Loading…
Loading…
6,813 results • Best match
This Estimate is prepared in the Ezhukone - nedumonkavu road under Ezhukone Section.various complaints recieved from public regarding the waterlogging in that area.some accidents had also happened in that place due to water logging.
earth work excavation PCC 1 3 6 M15 M20 for cover slab HYSD bars GSB WMM engaging man mazdoor provision of ring bund and bailing out water etc
Clearing light jungles, pothole filling
Thodu Construction
AS PER BOQ AND TENDER DOCUMENTS
Construction of Road ,Retaining wall , Culvert , Footpath ,House Maintenance and Toilet Maintenance
Quarry muck, scarify,WMM, Bitumen work, concrete work,Pipe culvert, DR work
Quarry muck, DR Side Protection, CC Work for Road, Drain and Culvert
Pipe culvert in kidangara kavalam Road near gurumandiram junction ch 4 950
Coconut pile, QM,GSB,culvert,Excavation , Tarring,WMM,Concrete work, DR packing
Deepening and side protection of chal, CONSTRUCTION OF PIPE CULVERT nos -6
EW,GSB,WMM,BM,BC ,Drain work,Culvert,TRAFFIC SAFETY MEASURES etc.
VAMANAPURAM BP 183.Construction of ponnambi koothuparambu road culvert in Nellanad GP
Earth filling, Culvert Work, GSB, DR Side Protection, Ring Bund, Coconut Pile
Road work ,,GSB ,WMM,BM BC ,Culvert, Irish Drain, Traffic safety work
Proj.No.103/2023-24-Palappuzha Jn. Pulickal west road Drain culvert construction
Provisions are included in the estimate are earthwork Plain cement concrete 1 3 6 for foundation PCC M15 for drain side wall PCC M15 for wearing coat etc
ROAD
MATERIAL SUPPLY FOR MGNREGS WORKS
MATERIAL SUPPLY DRAINAGE WORK
Civil works
ROAD
Road work
Road
ROAD RETARRING
Re Tarring work
Annual Plan-Project No-344/23 (MGR-5.0Lakhs)-General Civil Work
Road work
MATERIAL SUPPLY
DRAINAGE -MATERIAL SUPPLY
ROAD WORK
ROAD WORK
The Sabarimala-Kodaikanal road is a State Highway (SH-44) under the jurisdiction of the Kalloorkkad Roads Section, Muvattupuzha Roads Division, starting at Kummayappura(4/750) and ending at Kaloor(9/750), having a total length of 5.00km
road maintenance
DBM in the most damaged stretches and BC overlay with necessary traffic safety measures.Provisions for the construction of drain, reconstruction of 3 Nos blocked culverts
Wearing coat of concrete, BM and BC surfacing, widening by filling GSB, Side berm concreting, reconstruction of two culverts etc are included in this work.
Bitumen emulsion and cutting of dangerous branches of trees , clearing chocked culverts cutting earthen drain, levelling of raised berm for the removal of water stagnation
Cost of vistha clearence at various areas athirappilly forest station, Athirappilly Range during 22-23 ( 1.Oru Junction to Trijunction - Heavy-Moderate - 5 KM, 2) Causeway to Ooru - Heavy/ Moderate- 3 Km, 3) Chathanpara Junction to to
DEPOSITDEPOSIT WORK PWD 250mmDI PIPE amp100mm GI PIPE REPLACING AT PERINGALA CULVERT FOR BRIDGE RENOVATIONDEPOSIT WORK PWD 250mmDI PIPE amp100mm GI PIPE REPLACING AT PERINGALA CULVERT FOR BRIDGE RENOVATIONGeneral Civil Work
GENERAL-Flood Damage 2025-26 Providing Culvert , Drainage and Side protection work between km 0/650 to 0/750 and 1/250 to 1/400 in Thannitheruvu-Chettappalam-Pallithazhe- C h a m a p p a r a -
Rectification work canal
Estimate proposes the reconstruction of cuvert situated in the ch,20/600 (Across the Valiyapadam Thodu)
GENERAL-Budget 2025-2026- Substitution W o r k - P a n n i m u n d a - M a t t i y a m b a m - Mailambadi Road Providing BT Surfacing, Pipe Culvert, DR Masonry Work,
Road work ,GSB ,WMM,BM BC ,Culvert and shoulder strengthening, Traffic safety work
DR work ,,GSB ,WMM,BM BC ,Culvert, Retaining Wall, Drain , Traffic safety work
Road formation, DR Side protection, Earth and Quarry muck filling and Pipe culvert
146/23 VARAMBANAYI ROAD (THIRUTH VAZHI) CONSTRUCTION OF CULVERT DRAIN IRISH Ward 13
HOUSE MAINTENANCE ,CONCRETE ROAD , TOILET , RENNOVATION OF HALL , CULVERT , PLUMBING WORK , ELECTRICAL WORK