Loading…
Loading…
2,531 results • Best match
S/R to RD Road to Kaduamagura for the year 2022-23 (Such as CC Repair, Culvert from 3.00 km to 4.00 km).
Construction of RCC Drain with Cover slab and Culvert from Ganesh Mandap to PWD Drain and Towards jail Square, Jharpada, ward no 33
Baunsabeda to Pujariguda_Road_Boxcell Culvert -1X3X2- and-2x6x3- Repair of Approach RoadAt 1.920 Km and At 4.000 Km. 1.870 to 1.970 3.050 to 4.050
S/R to road from NH-06 to Patrapali Boxcell culvert and SDBC in the district of Sambalpur for the year 2026-27.
Repair and improvement of culvert and outlet at RD 23000 m of Left Distributary of Baghua Irrigation Project for the year 2026-27.
Desilting of storm water Drain 4 and fixing of chain link fencing at different culverts from OPTCL building up to confluence point with Gangua including daily cleaning from Nov 23 to Apr 24 near trash rack of BBSR City
Desilting of storm water Drain 10 from Railway crossing up to confluence point with Gangua and fixing of chain link fencing on different culverts including daily cleaning from Nov 23 to Apr 24 near trash rack of BBSR City
S/R SNB Road (SH-1) such as pot hole repair, white washing to road side trees, painting to parapets of culverts and Guard walls, flank dressing and jungle cutting and saucer drain from 72.000 Km to 85.000 Km
REPAIRS TO VARIOUS JOINTS OF RUNWAY DISPERSAL AND CONNECTED AREA WITH POLYURETHENE JOINT FILLER DTGM RUNWAY SIGN BOARDS AND JOINT FILLING WITH GRADE B JOINT FILLER EPOXY FILLING AT AIRFIELD CHARBATIA AND REPAIR DESILTING OF RUNWAY DRAINS CULVERTS IN
Repairing of culvert near entrance gate and providing and fixing interlocking paver block inside premises of Project Office of LOCP under IB Valley Area.
Construction of Drain with cover slab and Raising C.C Road at Bhoota sahi Hanuman bazar jn.entrance to middle culvert approach in w no 7
Const. of RCC Road and Culvert from Gosaninuagaon new Police Station to back side of Ray Building via RI office in ward no. 27
Construction of Drain and Culvert with slab from Dani Doctor to Gagan Swain House and Govt.Hospital backside at RRIT Colony in Ward No.08
Re-construction of R.C.C. culvert near Tarini Mandir and R.C.C. drain from Gitarani Swain res to MSWC at Shrivihar colony in Ward No. 09.
Repair and Restoration of Chidanandanagar road drain wall and laying of on drain near culvert and kalyanmandap in ward no.18 in polasara NAC
Construction of paver road, drain and culvert from Rajesh Sharma house to Nivesh Agrawal house beside shiv temple, Tiwarigali khetrajpur in ward no.14
Construction of culvert and rising of drain with cover slab from Yudhistir Dandsena house(Ayurvedic Clinic)to Kanak Durga Mandir in ward No-03
Construction of 1no. of Box Cell Culvert of size (1x8.00m.x5.00m) at 0/140Km. on Talcher Kankili Luhundi road under DMF fund for 2020-21
Construction of Approaches on both sides for Box cell culvert at Basanta Vihar (Near Debraj Bidyapitha) of Drain No 10 in ward no 31
Cleaning of Nayanjori along toe of Left and Right embankment of Puri main Canal from Nuapatna Culvert to Hanspal square of Ward no 4
Const. of drain from Nrusingha Charan house to Pramod Sethy house and Ganeswar Behera house to Culvert, Amalapada 5th lane in ward No.21
Construction of Box Cell Culvert of Darh MIP in Gondia Block of Dhenkanal District under Completion of Incomplete Project for the year 2022-23
RM to road,drain with culvert at the back side of Gyana Misra res. in ward no. 03 (In front of Tripathy babu res.)
Construction of Paver Road leading from Hadabhanga towards Souchalaya culvert and Approach road and Souchalaya front paver block in Ward No-15, Kamakhyanagar NAC
Construction of CCRoad and RCC Drain and culvert from Marandi Babu Res to Santosh Behera res via- g. Uday kumar res in wardno-23
Repair and Restoration of road and Culvert from Sunil Patel house to Sushil Bhainsa house via Balram Bagh house Part I Ward No 4
Maintenance of Bhubaneswarpur to Chhetgaon road such as BT repair,PMC,Seal coat,Repair to HPC culvert from ch. 0/700km to 0/850km
Special Repair to Link road to MV.2 to MV.1 road (Boxcell Culvert) in the District of Malkangiri for the year 2025-26
Construction of RCC culvert (6 x 3 x 2 span) at ch.1.715 Km on Dharambandha to Chulabhat road for the year 2023-24
S/R to Boxcell Culvert at 0.625 K.M. on NH-6 to Bandhabhuin Road in the District of Sambalpur for the year 2023-24.
Construction Of Culvert and Fixing of Drain Slab From Biren Patra House to Via Tapas Panigrahi House to Gopal Khatua House in W - 03
S/R to Boxcell culvert on Local nallah on NH-217 to Gochhapada road in the District of Kandhamal for the year 2024-25.
Special Repair of Repair to Boxcell Culvert (3x6x3) on PWD Road to Damjhola ch.1/000 to 1/300 for the year 2025-26
Construction of RCC drain from backside of Reliance Fresh to Br-579 connecting to railway culvert area, Drain No 5 in Ward No-41
Construction of Box Cell Culvert (1 x 3 x 3) at 12/990 Km of Padmapur - Gobardhan - Jharbelda Road for the year 2025-26.
Construction of C.C Road and Drain and 2 nos of Culvert at Baikuntha Nagar 2nd line Park chhaka to 3rd line Park, w.no-24
Construction of Cement Concrete road with repair of culvert and construction of drain from Rishi Mandap to Subash Mohapatra res in Ward No.47.
Construction of Internal Drain, Culvert and Cover Slab from Club House to Gangua Nallah with sub division in Kimbiria Basti of Ward no 19
Construction of internal Drain Culvert and Cover Slab from Mr. L.D Satapathy to Mr.P.Rout Res near Santoshi Maa Temple in Chakeisiani Ward No 5
Construction of RCC Drain from Revenue Plot no 225 to existing culvert at lane no 3 of jaydev vihar on main drain no 4
Const. of both side C.C drain and R.C.C culvert at main lane jaleswar bihar to jaleswar bihar 2nd lane at in w. no. 28
S/R to B.B.K.S Road S.H-41 such as construction of R.C.C culvert of 3mtr span at 44/450 km at the breach location
Repair to Basta Baliapal Road Such as Construction of Box-Cell Culvert 1x3.00m x 3.00m at Ch. 20.800 km for the year 2020-21.
Construction of RCC Drain and Culvert from Banadevi Das house to Shanti Mandal house at MV-43 (Reach-I) ward no-19 Malkangiri Municipality
RR of Road and Drain with Culvert at bhoi sahi from Shyam Pattanaik Res to Basanti Mandap via Sidheswar Temple Res in Ward No_09
Construction of Box cell culvert of size 1x3.0 M x 2.0M at Ch 1.100km of Old Bhadrak-Bonth road for the year 2024-25
Construction of Boxcell culvert (6 x 3.5) m X 4 Span from PWD Road to Banajhola at Ch.2/500 Km in Nuapada district
Renovation of central haul road from central haul road junction to BLA chowk including 02 nos HP culvert and RCC drain at Bharatpur OCP
Construction of Drain and culvert and installation of RCC slab over old drain from Mahendra Nayak house towards Railway road in Ward No.3
Improvement and construction of culvert on left bank of Left Distributary near RD 14700 m of Baghua Irrigation Project for the year 2024-25.