Loading…
Loading…
1,09,787 results • Best match
Construction of link road to village Sathru km 000 to 1300 SH Formation cutting filling CO RCC Hume pipe culvert at RD 0605 and 0705 CO edge wall at RD 0175 to 0200 Breast wall at RD 0240 to 0285 and 0315 to 0350 under SCCP
Construction of Baridhar Garudnag Deothal Chontru road km 0/000 to 4/500 (SH- Tarring in km 0/000 to 2/000 ,V-shape drain in km 0/000 to 2/000 and 900mm dia RCC hume pipe culvert at RD 1/250,1/850,) W P
Construction of 70m Span Motorable bridge (proposed 60 Mtr but actual 70 Mtr and also corrected in Beams Portol) from M/R Breri to Maseeti Mohalla Nonial via House of Master Madan Lal by way of 05 nos. 900 mm dia hume pipe culvert , walling, pucca dr
Construction of 1 No. 900mm dia hume pipe culvert, walling, providing and laying 150mm thick WBM grade-II (Shingling) in two layers (75 mm thick each), 75mm WBM grade-III (Metalling) and 25mm thick OGPC on Potha to Katera road in km 1st and 2nd unde
R/o road on Mehach Dhar to Shilh via Badhar road KM. 0/00 to 8/00 (SH Removal of slips and C/o unlined drain in Km. 0/00 to 8/00 and C/o 900 mm dia hume pipe culvert at RD 0/860)
RR damage to Hingwala Mini Lakadhar Road km 000 to SHCO RWall at RD 0390 to 0405 BWall at RD 0985 to 1030 1/090 to 1125 RWall at RD 2325 to 2340 and CO 900mm Dia Hume Pipe Culvert at RD 2895 both side wing wall
A.R and M.O on NH505A Km 0.00 to 17.00 SH. C.O 600 mm dia Hume Pipe Culvert at RD 5.738 P.F 600 mm dia Hume pipe for drain at RD 5.517.50 to 5.560 R.Peo Chowk and 5.592.30 to 5.602.30 ITBP Diversion Road along with PCC Chamber etc.
Construction of road from Ans Bridge to ADC Office Koteranka District Rajouri Phase 1st by way of Earth work in cutting filling P L of 150 mm thick GSB, 10 no Hume Pipe Culvert in Km 1st Rd 0 to Km 2nd Rd 1000. Length 2 Km
Const of link road Karluhi to Mandholi km 000 to 5500 SH Const of Retaining wall at RD 5150 to 5165 5455 to 5475 LHS 5685 to 5700 RHS and 5690 to 5710 LHS and Const of 900mm dia Hume pipe culvert at RD 5315 under MNP
Construction/Upgradation of road from Kojra Bandichechian to Kamal Dheri via Jhambra by way of balance Earth Work in Cutting in Km 1st RD 750-1000,Providing and Laying of 900 mm dia Hume Pipe Culvert and WBM Grade-II in Km 1st RD 0-1000 .
Construction of 2 No. 900 MM dia Hume Pipe culvert, pucca drain, walling, providing/laying 150 mm thick WBM Grade-II (shingling) in two layers (75mm thick each), 75 mm thick WBM Grade-III (Metalling) 25 mm thick OGPC with seal coat on road from m
Upgradation Construction of road from CRF road Mandi Phagla to MS Bani via Jabri in Km 1st RD 0to Km 2nd RD 500 by way of Earth Work in Cutting,Cross Drainage,Walling , Providing and Laying of 150mm thick WBM Grade-II,900mm dia Hume Pipe Culvert .
Kannauj district me manimau nera Road Km 06 to Golkua Sahilyapur Fuguhabhatta Matauli se GSST par vishesh marammat ka Karya road from in. (Work of CC and drain and 350 mm dia hume pipe culvert in km 14.00 km 15.00) (Chainage 13.50 to 13.80 and 19.57
C/O Link road Village Kajwa Km. 0/0 to 2/150 (SH P/L WBM G-ll, G-lll and M/T alongwith PCC road side drain in Km. 0/0 to 1/0 and 900mm dia hume pipe culvert at RD. 0/090,0/195)
Construction of road from Goursai Mussorie Wala to Near Tarkana via Dorimal in Km 1st RD 0-1000 and Km 2nd RD 0-1000 by way of Earth Work in Cutting and Providing and Laying of 900mm dia Hume Pipe Culvert and 75mm thick WBM Grade-II
Construction of Bhagyanghat Lana Miun road km 0/00 to 3/00 (SH Construction of 900 mm dia Hume pipe culvert along with both side wing walls at RD 1/180 Providing and laying WBM Grading -1 and unlined drain between km 0/00 to 1/500).
M/T on Habban Dhamoon road km 0/00 to 21/465 (SH P/L Soling G-I in Km 9/150 to 10/150 and Construction of 900 mm dia Hume pipe culvert along with both side wing wall at RD 8/0. Under MNp
Construction of road from Panjah to Burshian Km 2nd onward to Mohalla Badri Nath kalakote by way 02 Nos 900mm dia hume pipe culvert providing and laying 75mm thick WBM Gr II Shingling in Single layer an 75mm thick WBM Gr III Metaling in Single l
R/R damages on Prem Nagar Chandog Girdh Sandrol road Km 0/0 to 15/0 (SH- C/O 900 mm dia Hume pipe culvert alobhwith wing wall at RD 9/255 PCC U shape drain at RD 9/200 to 9/330 damages due to disaster.
C.O LINK ROAD KOTLA AMROH ROADTO PATYAL BASTI IN GP AMROH TEHSIL JASWAN DISTT KANGRA HP UNDR INDUSTRIAL CORRIDOR SUBHEAD C.O EMBENKMENT INKM 0.290 TO 0.600 P.L G-I WIRE CRATE AT RD 0.290 TO 0.600 900MM DIA HUME PIPE CULVERT AT RD 0.345 AND C.O
Construction of road from Kanger Morh to Kharuni swari, District Rajouri Phase 1st by way of Earth work in cutting filling P L of 150 mm thick GSB, 08 no Hume Pipe Culvert in Km 1st Rd 0 to Km 2nd Rd 500. Length 1.50 Km
Prmnt Rest. of Sunken Portion Road Darsoo to Guddar, Part-II, JK14-379, Phase-IX, Stage-I,II , at RD 4/500-4/550 Constt. of 1.50 mtr height B/wall with drain, Crated R/wall, RBM filling, Hume pipe culvert incl. Supplying, Laying Inter Locking Tiles.
Construction of Asthana Angura road by way of earthwork in cutting/filling, construction of 04 Nos. 0.90 M Hume Pipe Culvert, walling, Drain, Providing and laying WBM Grade II, WBM Grade III and 25 mm thick OGPC in km 1st RD 0 to km 3rd RD 600
Construction of RCC Drain from 0/000 Km to 1/200 Km and 1 No. Hume Pipe culvert at 0/350 Km on NCC road (from Reserve Police Back Gate to STI Level Crossing) in the District of Sundargarh under State Plan for the year 2024-25
Restoration of rain damages on C.o link road from Darkata Tripal road to Sand in Km 0.0 to 1.500 SH ROFD Construction of Hume Pipe Culvert at RD 0.305 V-Shape Drain at between RD 1.200 to 1.500 Providing and laying Cement concrete pavement from RD 0.
Construction of balance work of Apporach road to MAC Health Sub Centre at Khari Daramsal in Km 1st RD0 to RD 350 , by way of balance Earth Work in Cutting, Wall,B Wall, Pucca Drain and 900mm dia Hume Pipe Culvert in different location ,150 mm thick
C/o link road from Garli Sadvan road to Sat sang Ghar plat Ward No.7 Gram Panchayat Bani (SH C/o 900mm dia hume pipe culvert at Rd. 0/042 and P/l Interlocking concrete block at Rd. 0/0 to 0/154) under MMSY.
Construction of road from Mohra Road to Kathyari Pateli District Rajouri Phase 1st by way of Earth work in cutting filling P L of 150 mm thick GSB, 8 no Hume Pipe Culvert in Km 1st Rd 0 to Km 2nd Rd 1000. Length 2 Km
Restoration of rain damages on Koti Junction to Koti Bridge km 0/0 to 1/640 (SH Providing R/walls at Rd 0/758 to 0/765, and Hume pipe culvert at Rd 0/750 and Parapets at Rd 0/860 to 0/870) (UNDER PDNA-2023)
Job 4 Construction of Tahliwal Bathri road RD.0-0 to 8-0 Sub Head Providing and Laying WMM, DBM and BC at RD.6-570 to 6-885 L 315 mtrs. and Construction of 900mm dia hume pipe culvert at RD.6-735 Under Black Spot
Restoration of rain damages on C.o link road from Gugga Mandir to Harizan Basti GP Haripur in Km 0.0 to 1.500 SH ROFD Construction of Hume Pipe Culvert at RD 0.305, V-Shape Drain at between RD 1.200 to 1.500 Providing and laying Cement concrete pave
Construction of Bye Pass road near DFO Office to Jhanger by way earth work in cutting/filling, 06 Nos 900 mm dia NP3 Hume Pipe culvert, R/wall, B/wall, Pucca Drain, Providing and laying 15cm thick WBM Grade-II in two layers (7.5cm thick each) 75mm
C/o link road from Punjab Boundary to Dehni Upper Nange Thakur and Barota Dhawala Km. 0/0 to 6/765 (SH- C/o 900mm dia hume pipe culvert at RD 0/105, 0/435, 0/640, 0/900, 1/095, 1/225 and 1/450).
C.O OF LINK ROAD FROM MAIN ROAD MASROOR CHATRA MOD TO PADHARBASI VILLAGE UP TO PHC MASROOR VILLAGE KM 0.0 TO 1.00 SH C.O OF HUME PIPE CULVERT AT RD 0.215 AND C.O OF CEMENT CONCRETEE PAVEMEENT FROM RD 0.110 TO 0.265 AND 0.270 TO 0.375 MMGSY
Construction of road from Kandi Mohra Road to Matha Tikka District Rajouri Phase 1st by way of Earth work in cutting filling P L of 150 mm thick GSB, 8 no Hume Pipe Culvert in Km 1st Rd 0 to Km 2nd Rd 1000. Length 2 Km
Construction of 03 Nos. 0.90 M dia Hume Pipe Culvert in km 1st RD 375, 900 and km 2nd RD 350, construction of drain by way of earthwork in km 1st RD 0 1000and R/wall in km 2nd RD 375 425 on Ambligalla to Kheon road.
Construction of road from Dharunyian to Hundi Muri Panhiad ( Phase -1st )by way of Earth work in cutting/filling, Construction of R/B Walls, P/L of 150 mm thick GSB, 06 no Hume Pipe Culvert in Km 1st Rd 0 to 1000. Length 1 Km
Upgradation of road from Thanda to Nari Kalai ,Surankote in Km 1st RD 0 -1000 by way of balance Earth Work in Cutting ,Walling, X-Drainage,900mm dia Hume Pipe Culvert and Providing and Laying WBM Grade-II,WBM Grade-III and 25 mm thick OGPC
Construction of lane from Mata Ambika temple towards Bhaddu link road ward no.1 (Rs.1.00) Construction of Hume pipe culvert and filling of R/wall near Miyan da mohalla ward no.2 (Rs. 1.55) and Construction of lane from PWD link road to house of
Constt of T/road with hume pipe/Culvert from Bhaddu link road to Gujjar basti near house of Mohd Shafi and other ward no. 3 (Rs. 1.55) and construction of lane from house of piyush sharma to Shanti Swaroop house ward no 7 (Rs 1.00) and Constructio
Single Cell Slab Culvert (10.0 m X 3.0 m) at 1.65 km of Belacoba (Battala) - Gatebazar Road, Construction work by replacing damage slab culvert under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD202131104S000.
Construction of Slab Culvert(5.0m X 4 Span X 3.00 m) from CMGSY Road NH 12 to Neelgarh Dhandwani at Chainage 400 m Village Neelgarh, Block Obedullaganj, District Raisen
Special Repair of Construction work of box culvert in place of narrow damaged culvert in Km 01 from Mawana Kithore Hapur road via Randhana Naval Bondra Laliana Gesupur to Meerut Asifabad road ODR
Demolishing of existing culvert of new box culvert size 3m x 3m at chainage 776 mtr in between Garacharama to Bimblitan with wing wall and apron under SD-III, CD-II, APWD, Prothrapur.
Due to heavy rains special repair work of CC and box culvert is being done on the culvert at Ch 3-000 and 3-800 of Tahrauli to Gaata via Gudha link road
Special repair work of Umri-Pathrahi-Jagammanpur to Kanjausa road in Km 24, 25, 26 and In Km 3 Construction of (600 mm) HP culvert In km 18 3x3 cell RCC Box Culvert
Construction work of 1x2 M Span single cell RCC box culvert in place of damaged culvert at Km-1 of Pure Seman to Bindaganj Gokna Link Road via Bargadha Apta under Special Repair
In Kushinagar district, construction of a 1 x 2 meter span box culvert in place of the damaged culvert at km 1 of the Belwa Ghat link road from Atardiha Prime Minister Road
Construction work of 1 X 4 m span box culvert in place of the damaged culvert located at Km-1 of Dhadha Bujurg road via Bhadgawan from Hata Gauri road in Dist Kushinagar
Construction work of RCC box culvert in place of damaged culvert in Chainage 4.65, Chainage 6.40 and Chainage 6.85 of Musafirkhana-Palia, Chandapur, Pindara Thakur-Manshahpur, Gunnaur, Matha, Bhusunda, entire Pahalwan Marg (AD)