Loading…
Loading…
2,526 results • Best match
S/R to Box culvert over Local Nallah on 0.1 km on P.W.D Road to Astak for the year 2024-25 in the district of Bhadrak
Construction of Triple cell Box culvert of size (8.00 x 3.00) on Niktimal to Amati road at Ch-5/600 Km for the year 2021-22
Laimura to Panibhandhar Road_Road_Repair to Box Culvert Such as Revement Pitching, protection wall, parapet wall repair,clear of vent and Colouring_At 1.350 Km and 2.710 Km
SH - Kainsar Road Road Repair to Box Culvert Such as Revement Pitching, protection wall, parapet wall repair,clear of vent and Colouring At 1.230 Km and 2.210Km
Development of approach road with construction of 02 nos of Box culvert and side drain to OMAV Rourkela in the district of Sundargarh. (Under PD/CSR Scheme)
Construction of 2nos. of box culvert at Mithagaon Silapokharia Majhi Sahi road from 0/0 Km. to 2/500 Km. under DMF in the District of Keonjhar.
S/R to Garabandha on PWD road (SH-4) to Koinpur via Kinchilingi road (ODR) such as construction of slab culvert at 12/600 km. for the year 2019-20.
Repair and Restoration of RD Road to Dhobabil Via Tarapada Road for the year 2023-24. (RCC Slab Culvert 1X(3.00X2.00)mtr and Approach Road) At R.D-1/425 km.
Improvement to Chhinda Drainage Channel and its link drains along with construction of vented causeway culvert near village Kasarda in Niali Block
Construction of Box culvert at 10.500km on Bedapur-Padhani-Bhagatpur road (ODR) in the District of Bhadrak for the year 2021-22 (2 Span x3.00mtrs x 2.50m) (YAAS)
Palkudar to Dangapathar Road_Road_Repair to Box Culvert Such as Revement Pitching, protection wall, parapet wall repair,clear of vent and Colouring_At 3.320 km, 6.120 km and 6.950 km
Custom Bid for Services - CONSTRUCTION OF RCC DRAIN BOX CULVERT AND RESERVOIR AT SITE 4 n 5 RELATED TO NEERI RECOMMENDATION INSIDE SMELTER PLANT Similar Category Support Services
Extension and Construction of Box-Cell Culvert at Ch. 11/917km and 25/270km and Extension of RCC Slab Culvert at Ch.14/089km of Kariar Road-Amodi-Beltukri Road ODR in the district of Nuapada for the year 2023-24
Execution of Pre cast RCC Box culverts, Pre cast RCC Box Syphon CC RCC Drain, CC RCC Retaining wall etc in Angul Balaram section in connection with Angul Balaram Putagadia Jarapada Tentuloi Rail Corridor of MCRL in the state of Odisha
Improvement to Khadikera minor from RD 00to 3.20km with cement concrete lining from RD 00 to 0.500km,from RD 0.850km to 1.250km and Construction of RCC Slab culvert RD 0.800km.
S/R to Jagalpat to Bolangir border and S/R to 3x2mtr slab culvert approach road on Gaisilet to Kansodol road in the district of Bargarh for the year 2022-23
Making R.C.C Box culvert and R.C.C drain near mines water dischage point at Field time office and approach to WB-11 and 12 of Hingula OCP Under Hingula Area .
S/R to PWD road to Bental road( Construction of Hume pipe culvert) for 2020-21
S/R to Subarnagiri to Parigada road such as construction of RCC Slab culvert of size 1 x 6.00 m x 3.00 m at ch. 3.400 km for the year 2023-24
S/R to Kurtamagada to Dangesiguda road such as construction of RCC Slab culvert of size 1 x 6.00 m x 3.00 m at ch. 1.500 km for the year 2023-24
Construction of RCC Box culvert for Jagatsinghpur Raghunathpur Sirlo Nuagaon Road Raghunathpur to Sirlo Nuagaon at Ch 3 150 km in the district of Jagatsinghpur for the year 2023 24
Third Party Inspection and Quality supervision /control/ assurance for the works Development of new rehabilitation plot with construction of box Culvert and bituminous approach road near PPL main entry gate
Construction of CT road and service road along with RCC Box Culvert etc. from junction of Project Office, LKP OCP to Underpass ROB near MDTP at BOCM of Lakhanpur Area
CANAL STRUCTURAL WORK
Construction work
S/R to Markona-Oupada via Gandibed road such as Construction of RCC Box Culvert(1 x 3.0 x 3.0m) at 0.810 km near Bana Village for the year 2022-23
De-siltation of Bed of Bangaru Nallah of upstream and downstream of new RCC Box Culvert and downstream portion of Steel Bridge of Ananta OCP under Jagannath Area during Monsoon-2023.
Construction of Single cell Box culvert of size (6x2.50) on Niktimal to Bhulupada road at ch-2/050 and Niktimal to Amati at Ch-3/190Km for the year 2021-22
CANAL STRUCTURAL WORK
Construction of Approach road from NAC road to Multipurpose Hall MPH at Khariar Road including a Box Culvert over the existing canal in the district of Nuapada for the year 2023-2024.
Construction of CC approach road with Gantry gate, Drain and box culvert from entry gate to Weighbridge of block A Guali Iron Ore Mines of Barbil Region in the dist of Keonjhar.
Construction of Pedestrian Underpass Box Culvert Minor Bridge and other Road Works between Km 34.510 to Km 35.100 near Vellora Chawk on NH 60 Balasore Kharagpur Section in the State of Odisha
S/R to Kurumunduli to Barasahi road such as 01 no. 600mm dia and 01 No. 1000mm dia HPC, RCC slab culvert 1X2X2m E/W, GSB, and WBM, Gr-II for the year 2025-26
Construction of RCC drain with cover slab from Tofan Nayak Godown to Main road and construction of RCC Box culvert across Main road near Krishna Lodge at Keshpur Bazar in ward No-05
Construction of Box Culvert over Local NALLAH at Ch 167_800 and 171_200 km on Banigochha_Madhapaur_ Khajuripada_ Phulbani_Sarangada (BMKPS) Road on SH_1 in the district of Kandhamal under State Plan for the year 2023_24
Construction of Causeway
CANAL STRUCTURAL WORK
Renovation work, Box culvert, Retaining wall
Renovation work, Box culvert, Retaining wall
Improvement of Haldipada to Solpata Road such as construction of 3nos R.C.C. Box Culvert at 2/439 km 2/869Km 3/899Km under State Plan in the district of Balasore for the year 2022-23.
Construction of Causeway
Torasingh to Panchugaon Road_Road_ Vented causeway At 0.650 Km
SR to Chakapad Chahali road such as reconstruction of damaged culvert approach road and repair to causeway at Ch 9.100Km.for the year 2023-24 in the district of Kandhamal
Construction of 3 Nos of R.C.C. Box Culvert at 2/600 Km, 4/150 Km, 4/350 Km on Haridakhandi Petrol Pump to Andha Pasara Sapua Nallah Road in the District of Ganjam under State Plan
Improvement to Sarangada_Nuagaon_Balliguda Road (SH_1) from Ch. 67_185 Km to 69_900Km, 71_000Km to 88_150Km and 88_900Km to 91_835Km (Except 9 Nos Box Culvert Approaches) in the district of Kandhamal under State Plan for the year 2024_25
S/R TO PBD ROAD SUCH AS CONSTRUCTION OF BOX CULVERT 3X2 MTR AT RD 31.145 KM AND RENEWAL COAT WITH LAYING BC FROM 31.150 TO 31.195 KM AND 32.800 TO 33.750 KM FOR 2024-25.
Laying of R.C.C hume pipe for cross drainage of storm water, sand bags walling and cleaning of R.C.C hume pipe and box culvert locations of mines of Balram OCP during monsoon 2023-24 under Hingula Area.
Structural works over Drainage Channel
S/R to Road Gandhi Chowk to Brajrajnagar Railway Station such as Construction of Box culvert of size (1x6Mx3M) at Chainage 0/200 Km in the District of Jharsuguda under State Plan for the year 2019-20
Construction of RCC box cell drain with one no of RCC box culvert fromCommmunity Toilet at Chandrasekharpur Police Station road towards Kaustov EngineeringCollege ,along backside of Indian Oil Office to R and B in ward no-6