E W for widening GSB WMM FUP BM BC concrete items 1 3 6 M15 M20 for culvert and cover slabs Traffic safety works Survey shifting KSEB posts, BSNL cables etc
GENERAL Construction of drain from Avanavanchery Jn to Attingal Taluk Hospital RHS and culvert at Avanavanchery Jn in Venjaramoodu Attingal road SH General Civil Work 1 From ch 8850 to 09150
Road work including Excavation for road work in soil, Scarifying existing bituminous road surface , Construction of GSB ,WMM ,Providing levelling course ,BM and BC, Traffic safety works ,Drains and culvert etc
Road, Drain, Retaining wall
Improvements to road
ROAD MAINTANANCE
Road
Please refer Tender document
OR-premonsoon works 2024-25-Clearing jungle , road side drains ,etc various roads under Roads section Koduvally
The bridge across the Right bank canal at ch.0/300 km inside the Malampuzha Garden has its parapet walls in a dilapidated condition. The bridge is located at centre
footpath
PUBLIC WORK
S R Work 2021 22
Protection Wall
retarring,tarring,drain,,side protection wall
Please refer Tender document
Tarring
Road work
This estimate propose an interlock-tile road on WMM filling. Filling WMM, supplying and laying interlocking tile, M20 (without formwork) side concreting, inaugration stone, man mazdoor for clearing site, drain culvert construction
The provision included in this estimate are supply of 36mm metal filling up pot holes with 20mm close gradrded chipping carpet and clearing chocked up culvert and drain to avoidthe water stagnation
Works including Filling up pot holes, GSB, WMM, Close Graded Premix Carpet Surfacing, 100 mm CC interlocking tiles, Road safety works, Retaining wall and Curtain wall, Drain Work and Culvert work etc.
Earth work, cc forlevelling course ,M15 for foundation and s/s for DR RW , CC RW and culvert extension ,HYSDreinforcements,M25 RCC for deck slab extension ,parapets including painting for all structures
PWD -Deposit Work in Connection with Sabarimala Festival 2021-22 -Development work at MC road - Improvements of Oushadhi junction Perumbavoor - Relaying 300 mm MS pipe crossing at culvert portion near Kumar bakers
This estimate is prepared for nitigating the THe estimate is provided with labours for drain cleaning , culvert cleaning , branch cutting of trees , and other necessary concrete items for maintance of damaged structures
Road work including Excavation for road work in soil, Scarifying existing bituminous road surface, Soil stabilization ,GSB ,WMM , Dense graded BM , BC , Traffic safety works , Interlocking tile, Culvert , drain and footpath etc
The estimate includes fup 20 mm thick cgcc for initial rectification worksProvisions for labour for clearing chocked up culvert drain to avoid the water stagnation anticipatory quantity for shoulder concreting Emergency work
Pre Mansoon work 2021 22 Pot hole filling with deptl Ready mi cleaning side drain and culvert levelling berm etc Kottarakkara Sasthamkotta road ,Kottarakkara Velinalloor Road in Kottarakkara Town General Civil Work
Road widening and raising using GSB,WMM,bitumen leveling course using 36mm metal, construction of new culvert,drain,road safety arrangements,utility shifting ,survey and unforeseen items are included in the estimate
BC overlay WMM and BM for damaged portions reconstruction of damaged culvert and construction of drainage centre and edge line marking retro reflecting studs sign boards and hard shoulder at necessary areas
side protection work of canal
Removal of Water hyacinth
Refer tender document
This estimate for the Routine maintenance is prepared by grouping together the bridges in the same constituency. This estimate isprepared to carry out the routine maintenance of 8 bridges -Panar Bridge, Poothotta Bridge,Kolencherykadavu Bridge etc
Pre monsoon woks 2020-2021
Side protection works
clearing jungle demolishing cement concrete earthwork excavation CC 1 4 8 for base of footing RCC 1 2 4 for footing and abutment RCC 1 1 5 3 for deck slab bed block and parapet Provisions for centering shuttering and painting
SLTF-Premonsoon work 2021-22- Urgent patch repairs using ready mixed bituminious compound , cutting and clearing branches of trees,clearing ventway of culverts in Pattam- M a n j a l y , A y i r o o r - T h i r u t h i p u r a m ,Puthenvelikkara
2 nos of culvert of size 2.00 2.00 m , retaining walls . For formation of road estimate include provision for earth work excavation , blasting of medium rock , blasting in hard rock ,GSB,WMM, Bitumen
The provision includedare supply of 36mm metalfilling up pot holes 20 mm thick close graded chipping carpet clearing chocked up culvert and drain to avoid the water stagnationanticipatory items for various roadsemergency works
Road work including Scarifying GSB ,WMM ,pothole filling, bitumen levelling course with 36 mm metal, Premix bitumen levelling course with 12 mm metal, OGPC ,Interlocking tile ,Drain ,Culvert ,Retaining wall , traffic safety works
Provision for upgrading the road with BM bit and BC overlay, construction and reconstruction of drain and culvert , supply and laying ILCB and trafic safety arragements, engaging coolies, earthen shoulder, DLP board etc
Excavation, Scarifying,GSB,WMM, interlocking tile, RCC Grade M20 for tile portion, Supplying 36mm,FUP,BLC, primer coat, tack coat,BM,BC, Culvert,Drain, Irish drain, Road protection wall, and Road Safety Works
In this estimate scarifying, GSB, WMM ,BM patch ,500 m old damaged drain reconstruction, Culvert reconstruction at Ch. 22-800, 23-700 ,BC relaying for full width, Road safety items etc are included.
This estimate includes provision for 145m of RCC drain and 7m culvert. Items such as GSB, PCC, M15 concrete, M20 concrete, HYSD bars, mazdoor for clearing site, etc are included in this estimate.
Routine premonsoon works like berm clearing, drain and culvert clearing, Emulsion patch repairs, Quarrymuck filling, WMM , cutting the branches of tree coming in the ROW 20 mm close graded premixed chipping carpets etc.
construction of new culvert, and construction of retaining walls widening carriage way to 4.5m width scarifying the carriage way, GSB15cm thick, WMM 15cm thick ,50mm BM, 30mm BC. Irish drains .Road safety works
The provision included in this estimate are supply of 36mm metal,filling uppot holes with 20 mm close gradrded chipping carpet and clearing chocked up culvert and drain to avoid the water stagnation .