Loading…
Loading…
4,340 results • Best match
Construction of Box Culvert at Ward No 20 IInd Call
Survey, investigation and preparation of DPR of Bridges/Box culvert
Survey, investigation and preparation of DPR of Bridges/Box culvert
CONST.OF CULVERT AND RETAINING WALL AT RADHAKUNJ W-61 Z-14
CONSTRUCTION OF CC ROAD NEAR CULVERT JABRANPURA W-62 Z-15.
Const of Slab Culvert Bhaisa Aloni To Kalumar, Ch. 2040 Mtr. Jabera
Const of Slab Culvert Sajpani To Hanumat Bago Ch. 875 mtr. Jabera
As per NIT
NIT 940 Construction of approach road and Box culvert on Fifrad river at Somgaon Karoli road to reach farmers villagers of Somgaon village under ISP district Khandwa MP
Construction of Cement Concrete road, hume pipe culvert and check post with toilet and area development at O and M Circle Premises under O and Circle Datia
Construction of Extention Height of causeway under work of Khokhari Barrage No.2.
Special Repair work of Vented Causeway km 3/4 of Pipalrawa Tungni Road
Additional work for Approach Road R/S of Bhidosa causeway cum stop Dam
CONSTRUCTION OF CULVERT BETWEEN WARD NO. 7 AND 15
Construction of Box Culvert Two barrel at Ward no 01 Filter
LAYING OF STROME WATER LINE FROM DWARIKA SQUARE TO GUPTA LODGE NALA MAIN ROAD WITH BOX CULVERT AND CONSTRUCTION OF RCC DRAIN REMAINING NALA OF SMART CITY TO SHIV SAGAR HOSPITAL AND BACK LANE OF ALLAHBAD BANK IN SHIVAJI NAGAR WARD, SAGAR - NIGAM NIDHI
CD Work on Khama to Khamtala CMGSY Road VCW 4x1000mm dia. at RD 450.0m., Slab culvert 2x4.00m, at RD 2900.0m. Slab culvert 2x5.00m, span at RD 3200.0m Janpad Panchyet Unchehara district Satna
CONSTRUCTION OF CULVERT AT LAKSHMAN NAGAR PULIYA WARD 50 ZONE 09
Construction of culvert near hanuman ji mandir at ward no 4
const of culverts on filter plant road
Special repair of stop dam cum ripta in KM 22/6 on Itay Maihar road and causeway in KM 17/2 on Madwa Fatehpur Baghwar Road
CONST. OF RCC CULVERT BEHIND SULABH COMPLEX IN LALITA NAGAR, Ward 83 Zone18
constrution of rising causeway at bada talab in ward no 01 jhabua dist jhabua
Annual Repair work of Kaharpura stop dam cum causeway (2020-21) Distt- Guna (M.P.)
Repairing Of Causeway At Betawa River Near Orchha On NH12 DAMOH TIKAMGARH ORCHHA ROAD
operation of barriers on both ends of causeway on Johilla River at SGTPS Birsinghpur.
Dismantling of Yard Fencing and Construction of Yard Fencing CC Road Hume Pipe Culvert and Security Guard Hut etc for accommodation of 33KV Feeder Bays at 220KV Substation Malanpur
Closing and Removal of Gates of Sovat Stop dam cum causeway, Kankda Stop dam cum causeway, Mahana Stop dam, Rusalla Buzurg stop dam, Bhagwanpur stop dam Renjhaghat Stop dam Tehsil Ashoknagar/ Esagarh District Ashoknagar
CONST.OF CULVERT and APPROCH ROAD AT DHADAKNI NALA AT WARD NO 5
Consultants for survey, investigation and preparation of DPR of Bridges/Box culvert
Consultants for survey, investigation and preparation of DPR of Bridges/Box culvert
Consultants for survey, investigation and preparation of DPR of Bridges/Box culvert
Consultants for survey, investigation and preparation of DPR of Bridges/Box culvert
Consultants for survey, investigation and preparation of DPR of Bridges/Box culvert
Consultants for survey, investigation and preparation of DPR of Bridges/Box culvert
Consultants for survey, investigation and preparation of DPR of Bridges/Box culvert
Consultants for survey, investigation and preparation of DPR of Bridges/Box culvert
Consultants for survey, investigation and preparation of DPR of Bridges/Box culvert
Consultants for survey, investigation and preparation of DPR of Bridges/Box culvert
NIT 942 Construction of Causeway Rapta and drain on existing approach road to farmers fields at Dhanwanimafi village under ISP district Khandwa MP
Construction Of cc work on dhakni culvert at ward no 05
Ward no. 03 Construction work of culvert near Kamlesh Gupta house
On Turnkey Basis Construction of 07 Nos. Gated Barrages (Sironj Barrage cum Causeway, Ranayar Barrage, Daknakhedi Barrage, Patada Barrage cum Causeway, Tigariya Goga Barrage, Barod Pipliya Barrage and Gajnodkheda Barrage) across Shipra River and its
Construction of PCC road drain and culvert work from Satna Kotar Road to Nathu Sharma house at Ward no 10
Hume pipe culverts at different location in mine area of Jhingurda Project under Monsoon Activity 2021-22.
Construction Of cc work at dhobi ghat culvert from ward no.08
Construction of Box Culvert Three barrel at Ward no 01 Near Udham Filed
Construction of SIX Row Vented Causeway at lalya Chapad To Jamniya Road Bock Barwah District Khargone M.P.
Construction of RCC Nala and culverts
CONSTRUCTION OF APPROCH CULVERT AND FLANGE WALLS AT AKANSHA ENCLAVE WARD 50 ZONE 10