Loading…
Loading…
4,340 results • Best match
SPECIAL REPAIR OF KUDA HATHIBHAAR ROAD SUBMERSIBLE CAUSEWAY KM 8/8
Construction or Culverts and Repairing work of Bridge and Culvert on Bachhora Birora Pahad Manetha upto UP Border under Niwari Division
REPAIR WORKS OF CULVERTS/BRIDGES ON VARIOUS ROADS OF SECTION KALAPIPAL AND POLAYKALANA UNDER SUB DIVISION SHUJALPUR
REPAIR WORKS OF CULVERTS/BRIDGES ON VARIOUS ROADS OF KALAPIPAL AND POLAYKALAN SECTION UNDER SUB DIVISION SHUJALPUR
Survey of proposed Nauha Stop Dam Cum Causeway
REPAIR WORKS OF CULVERTS/BRIDGES ON VARIOUS ROADS OF SECTION MAKSI/ GULANA/MO. BADODIYA UNDER SUB DIVISION SHAJAPUR
NIT SCHEDULE FOR CONSTRUCTION OF SLAB CULVERT AT GRAM PANCHAYAT PACHAUR GOVAR KUNDI MAHALLA ON KUDIYA NALLAH SUB DN DEOSAR DISTT SINGRAULI 1NO SINGLE SPAN 3M 01 NO DUBLE SPAN 8M PCC APPROACH ROAD AND RETAINING WALL
REPAIRING WORK OF SLAB CULVERT ON GURADIYA GURJAR ROAD,TANODIYA MAKDON SHAJAPUR ROAD,RUPAKHEDI TANODIYA ROAD,DONTA JAWASIYA ROAD(H P C) AND BAGHERA APP. ROAD KM 1/4 AND APP.ROAD AT SUB DN. TARANA DN. UJJAIN
AS PER NIT
Repair work of Kaswakhedi barrage cum causeway of SAS.
Reconstruction of Minor Bridge (Box culvert) in Km. 1/8 on Pipariya Link Road under Pipariya Sub Dn. 1st Call, PAC Rs. 57.60 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 180 days.
REPAIR TO CULVERTS, STONE PITCHING TO CHANNEL OF NALLAH, GRATINGS AND CONCRETE WORKS AT DOWN STREAM AND UPSTREAM OF CULVERT AT AFS AMLA
Repair work of damaged Nanakpur barrage cum Causeway Scheme.
CONSTRUCTION OF CEMENT CONCRETE ROAD, RCC DRAIN, RCC BOX CULVERT, RCC COVERED NALA, WATER SUPPLY (TUBEWELL, PUMP HOUSE, OVERHEAD TANK, SUMP WELL), WATER HARVESTING, 02 NUMBER PUBLIC TOILET BLOCKS, ROAD SIDE GREENERY AND EXTERNAL ELECTRIFICATION WORK
Construction of Slab Culvert (2 Nos) At Mhow Neemuch Fourlane Road Part in Jaora Road in Km 36/8, 37/10 and HPC (1 Nos) at Ringnod Kalaliya to SH-31 Fourlane Lebad Nasirabad Road in Km 5/6
Construction of C.C.Road from Home to Gurdeep Kishor Vimla Lalji Laxman Sudarshan up to Roshan home under Dada Baburao Paranjape ward, C.C. road in Babbu Kuliya, Kailashpuri and Gupteshwar under Giriraj Kishore ward, Slab culvert at Amarsingh Taal (f
CONSTRUCTION OF CULVERT NALA AT WARD 01
Construction of Stopdam Cum Causeway on the way of Sikarwar sahab farm GP-Hilgana Block Guna Distt. Guna
Flush causeway at Approach road of Mandi Khandwa Distt. Khandwa
Construction of Vented Causeway At Sarawada ward no. 24 Chhindwara
Construction of canal lining, causeway of Patpara nalla Tank Scheme
Repair and renovation of daiyat barrage cum causeway under SDMF.
Const. of Vented Causeway (Puliya) at Ward No. 15 Kothri
Construction of culvert Gram panchayat baisasur nadi par ,Block- Maihar, dist. satna (M.P.)
Tender for the Construc-tion of B.T. Road and Hume Pipe Culvert on Ghisi Pandiya Chhapara Road Length 5.60 Kms. under Sub Dn.Keolari.
Construction of Hume pipe culvert and approach road at 33 11 kv Sub Station at Beelakhedi Kurwai DC O and M circle Vidisha
Special Repair work of 1.50 M Single Span Slab Culvert on Kandhwar ward No 01 to 08 App Road at Km 1/4, 2/4 and HP Culvert in Kandhwar App Road at Km 1/2,1/4 and Murtala Shankarpur Raod at km 1/2 Under Sec. Rampur Naikin, Sub. Dn. Churhat Distt. Sidh
Construction of Gravel Road and Culvert at Chhote Balha to Bada Balhaj.p.Majhagawan dist satna (M.P.)
CONSTRUCTION OF W.B.M. ROAD including box culverts from sankhedi shasmshan ghat to sankhedi sewage treatment plant
Construction of CC road from Bighwadand (Chaura) to Karsualal including RCC box culvert at Sukhra Nalla and Construction of CC road from Sipahilal Bais house to PMGSY Road, Padeniya under CSR with provision of comprehensive maintenance for 5 years
Construction of Span Slab Culvert Fish Farm Sirmour Distt. Rewa
CONSTRUCTION OF BT APPROACH ROAD WITH CD, 1) FROM KADMAL-II TO NISARPUR-II, III MALWADI BASAHAT WITH SLAB CULVERT, 2) FROM KATNERA SH-26/ SHANI TEMPLE TO UNAFFECTED AGRICULTURE LAND OF FARMERS OF VILLAGE KATNERA, 3) FROM KATNERA SH-26 TO UNA
Construction of approach road and vented causeway of Borkakheda Irrigation Tank.
Repair work of Sinduriya barrage cum causeway and Bais River barrage.
Construction of causeway work under submergence area of Kalirundi (Simlawada) tank.
Construction of PALEE STOP DAM CUM CAUSEWAY On Turn Key Basis
DESIGN, SUPPLY AND FIXING OF PRE-CAST RCC BOX CULVERT SIZE 2.00 M X 2.00 M (NHSL SPECIFICATION 7.45 MTR WIDTH) INCLUDING EARTH WORK EXCAVATION, PCC BED AND PROTECTION WORKS BETWEEN KM 0.00 TO KM 14.350 ON PUWARTI-GOMAGUDA ROAD
Construction of Different Roads Slab Culvert Work Under PWD Division Sagar Rs. 998.29 Lacs 1- SLAB CULVERT AT GARHAKOTA DEVPURA GUNJORA ROAD CH NO- 9/4 AMMOUNT RS- 72.99 2- SLAB CULVERT AT LUHAGAR NAVALPUR ROAD CH NO- 1/10 and 4/4 AMMOUNT RS
Construction of HUME PIPE Causeway Cum Stop Dam Between Mohanpura to Chailay Road, GP Mohanpura, Block Tirla District Dhar M.P.
Construction of Retaining wall, Hume Pipe Culvert, Paving Block Floor and Waiting Shed at Mokshdham Ward No. 06 Under Vishesh Nidhi in Municipal Council Chicholi
Mukhymantri Sahri Adhosanrachana Vikash Yojana Phase-41. Construction Of Model Road Ward 12/13 2. Construction Of Park At Ward No.-17 3. Construction OF Box Culvert And Drain At Ward 09/18 4.Electric Line Extention From Ward 01,02, 04,05,06,08,11
REPAIR OF CULVERTS AND BRIDGES UNDER SUB DN. HARDA
Construction of Gopi Stop Dam cum causeway on Kunwari River
Construction of Stop Dam Cum Causeway at Kousal Kishor and Subhash ward
Closing and opening gates of stop dams, barrage cum causeway and barrages
Survey Work of Baheriya Stop Dam Cum Causeway Barrage in Sanchi Block.
Repair work of Imaliya Dhona Stopdam cum Causeway under Atal Bhujal Yojna.
Repair of Left Part of causeway at Down Stream of Mohanpura Dam.
Construction of causeway with connected road D/S of Pawai Medium Project.
Repair of Right Part of causeway at Down Stream of Mohanpura Dam