Loading…
Loading…
6,811 results • Best match
Refer tender document
-Re construction of damaged Culvert at ch 5/700 of Olavakkode- Dhoni road-Re construction of damaged Culvert at ch 5/700 of Olavakkode- Dhoni road-
Deposit work Replacing and laying of 300mm DI pipe below the proposed culvert Associated with the PWD work in Vettiyathodu culvert at west kallada Grama Panchayat
In this estimate includes road surfacing with BM and BC reconstruction of culvert new cross culvert at puliyanoor padam and drain works and road Safety works
GSB WMM BM AND BC DRAINAGE CULVERT ROAD SAFETY MEASURES
GSB, WMM, BM, BC,CULVERT, DRAIN AND TRAFFIC SAFETY ARRANGEMETS
Construction of protection wall to the pond,construction of culvert
construction of culvert near Vallakkadavu motorshed at Block 1 padasekharam
Material Supply to Chandran puzhamkunnu footpath, kurishupalli manalvayal road culvert
Construction of Gate and Construction of Culvert in GVHSS School
Road Renovation and Construction of Pipe Culvert at Mannadisala Byroad
Retarring-150m,Culvert-2nos,drain-100m,berm concrete-185m,widenning
CMLRRP-RETARRING, DRAINAGE, PAVERTILE LAYING, CULVERT AND SIDE PROTECTION WORKS
KJP-544 ARIENCAVU GP CONSTRUCTION OF CULVERT IN PALARUVI ROAD
BM Bc work Random Rubble Masonry reconstructiom of two culvert
Drain, Culvert,extension,WMM, BM and BC traffic safety items.
GSB WMM BM and BC drain culvert road safety work
Side Protection Works to Culvert in Nellanickal Thodu - 15.00 Lakhs
Quarry muck,GSB,WMM,Tarring,Culvert,DR Masonry ,coconut Pile
Mavelikara-Thekkekaragp22-23.Mavullathil manapuram culvert drain nirmanam ward 1.
SLTF-Pre_Mansoon works 2021-2022 - Urgent rectification works and clearing chocked up culverts and drain and cutting earthen drain in Pulikkuzhithadam road,
THIS WORK CONSISTS OF Filling with quarry waste and GSB Construction of bituminous road MSS Construction of retaining wall and pipe culverts
Premonsoon work 2023 24 Clearing light jungles clearing chocked culverts and drain Pot hole filling in various roads under Roads Section Pulincunnu
Premonsoon 2020-21 Clearing choked up culverts and drains and allied works in various MDR and SH under PWD roads section Pala
Premonsoon 2021-22 Clearing side drain, culverts, removal of elevated berms and cutting of branches of trees etc. of roads Chithara Pangode
IIP-LLC- Protection works for canal bund and renovation of approach pillars to culverts between Ch.14250 m and Ch.14750 m
The estimate includes the extension of 2 culverts, construction of U drain and Irish drain for the smooth flow of storm water.
40 mm MSS WMM GSB culverts and CC drain hard shoulder road furniture such as caution boards road marking pedestrian crossing etc
Premonsoon 2021 22 Clearing side drain culverts removal of elevated berms and cutting of branches of trees etc of roads Keralapuram Ayoor
t is proposed to demolish the cement concrete and R.C.C works. A damaged bituminous road as an acess to timber mill should be scarified and interlocking tiled road is necessary in the same place and locking concrete also provided
Pre mansoon 2021-22 providing minor repairs darin clearing, culvert clearing cutting trees to Oravackal Kannamkunnu 0/000 to 4/000, Vazhoor puliyannoor2/00to12/00 Pamapdy nedumkunnam 0 to 4/250 Eruthupuzha Kothala 0/0 to 5/450 etc at Pamapdy section.
GENERALSF 202122 Providing BC Overlay and Re Construction of Culvert at Ch 0900 of Link Road Connecting MC Road And LBS Road Ch 0000 to 1130 kmKurien Uthuppu Road BC Overlay to Muttambalam Nagambadom Ch 0400 to 2150 km,Municipal Bus Stand Nagambadom
Premonsoon works 2025 26 of NH 66 and 966 Cutting and removing branches of trees clearing drain clearing chocked culvert painting existing divider from km 246/040 to km 261/580 on NH66 and km 15/656 to 18/056 on NH 966
Premonsoon 2021-22 Providing Minor repairs , Drain clearing , Culvert clearing, Cutting trees, JTS road 0/0 to 4/50 Areeparambu pampady0/00 to 5/700, Vattamalapady Vazhoor0/000 to 2/500, Nedumkuzhy kothala 0/00 to 1/800. etc under roads section Pampa
MLA SDF 2020 21 Kalamassery constituency Replacing the old pipe line near culvert opposite side of Kinder hospital by connecting 150mm MS pipe from 300mm CI line to 160mm PVC line for the rectification of water shortage in western side of NH
Annual Plan-PR No 39/26-27 Annual plan veliyanad BP(600000/-) -Construction of side protection wall from vediyattu culvert to kanjooparambu padi kuzhiyanadi padashekaram at ward 9 in muttar GP-AE/PR NO 39/VLND BP/26-27-General Civil Work
Rectification works
Vettikkavala with Chakkuvarakkal. There was heavy water logging in Chainage 0/300 during rainfall causing accidents to road users. With in one year many passengers met with accident due to the heavy water logging.
NH - 66 Premonsoon 2020-21 Clearing side drain,culvert and cutting of branches of treees at dangerous condition between km 485/000 to 487/000 and 493/000 to 497/000 and engaging labours for filling potholes between km 482/000 to 502/800
Premonsoon 2022 23 OF PUNALUR Clearing of choked drain and culverts cutting earthen drains levelling raised berm for the removal of water stagnation
engaging man mazdoor/coolie for clearing chocked up culverts and drain and repairing BT surface damages using ready mix supplied by department etc
Clearing drain, Chocked up Culverts, Cutting, Harmful branhes of trees, removal of thickvegetation in bridges etc in various roads under section KalloorkadClearing drains
Clearing drain chocked culverts providing Earthen drain and cutting dangerous branches of trees from Km 76 000 to 117 000 of NH 766
PREMONSOON WORK 2021-22- Clearing side drain, culverts, removal of elevated berms and cutting of branches of trees etc. of roads Paripally Madathara
GENERAL-Premonsoon 2023-2024 Clearing light jungle, chocked culverts, drains and removing dangerous branches of trees on various roads under Lakkidi roads section
clearing light jungle, cutting tree branches, cleaning the choked culverts, drains and other works toavoid water logging and stagnation leading to road damages.
2020- 21 Premonsoon works Clearing jungles ,chocked culverts ,drain and providing earthen drain between km 66/000 to 76/000 of NH 766
2020-21 PRE MONSOON WORKS -Clearing Jungles,choked Culverts ,Drains and Providing Earthern Drains from Km 15/000 to 25/000 of NH
GENERAL-Premonsoon 2023-2024 Clearing light jungle, chocked culverts, drains and removing dangerous branches of trees on various roads under Kalpetta roads section