Loading…
Loading…
6,814 results • Best match
The provisions such as earth work excavation, PCC1 3 6, PCC M15, . Earth work excavation, PCC 1 36 for foundation, M15 for foundation and abutment, M20 for bed block, slab, parapet
SUPPLY OF CONSTRUCTION OF MATERIALS AGGREGATES ,SAND,PORTLAND CEMENT STEEL ETC
SUPPLY OF CONSTRUCTION OF MATERIALS AGRREGATES, SAND,PORTLAND CEMENT,STEEL ETC
Material supply to Randamkai anganavadi road, thekkinthottam road side protection, kaithapoyil vilakkatukavil chemmarampatta road culvert
Road work includes WMM GSB BM BC construction of culvert and drain traffic safety works
Anad GP 2020-21 Pro No - 226/21 Vanchuvam Pump House Road Culvert and sidewall.
Construction of Bituminous Road, concrete road, drain, side protection Wall, Culvert, RCC Retaining wall etc
Clearing chocked culvert and drain, Removal of slipped earth,Pot hole filling,clearing jungle etc
Removing the earth slip at Ambayathodu culvert to maintain Marshy area in Kottiyoor Wildlife Sanctuary
KARUNAGAPPALLY MUNICIPALITY 2019-20- PROJECT NO. 179/20 KALEEKKAL KIZHAKKATHIL KOZHISSERIL TEMPLE CULVERT DN-17
40 mm MSS culvert CC drain retaining wall using DR masonry Road marking signboards etc
Modampadi road widening Interlock block paving and Re-tarring culvert work at Kozhinjampara Phase 2
Construction of Drain and culvert work Gsb Wmm BM and BC and traffic safety work
Ottapalam BP2023-24 Construction of culvert across Nellaya Thodu near Kuruthikuzhi Kulangara in Nellaya GP
GSB BM and BC road marking drain and culvert DR masonry hard shoulder road marking
GSB WMM BM and BC Culvert and drainage road protection work road safety measures etc
GSB WMM BM BC drainage and culvert retaining wall road marking and sign board etc
SR Works 2022 23Reconstruction of Culvert (Canal) at Km 0/000 in Karimpara Gomathy road
PROJECT NO-89 KESAMATHU PADI-PANAVILA ROAD SIDE KETTU AND CULVERT RENOVATION IN WARD-4
WMM GSB BM and BC culvert drain and hard shoulder on both sides of road
Retarring, drain work, side protection, culvert, concreting. (Need to complete work by March 31, 2027)
Repairs using Shelmac and Bitumen emulsion and cutting of dangerous branches of trees , clearing chocked culverts cutting earthen drain, levelling of raised berm for the removal of water stagnation
cutting and removing the branches trees, eliminate the water logging issues in culverts, pot hole filling with 36mm aggregate and emulsion, minor pot hole filling with department issued shelmac
Clearing of blocked up culverts and drains , removal of slipped earth and cutting of damaged branches of trees on various roads in Poonjar constituency under PWD Roads section Erumely
SLTF-SLTF 2021-22 Pre-Monsoon Vallikunnu LAc-Clearing of drains Ventways of culverts high berms light jungles etc in various roads in Vallikkunnu LAC under Roads section Parappanagadi
cutting and removing the branches of damaged trees,solve the water logging issues in culverts,Berm removal and constructing earthern drains,Pot hole filling,Placing shelmac in pot holes
Premonsoon Work 2022-2023-Clearing light jungles, culverts, drainages, pothole filling, cutting branches of trees/dangerous trees and allied works to Roads in Vazhoor section under Kanjirappally sub division
cutting and removing the branches trees, eliminate the water logging issues in culverts, pot hole filling with 36mm aggregate and emulsion, minor pot hole filling with department issued shelmac
Cleanning Chocked up culverts , Clearing Light Jungles , removal of earth slips , deepening / Cleaning side drains , Shoulder Maintenance and urgent patch repairs works using shelmac/ Emulsion for Various roads U
Pre Monsoon works 2324 Clearing of blocked up culverts and drains removal of slipped earth and cutting of damaged branches of trees in various roads under PWD Roads sectionVazhoor
Premonsoon work 202324 Clearing of blocked up culverts and drains removal of slipped earth and cutting of damaged branches of trees in various roads under PWD Roads Section Erumely
Clearing chocked up culverts and drains in various roads and urgent stray pothole filling is very essential as the conditions are getting worse due to heavy rain and storms
This estimate is prepared for clearing light jungle, cutting tree branches, cleaning the choked culverts, drains and other works to avoid water logging and stagnation leading to road damages
GENERAL-Pre-Monsoon 2024-25-Clearing of light jungles, chocked up drains and culverts, rectification of damaged drain in NH 66 from KAzhakoottam 553 000 to PALAYA 564/000
This estimate is prepared for clearing light jungle, cutting tree branches, cleaning the choked culverts, drains and other works to avoid water logging and stagnation leading to road damages.
GENERAL-Pre-monsoon-Pre -Monsoon work 2021-22- Clearing of drains vent ways of culverts, high berms, light jungle etc. in variousroads in Tirur LAC under Roads section Tirur.-
Supply of labour for the work of clearing drains, vent ways of culverts and removal of slipped earth for the period from 01-04-2026 to 31-03-2027
Cleaning and clearing of drains, culverts, etc. pot hole filling using 36mm and 12mm, engaging hydraulic excavator and JCB for urgent slip removal, providing sign boards at curves, etc.
Providing temporary bund and providing temporary barricades and warning sign boards
Temperory bund and warning sign board
Provisions given in this estimate are , removel of earth from existing CC drains,Lifting, covering slab of CC drains for drain clearance and replacing the same in position,Clearing light jungle on road sides, Cutting branches of dangerous trees.
This estimate is prepared for arranging urgent premonsoon works in variuos roads in Chadayamangalam LAC. Most of the PWD roads under Chadayamangalam LAC is connecting hilly areas to low lying areas. These roads are to be keep in good condition
Rectification of monsoon damage.
Maintenance work
Side Protection
CIVIL WORK ROAD