Loading…
Loading…
1,494 results • Best match
Preparation of Garland Drain along Mine Boundary 1000 Mtrs Cleaning of Existing Drain 4250 Mtrs of Rohini Mines and Provision of 03 Nos. culvert with Hume Pipe in 3 different places of Mines area of Rohini Project under Rohini Project NK Area
Construction of drain in (1)aman society kabristan gate to ajmerdarbari to sagar khan house, shamma marriage hall to culvert (2)Insha colony gajal khan house to shree thakur house to umananth tiwari house and chandani BLO house to shahid ahmad house
Extension (Lying and Joining) of delivery range of 2000 GPM Pump installed at B-Patch its discharge point at 09 No.siding railway line culvert and matching to existing pipe line at Madhuban Filter plant the distance B/W discharge point to existing p
Construction of Culvert 2mX1.4m in Garja Road to Kashidohar, Block-Thethaitangar.
Construction Of PCC Road From Raju Bhuiya House To Manoj Bhuiya House Via Manoj Vaid House And Construction Of Drain From Raju House To Front Of Manoj House Via Main Culvert In Kankani Hanuman Bazar in Ward No 07 Under DMC, Dhanbad. (3rd Call)
Construction of RCC Drain in Gandhi Nagar from ravi Chahar house to main nala via Ram Balak Ray house,Sadhu Mandal house,Tinku Soni house,rahul house and in gandhi road jha colony entry culvert to sandeep Kumar via Sewa Medical Anil house to mai
Const PCC Road over 120M ghordhamba PWD road to Sai hotel tak GP Dumardiha Dhanawar Cons of PCC Road over 250M madhokala house of Ashok turi to maszid mod GP Galwati Dhanawar and Cons One Span Culvert Behind at GP Parsan Dhanwar Dist Giridih Gr09
Cons of Road Drain and Culvert (A) From NH33 to Khatal and Vipul Ji House in Getlatu (B) East Side of Ring Road, Simaliya to RNC Body Builders (C) RadhaMohan Colony, West of Ring Road, Daladili (D) Karnipuram Chowk Ring Road to Daldili Bagicha Toli
Construction of RCC Culvert in Bastacola near master saheb house and RCC Drain in Bastacola shiv mandir and bastacola 7 no. (1) from Suresh paswan house to Sashi paswan house via master saheb house (2) Raju handi house to binod paswan house (3) Chand
REP REPLACEMENT CLEANING OF WORNOUT SEWAGE LINE, MANHOLE INCL CLEANING OF SEPTIC TANKS AND CLEANING OF OVER HEAD WATER TANKS AT TEMPLE LANE, STN HQ, MH MDC SHO, MES, ASC, ASRI AND DAD REP MAINTENANCE TO DRAIN, CULVERT AND MISC WORK AT RAMGARH CANT
Construction of RCC Drain from (1) Shiva House via Rajesh Mandal to Jodiya house Khapra Dhowra Club to Main Culvert (2) From Ramesh Bhuiya house to Kallu Prajapati House and Putul Bhuiya (3) From Upendra Paswan house to Nakul Rajak..in ward no. 47
Construction of Drain in Duhatand Adivasi Tola Near Gas Godam Prakash Tudu house to Culvert via Banti Shop, Sikandar Rawani house and Duhatand Park to Dr. Saheb house and Chauhan Basti Manoj Chauhan to Main Drain and Link Gali In Ward No 30 Under D
construction of pavers block road from Culvert beside Tata showroom to Munna main road to Suraj main road to Chamru and road from imli tree to Jogia and Bicky via Sunil Jha to Punam And Lakshmi in ward no 28 under Nagar Parishad Sahibganj
Diversion/relocation of two (02) nos. of poles in 3.3kV feeder near Weighbridge no. 8 of Karo OCP in view of providing free space for the construction of Silo of Karo CHP (07 MTPA) and replacement of damaged cable near railway culvert in 3.3KV feeder
Construction of RCC Drain form 1 Biju Singh House to Sudarshan Prasad house via Bichali Godaam in J.C. Mallick Road 2 Near Ajay Electonic shop to Jharnapara Culvert via Ramkrishna Singh House 3 Uttra Devi house to Bablu Rai House...in ward no. 25
Construction of Drain in Manaitand near jharkhand office mantu rawani house to main drain via dilip rawani Rajesh rawani and Vishal bhagat house Dr.p mohan gali and gol building culvert to main drain via riyaz house and link gali in ward no 30 under
Construction of RCC Drain in IM type Rangamati from Amar Shakti Club Board to Culvert via Dhiraj Jha House and its Branches and near KK school Chandreshwar Prasad to Shivjilal Shrivastava and shakeel Ansari to Imran Khan and in RML colony From Qtr. n
Construction of collapsed boundary wall (approx.30 metre) and fencing of the wall with barbed wire, Laying of internal road, laying out of main & distributory lines for the irrigation field and protection of culvert area using dry stone pitching in the campus of CRURRS, Hazaribagh
Construction of RCC Drain with slab In Hazra Basti from Gumti yadav house to Dikki factory big culvert via chote miya,nisar ansari house ,near Kusunda Area Office from dinesh turi house to raja chai dukan(main road) and different locations in ward no
Construction of Drain in Manaitand near jharkhand office mantu rawani house to main drain via dilip rawani Rajesh rawani and Vishal bhagat house Dr.p mohan gali and gol building culvert to main drain via riyaz house and link gali in ward no 30 under
Construction of RCC Culvert (1X1.5X1) At Bendojor to Turturipani Road, Block-Pakartand.
CONSTRUCTION OF CULVERT NEAR SARNA AT VILLAGE SIDHWAR KALA IN KANDER PATRATU
CONSTRUCTION OF CULVERT NEAR DEWARIYA RAILWAY FATAK ON LALKI RIVER DEWARIYA PATRATU
Construction of RCC Culvert (1X1.5X1) At Japkakona to Kumharbandh Road, Block-Simdega.
Construction of PCC Road from 1. Firoz khan House to Jiaul Ansari house 2. hussain Ansari House to Saimul Ansari House and 1 Nos Culvert 3. paltu Sahu House to Rameshwar oraon House and 4. Izhar Ansari House to Mukhtar Ansari House at ward no 01
Construction of Road in Bhelatand Pipal Tree To Culvert, VIP Colony gali no 6 Ramesh Singh to Ram Govind Ram house and Drain in Balmukund Gali, Jai Ram Pandey to Anil gupta gali and Rajendra Verma to Harendra tiwari gali in ward no. 22 Under DMC Dh
Flange welding, Carrying laying and joining 6 inch dia M.S. pipe 200 Mtr. from 2nd 4000 GPM Pump delivery discharge point(near culvert) to over head tank near CHP and matching of existing delivery range of 4 inch dia 9 No. siding for domestic pit wat
Construction of R.C.C Culvert In, Mango ward No-9,in Construction of R.C.C Drain In, Mango Ward No. 9,InHayat nagar Road no.5 from Hussain House To Kaiman Khujur house and InHayat nagar Road no.5 from Sabaz House To kalin house and In Hayat nag
Providing and fixing 08 nos. RCC hume pipe (1000 mm dia) NP4 in mines and cleaning and repairing of existing garland drains of length 1600 m and cleaning of existing culvert 20 m and cutting of new garland drain of length 400 m at different locations
Leakage repair in 10/12in dia pipeline supplying water from JWTP to Haul road, culvert to RR work shop to Bhimkanali sump and 10/6in dia pipe line supplying water from Hirak road bridge to bhimkanali sump to 45 no pump and overhead tank work under J
Construction of Culvert and Road at Village Gamharia Kenpara (Block- Masalia, Panchayat- Ranighaghar)
Dismantling of 6 inch dia 240 mtr. M.S.Pipe of idle range at B Patch and Carrying Laying and joining of 520 Mtr. 6 inch dia MS pipe from tapping point of 2nd delivery range of 4000 GPM pump near culvert to 9 No. siding/ coal depot for dust suppr
Installation of 3rd 4000 GPM Pump- Motor set including carryig laying and joining of 10 inch dia M.S. Pipe of Length 600 Mtr Delivery range from B Patch ( at near 09 No. siding (CHP) in west side of B-Patch ) to railway line culvert near 09 No. si
Construction of RCC Culvert 1x2.0Mx1.40M) in Road Jhikirma to Donga Pahar at Ch-3.100km
R and M of boundary wall with culvert inside 33/11 KV PSS Patratu Ramgarh
Construction of RCC Culvert (1X3mX2m) at Kesra Pond in Ghutbahar Rajabasa PMGSY Road, Block-Thethaitangar.
Construction of Culvert 3mX2m at Ch-2.67 Km in Garja to Rengari Road, Block-Thethaitangar.
Strengthening of kucha drain from Bilbera Area Office culvert to 15 mine under Govindpur Area
Strengthening of bitumen road from new culvert to main road, Block-IV under Govindpur Area
Transportation of coal from different sources to different destinations on the specified route by tippers incl unloading of coal up to a lead slab as indicated incl cost of all materials and labour etc. for complete job as per direction of In-Chrg
Construction of RCC Culvert (5.0m x 2.0m) at Village- Helta, Panchyat-Helta, Block-Bishunpur, Dist-Gumla
Construction of PCC Road, Guard wall and culvert from Harubeda to Korambey More, Nawadih, Block-Gola.
Construction of RCC Culvert (3.0m x 2.0m) at Village- Helta, Panchyat-Helta, Block-Bishunpur, Dist-Gumla
Construction of RCC Culvert (1X1.5X1) At Japkakona to Harijantoli Road in Ch-1.100 Km Block-Simdega.
Construction of PCC road from RCC Culvert Bridge to Pahar Pendri at Vill- Serka, Panchayat- Serka
Construction of RCC drain near kk school basti to culvert to and in k 1 colony Qtr. No. K-1-192 to Qtr. No. K-1-181 and m type 1 to 40 and in sk4 Qtr. No. 49 to Qrt. No. 56 and its. Connection drain in ward no. 55 under DMC, Dhanbad.
Construction of 3x6.0x3.0 m RCC Culvert at Village- Tusrukona, Gram- Range, Panchayat -Narma,Block- Bishunpur,District- Gumla
Construction of 2 Span Culvert at Sundratoli to Kerabeda Road in Kerabeda Jhariya, G.P-Domptoli, Block-Kolebira.
Construction of Culvert at Ch-05m road from REO Road to Kanarowa via Bamulda road, Block-Bano.
Construction of PCC Road, Guard wall and culvert from R.E.O. Road Madagi to Bongasauri, Madagi, Block-Dulmi.