqa Traran Block Tangmarg under ADP pri for the year 2026-27Actt Head ADP DDC
REPAIR TO DRAIN CULVERT FOOTPATH HARDSTANDING SECURITY WALL COMPOUND WALL AND CONNECTED SERVICES ZONE I AREA UNDER GE SAMBA
PLEASE REFER TO ENIT