Loading…
Loading…
1,09,787 results • Best match
Providing and laying 450 mm and 300 mm dia hume pipe culvert
Construction of Hume Pipe Culvert Approach of fish farm Bihara Singrauli (M.P.)
Rectification of hume pipe culvert at Rd.0/405 and 0/660
Construction of 600 mm dia hume pipe culvert trenches and catch pit
C/O R/Wall, B/Wall hume pipe culvert metalling and tarring.
C/O hume pipe culvert, metalling and tarring and U shape drain.
SH P/L Hume pipe Culvert 900 mm dia on Various road
Earthwork, GSB, WBM, Tack Coat, B.C, Hume pipe culvert, Road safety Fixtures.
Construction of RCC Hume pipe culvert alongwith wing walls at Rd 0.930
SH ROFD C.O 900mm Hume pipe culvert Kharanja stone soling and B.wall
SH- C/O Hume pipe culvert with wing wall at various Rds.
Earthwork,GSB,WBM,BC,Hume pipe culvert,Retaing wall, road safety fixtures.
Repair of 900mm dia RCC Hume Pipe Culvert at RD 4/000
Repair of 900mm dia RCC Hume Pipe Culvert at RD 11/810.)
R/wall and B/wall, Hume pipe culvert and Cement concrete pavement
Construction of 900 mm dia Hume Pipe culvert at Rd.4/080
SH- C/o 900mm dia Hume pipe culvert in Km 5/200
Construction of wing walls of Hume pipe culvert at Rd 2/465
Maintenance & protection work of culverts & Causeway at ch 208.30 & 210.00kmin Road Connecting NH73 tumkur to AP Border via virupasamudra(SH-184) in pavagada taluk
Zone-1 MSME in Yamunapar Foundry Nagar. RCC on four culverts. Culvert construction work.
Construction of slab culvert from harhar mahadev health school Maruti Nagar across the nalla to connect Vitthal Nagar prabhag no 14 Dhule
LAYING OF CC ROAD & CONSTRUCTION OF DRAINS & RCC SLAB CULVERTS FROM H.NO. 6-2-183/1 TO 6-2-575 TO 6-2-143/4 AND 6-2-90/1 TO EXISTING RCC SLAB CULVERT. IN DIVISION NO . 8 OF MUNICIPAL CORPORATIOIN KARIMNAGAR estimate cost of Rs. 49.50 lakhs
Construction work in Mau district Dubari Gram Sabha on the Barikantha connecting road branching off from the Molnapur Bandha asphalt road a 4 cell 2 x 2 M box culvert at km 1 a 5 cell 4 x 4 M box culvert over the Gobarhi Nala and a 3 cell 2 x 2 M box
Construction of Stop Dam Cum Causeway Malanpur road culvert No.1 GP-Bajrangarh, Block Guna Distt. Guna
Construction of Box culvert in lieu of existing damaged RCC slab culvert at Km. 6/8 (i) of Athimanjeri - Podatturpet - Nagari RS road
Widening, Strengthening to Government Roads including Construction of Box Culvert in lieu of existing Causeway and Reconstruction of Culverts in Tiruchengode (H) (CandM) Sub Division (SLM-96)
RCC Box-Culvert, WBM-III, Carpeting with sand seal coat and other allied works.
Providing CC Pavement to Road No MR-2, MR-4 & CR-2 with CC Drains and CD Works (Culverts) at Autonagar(Phase-I), Nellore SPS Nellore District Sub Work:Construction of 1.50M x 1.50M Box Culvert and Striaghten of existing drain wall upto the culvert near shed no9 at Auto Nagar, PH-II, AN Nellore (2nd call)
Providing Cement Concrete (CC) pavement to different coal transportation roads including 05 (Five) no.s of RCC Box culverts at Gevra Project of Gevra Area (Total Length 9.85 KM) including 05 (Five) years of comprehensive maintenance.
Construction of Irulansandy surplus channel and RCC Box culverts upto Sitheri Main Feeder Channel, Irulansandypet in Bahour Commune, Puducherry. Sub Work 1 Construction of Irulansandy surplus channel for leftout portion of VOC Nagar and Irulansandy
Construction of Permanent campus for IIT Palakkad, under Phase B, External Development works SH: Construction of 3.2km long peripheral road from Kedaram (L1) to YA2 (Residential) block, Storm water drains, Box culverts and RCC stream.
Construction of 2 No's R.C.C Box culverts In viswaroop marg at meesala ganga ratnam house No:2-4-411/1 and Manne yedukondalu House D.No:2-4-1/2 in 27 th ward Amalapuram municipality
Reconstruction Culverts of Pallippuraya Puthiyedathuparambu road between chainage km 2.000 and km 2.800
3x3.00m x 3.00m Box Culvert and C. C. Road at Baishali Jhora of Chadar Line Bhagatpur T.E. of Champaguri G.P. within Nagrakata P.S.
Construction of road from BT College more to Vivekananda Pally with Construction of Box Culvert and Drain within Sikarpur G.P. under Rajganj PS.
Construction of box culvert at k.m. 5.310 of tilaiya drain for water drainage of underconstruction maryada purushottam shreeram ayodhya international airport in district
existing old and damaged culvert by providing i) single cell box culvert without footpath clear span 6.00 m clear carriage way 7.50 m and clear height 5.60 m ii) Double cell box culvert without footpath clear span (2x8.0m) 16.0m clear height 5.60m...
F.D.R. to Parol Bhivandi Road M.D.R.-48, Km. 21/900 to 22/100 (Permanent Repair) Construction of Box Culvert Return Wall Taluka-Vasai, District Palghar.
NIT 926 Construction of approach road with culvert and causeway from Indhawadi to farmers fields under OSP district Khandwa MP
Construction of Box Culvert 3m X 3m on Ververi river at Nazirhat-I G.P. within Dinhata-II P.S. in the district of Cooch Behar.
DEMAGED FACE WALL OF CULVERT CAUSEWAY AND PROTECTION WORK IN BETWEEN KM 1 TO 72 ON NH 347 B
REPAIR AND RESTORATION WORK OF ROAD, BRIDGE AND CULVERT AND VENTED CAUSEWAY UNDER SUB DIVISION SAGAR PAC 50.00 LAKH
Construction of CC Drain and Culvert from Royal Enifeild towards Causeway in Ward No.32 under LRS &BPS Funds
Job 2 Construction of link road to Tibian village Polian Beet from Una Jaijon road Sub Head Construction of embankment, P.L GSB, WMM. Primer coat, tack coat, Premix carpet, seal coat at km. 0-0 to 0-400 and Construction Hume Pipe culvert at RD.0-010
C/O link road from Chhamb Bhujan road to Palagry Village Kangoo ka Johar km. 0/0 to 0/800(SH-C/O P.C.C Retaining wall at various Rds and C/O 900mm dia Hume pipe culvert NP2 at R.D. 0/165 ,0/255 and 0/375).
Construction of road from Beraguba to sialsui by way of P/L 02 Nos. Hume Pipe culvert, providing and laying 75 mm thick WBM Grade II Shingling in single layer in stretches and 75b mm thick WBM Grade III Metalling in single layer km 1st and 2nd
Construction of road from Main Road to Chakli Bianamal Khawas District Rajouri Phase 1st by way of Earth work in cutting filling P L of 150 mm thick GSB, 10 no Hume Pipe Culvert in Km 1st Rd 0 to Km 2nd Rd 1000. Length 2 Km
Construction of Apporach road of Medical Aid Centre MAC Health Sub Centre at Khari Daramsal in Km 1st RD0 to RD 350 , by way of balance Earth Work in Cutting,RWall,BWall,Pucca Drain and 900mm dia Hume Pipe Culvert in different location ,150 mm thi
Construction of road from Main road Danna to Paloudran via Passan Loran,Mandi in Km 1st RD 0 to Km 2nd RD 500 by way of balance Earth Work in Cutting,Providing and Laying of 900 /600 mm dia Hume Pipe Culvert and WBM Grade-II .
Construction of Road from University Road to Shabaza Mohalla via Shimblival Panihad ( Phase 1st ) by way of Earth work in cutting/filling, Construction of R/B Walls, PL of 150 mm thick GSB, 06 no Hume Pipe Culvert in Km 1st Rd 0 to 1000. Length 1