Loading…
Loading…
6,814 results • Best match
The provision included are supply of 36mm metal,filling up pot holes with 36mm aggregate 20 mm thickclose graded chipping carpet Provisions for clearing chocked up culvert drain anticipatory quantity for shoulder concreting CGPC Emergency work
The provision included in this estimate are supply of 36mm metal,filling up pot holes with 20 mm close gradrded chipping carpetand clearing chocked up culvert and drain to avoid the water stagnation,damaged drainage work
Provisions included in the estimate are for dismantling, Earthwork Plain cement concrete 13 6 for foundation PCC M15 for drain and culvert side wall PCC M20 for wearing coat and M20 for slab and sufficient reinforcement
Premonsoon Work 2023 24 clearing Light jungles cleaning side drain and culvert levelling berm removing and replacing covering slabs of side drains cutting branches of trees etc to Alimukku Punnala Road Ch 0/000 1/200
Providing foot path by laying coloured paving tiles and handrails to footpath in town area. Drain side wall raising and construction of new drain ,culvert ,DR retaining wall , cover slabs constructing retaining wall 2 m height
Concrete kerb, Interlocking tile, Steel pipe railing, Retro-reflectorized sign boards, Synthetic enamel paint, Thermoplastic compound, Road studs, Epoxy painting, Excavation, Dismantling culvert, PCC 1 3 6, PCC M20, PCC M15, RCC M20, HYSD bar etc.
The estimate is prepared for improving the road by giving BM BC necessary drainage Culvert reconstruction and Irish drain works and by including necessary CD works and LS provisions for utility shifting by KWA and KSEB
Ottappalam Urban water supply scheme Urgent pipe line repair works happened by them during the progress of road work and Temporary alignment shifting of existing distribution line to facilitate Culvert and RCC drainage Construction in Ottappalam
Pre monsoon work 2020 Clearing chocked up culvert light jungles removing earth slips deepening/cleaning side drains and shoulder maintenance and urgent patch repair works with using emulsion/shelmac in various roads under Roads Section Nedumkandam
The provision included in this estimate are supply of 36mm metal,filling up pot holes with 20 mm close gradrded chipping carpetand clearing chocked up culvert and drain to avoid the water stagnation,damaged drainage work
In this estimate includeclearing and grubbing, Earth work, pot hole filling using 36mm metal, leveling undulations with 12 mm brocken stone, GSB, Interlocking tile, Irish drain, Construction of culvert and chappaths, DR masonry retaining wall etc
The provision included in this estimate are, Under appendix A , supply of 36mm metal,filling up pot holes, 20 mm thick close gradeded chipping carpet etc.Under Appendix B)Clearing vegetation , clearing chocked up culvert and drain
Tender is being floated for Construction of New Retail Outlets at Adooparambu,Ernakulam District. The works involve construction of Sales building, Tank installation & Pipeline works, Driveway laying & culvert works, Electrical panel & Other electrical related works ok
Civil Works
Refer tender document
Items included in this estimate are Earthwork in excavation, PCC, M15 concrete, M20 Concrete, HYSD bars, Mazdoor for placing slabs, etc.
DEPOSIT-Deposit work 2022/23 Thalavadypanchayath W-14-KWSS to Thalavad-Laying 90mm pvc line in ward 2 from mangalathaadi to shalom marthoma church arthisseri road culvert.Pipeline Work
engaging man mazdoor/coolie for clearing culvert and drain, removing water stagnation, Engaging JCB for loading dumped earth and materials in road berm, cutting branches of trees, Engaging tipper for conveying the earth, clearing light jungle along
Premonsoon Work 2023 24 clearing Light jungles cleaning side drain and culvert levelling berm removing and replacing covering slabs of side drains cutting branches of trees etc to Punalur Papermill panampatta road Ch 1/700 4/800
providing BM and BC surfacing construction of 500m CC drain 1800 m irish drain one new culvert retaining wall providing 100mm thick interlocking tiles in four locations providing foot path tiles on both side of Vettukadavu bridge
This estimate includes rectification by pot hole filling using 36 mm metal and cgpc for rectification of surface damages Provision for GSB and WMM for filling trenches Items for clearing vegetation drain culvert cleaning emergency works included
supply of 36mm 12mm metal and FUP, 20 mm thick close graded chipping carpet laying interlocking concrete block, Provisions for clearing chocked up culvert, drain to avoid the water stagnation, filling potholes using ready made bituminous compound,
Clearing of jungle and removal of rubbish including maintenance of shoulder and repairs to water cuts along either side of paved surface, cleaning of cholked culvert, drains and earth slips etc., clearing of PWD Roads section, Thalassery
In this estimate includes raising with GSB and WMM Road surfacing with BM BC is proposed. 8 cross culvert DR Work Earth filling and Road saftey items like road markings stud and sign board are also proposed
Desiltation
nip work at Viyannoor
Refer tender documents
The estimate for widen the minimum carriage way width is maintain 5.00 mtr with close graded, reconstruction of two culvert, road safety measures, EW, Interlocking tile,cement concrete Cross drain and Drain with cover slabs are also proposed.
In this estimate camber correction with WMM, raising with GSB,WMM and widening with GSB, WMM, BM and BC , Irish drain, retaining wall reconstruction , and 2 nos culvert reconstruction, covering slabs for existing drain, road furniture items etc
Road work including Excavation for road work in soil, Excavation for road way in ordinary rock and hard rock ,Scarifying existing bituminous road surface ,Construction of GSB ,WMM ,BM ,BC, Traffic safety works ,Protection work ,Drains and culvert
The estimate includes provisions for clearing choked culvert,removal of grasses along berm side, filling potholes using shellmac ,arranging JCB for clearing water logged portions and engaging wood cutter to cut branches of trees leaning to road side
Provision for earth work,pcc 1 3 6,M20 ,HYSD steel bar for reinforcement and Dry rubble for foundation and superstructure in retaining wall etc are includedin this estimate.
Provisions are given for earth work for foundation drain and retaining wall PCC 1 3 6 for foundation bed drain bed and vent way bed PCC M 15 for abutment
re-constructionof the slab to the full width road. damaged parapets and new parapet at this portion also included. pothole filling in the damaged portion with 20mm close graded chipping carpet included for finishing the surface
Provision for reconstuction of cross drain with 7 meter length and 3.5 metrs width, Providing inetrlocking tile after scarifying and levelling with WMM for 193 meters length, repair and placing loading cover slabs over existing drain for 135 meters
Road
Road
Pre monsoon works
BM and BC with 4.5 m avg. width, widening and strenthening with GSB and WMM, prime coat and tack coat, BM and BC,Drain works , irish drain , Retaining wall works,culvert reconstruction work , Interlocking Paveer block traffic safety works
supply and stacking36 mm broken stone,12mm broken stone,6mmbroken stone,Filling pot holes and levelling course using 36mm providing and laying open grade premix 20mm thickness ,earth work for culvert and drain,PCC,PCcM15,RCC M20 for concreting
GENERAL-FDR-SR-2024-25-Reconstruction of damaged Pipe culvert and Side Protection wall on Athikarathodi Kutaloor Ist reach road at b/n ch 1/500 to 3/250 in Malappuram District and LAC-Civil work-General Civil Work
Reconstruction of damaged retainingwall and road safety measures in Nagapuzha Kumaramangalm Road at ch 1/300 the side protection work at the damaged portion at ch 1/300 near the last culvert portion is proposed as RCC retaining wall
Extra widening for curves and junctions by providing GSB and WMM,36mm leveling coarse, BM and BC construction of new culvert, drain, road safety items , provision for shifting utilities, survey, lump sum amount for unforeseen items etc in estimate
This estimate is prepared for providing 50mm BM and 30mm BC to the above road with necessary traffic safety mesures including the restoration works in App D. Necessary provisions for the construction of drain, Culvert and DR retaining wall etc
Provisions such as BM and BC, filling up pot holes, levelling course using 36mm broken stone, road widening using GSB, WMM, M40 grade paving tiles, M30 grade tiles for footpath, drainage facilities with culvert, necessary road safety measures etc are
Turfing on DS of Saddle Dam Repairs to culvert and bridges at main entrance of the dam and KSEB junction Construction of compound wall with gate and fencing at IB compoundStrengtheningof hoisting pillars and beams at dam topSurvey of reservoir
Supply and stacking 36 mm broken stone,12mm broken stone, 6mm broken stone filling pot holes and levelling course using 36 mm ,providing and laying open graded premix 20mm thickness,earthwork for drain and culvert, PCC ,RCC M20 for concreting.