Loading…
Loading…
11,179 results • Best match
Construction of RCC Drain with Culvert 100 mtrs Padasalai street in Pulikundram Colony at Pulikundram Panchayat in Thirukkazhukundram Block under (Basic Amenities of SC Habitations) PMAGY Scheme for the year 2025-26
Construction of SWD and Culvert at Padmavathi Nagar 12,14th Street Extn,Padmavathi Ng 15th Street ,Bhuvaneshwari Nagar 2nd and 4th Street Ward No 69 in Zone V at Tambaram City Municipal Corporation.
Krishnagiri District Uthangarai Block Under 15th Finance - 2021-22 and 2024 -25 Construction of 3m Span Culvert at Periyakamatchipatti SC Colony to Chinnakamatchipatti - Chinnaanandhur link road at Thiruvanapatti Panchayat Package No UTG45
Repair works to the existing Drain in the East side of 457.5 E road from CH 0 mtr to CH 175 mtr from Ash Slurry Line Culvert to CAD Mechanical Sub Division
Salem District - P.N.Palayam Block - Construction of Culvert and Production Wall From Pagadupattu Ganadeepam School Kovilkadu (Via) Racodu Road KM 0/275 at Pagadupattu H/O C.K.Hills Therkkunadu- 2022-23. Work No.01
REPAIRS TO DRAIN CULVERT INCLUDING COPING POINTING KERBSTONE AND REPAIRS TO FENCING CHAINLINK FENCING BARBED WIRE POSTS PILLARS GRILLS AND GATES AT ZONE B AND ZONE C OF INS RAJALI NAS ARAKKONAM
Krishnagiri District Krishnagiri Block Under AGAMT II 2022-23 Construction of Link Drainage with Horizontal filter at kamaraj nagar from Prema house to Culvert in Peddathalapalli Panchayat Package No KGI AGAMT 50
Library Cess Fund-CONSTRUCTION OF STORMWATER DRAIN and CULVERT AT ,Saveriyar palaya 1 st lane (078043R1156),Saveriyapalaya 5 th lane (078043R1160)Pichaiyammal cross street (078044S354),Maruthuva sangam theru (078044S352) ,EAST SAVERIYAR PALAYAM
Construction of side Retaining Wall around Knowledge centre near backside of Court complex building in ward no.7 and Rcc Culvert with drain to sj nagar leftout area in ward no.4
TCMC - Construction of SWD and Culvert at Vasantham Nagar 1st ,2nd,3rd and 4th Main Road and 1st and 3rd Cross Street in Ward No.21 Tambaram City Municipal Corporation Zone II
TCMC - Construction of Storm Water Drain with Culvert at Narmadha Street, Pallaru Street, Thiruthani Nagar 3rd Main Raod and 1st Main Road in Ward No.21 Tambaram City Municipal Corporation Zone II
Widening from Intermediate Lane to Two Lane and Strengthening at km 6/0 - 9/6 of Veraiyur Thandarai road including Extra Length of 400m and Reconstruction of culverts at km 6/4,7/0, 7/8 and Widening of Culvert at Km 9/6(i), (ii) -TVM-35
Widg and Impts Impts IRQP Widg of Pipe Culverts ReConstn of Slab Culverts and including Up Keeping for a period of 60 Months on Govt Roads in Vellakovil H C M Sub Dn Pac No 57
PACKAGE 76 Improvements, Improvements to Riding Quality, Reconstruction of culverts and pipe culverts, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Aranthangi H CandM Subdivision
Widening from Two Lane to Four Lane and Strengthening at Km 0/0 - 2/3 of Thirukoilur - Asanur road including Widening of culverts, Reconstruction of Culverts, Construction of Drain and providing paver blocks (SH137)- TVM-84
Bids are invited in package for the Strengthening Of BT Road with Drainage and Culvert at Sannathi Street Sivan Kovil Balakrishnapuram and Balakrishnapuram Kuttai in Keeranur Town Panchayat Pudukkottai District under the TURIP Scheme 2024-25
Construction Storm water drain Culverts at Ward No.09 Karuppar Kovil in Nerkuppai Town Panchayat.
Formation of Road and Construction of Culverts at TANSIDCO Industrial Estate, Paruvathanahalli in Dharmapuri District
Construction of Culverts at Ward No.14, Merkupudhur East AD Colony in Nasiyanur Town panchayat
Desilting the Culverts and Bridges by Engaging Machineries at Km 7.0_17_5 of Inner Ring Road
Construction of Storm water drain and RCC Culvert at Chellammal Colony 2nd Street, 4th cross Street (EB Office Road), Amman Nagar 1st Street, Amman Nagar Kalyana Mandapam Street in ward No.24.
Dismantling and Reconstruction of RCC Culvert and Storm Water Drain at SNVS Layout 1st Cross Street and Construction of Storm Water Drain at SNVS Layout 3rd Cross Street in Ward No 31
Construction of SWD and Culvert at Padmavathi Nagar 12,14th Street Extn,Padmavathi Ng 15th Street ,Bhuvaneshwari Nagar 2nd and 4th Street Ward No 69 in Zone V at Tambaram City Municipal Corporation.Municipal Corporation.
Strom water Drain with Culvert
RCC Culvert and Drain Raising
Construction of culvert at Arithrapazhinchi
Construction of Drain With Culvert
Construction of High Level Bridge in lieu of existing causeway at Km 47 10 of Avinashi Tiruppur Palladam Pollachi Cochin via Meenkarai road SH 19
Sendurai-H-C and M Sub Division Reconstruction of Minor bridge at Km 1.8 of Ananthavadi - Ayyanathur road in lieu of existing causeway-VPM-023
Reconstruction of Minor Bridge at Km 2/2 of Km 17/4 of CKS Road to Karaimanagar (via) Irandamkattalai Road in lieu of Existing Causeway
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS THE RIVER KOSATHALAIYAR AT KM 11/7 OF TIRUTTANI NAGALAPURAM ROAD (MDR-719) IN LIEU OF EXISTING VENTED CAUSEWAY
Construction of a high-level bridge across Coovam river at Padikuppam in lieu of existing bed level causeway connecting Padikuppam road to Poonamallee High Road
Construction of Retaining wall for the work of Construction of minor Bridge in lieu of existing piped causeway at Km 2/10 of Nagadevampalayam Road
Construction of High Level Bridge across Vaigai River at Km 0/6 of Ramanathapuram - Nainarkoil Road to Sakkankudi (via) Vannivayal in lieu of existing causeway
Reconstruction of Minor Bridge at km 9/2 of Krishnapuram-Thondamandurai-Annamangalam Road across Local Odai in lieu of Existing damaged Piped Causeway VPM-67
Veppanthattai-H- C and M Sub Division Reconstruction of Minor Bridge at km 2.6 of Thondamandurai - Vijayapuram Road in lieu of Existing Causeway-VPM-020
Construction of High Level Bridge in lieu of existing causeway at Km 47 6 of Avinashi Tiruppur Palladam Pollachi Cochin via Meenkarai road SH 19
Improvements to Riding Quality to Government Roads including Construction of Minor Bridge in Lieu of Piped Causeway in Edappady (H) CandM Sub Division (SLM-7)
Reconstruction of High level Bridge at Km 5/4 of Emapalli - Kailasampalayam Road to Pappampalayam Road (via) Appanaickampalayam in lieu of existing bed level causeway
Construction of RCC Storm Water Drain and RCC Culvert at Vijayapuram Kuttai to Kangeyam road and at Kangeyam road From Ooty Bakery to Air Refile Shooting Club in Ward No.47
Construction of SWD with Culvert at Ward No 1, Polur Road 7th street(040001R013),Polur Road 7th 1st 040001L002, and Polur Road 7th 2nd street (040001R014 )in Tiruvannamalai City Municipal Corporation.
Construction of Storm Water Drain at Sadiq Basha 2nd cross street (032029R6653), Thiruvalluvar Nagar 2nd Street (032029R6636) Construction of Culvert at Thiru vee ka nagar 60 feet road (032028R1229) in Ward No 29.
Krishnagiri District Krishnagiri Block AGAMT 2024-25 Providing Cement Concrete Pavement with culvert at Eluppamarathukottai and Providing CC Pavement to Poosarikollai street at kuttakollai in Sembadamuthur pt Pkg No 2023-24 KGI 54
Construction of Storm Water Drain, Culvert, Collection Sump and Sewage Water Pumping System at NGGO Colony Srinivasa Nagar East Cross Street-2 North South Road in Division No. 8 of Hasthampatty Ward Office.
Salem District - P.N.Palayam Block - Construction of Culvert and Production Wall From Pagadupattu Ganadeepam School Kovilkadu (Via) Racodu Road KM 1/570 at Pagadupattu H/O C.K.Hills Therkkunadu NNT -2022-23 Work No. 04
Rectification Works to fully damaged 457.5 E BT Road in Unit 4 and 5area from Ash Dyke Gate Culvert towards Unit 5 entrance barricade from CH 125 m to 190 m Reach 3
Salem District - P.N.Palayam Block - Construction of Culvert and Production Wall From Pagadupattu Ganadeepam School Kovilkadu (Via) Racodu Road KM 1/100 at Pagadupattu H/O C.K.Hills Therkkunadu NNT -2022-23 Work No. 03
Raising the damaged flooring and side wall of existing storm water drain along both sides of main and cross roads Reconstruction of damaged culvert at Thiruvalluvar Nagar in Ward No 77, South Zone.
Construction of RCC Culvert at LIC Colony 4th Street, Panchayat Colony Park Street, Subramani Street, Sathyamoorthy Street, MGR Nagar 2nd Street, and MGR Nagar 1st Street in Ward 06 Zone No 1 TCMC
GENERAL FUND 2024-25 CONSTRUCTION OF RCC CULVERT AT 7TH WARD AKS STREET NEAR WORKSHOP MANI HOUSE,NEAR SELVAM DIARY SHOP AND RANI ANNA COLONY NEAR SIVASAKTHI MAHAL OPPOSITE IN CHINNALAPATTY TOWN PANCHAYAT.