Loading…
Loading…
7,010 results • Best match
Construction of a 4 meter span box culvert at Km 16 of the Padrauna Mansachapar Balkudia Pipra road.
Construction of V.R.B. (Box Culvert) at Km 6.800, 9.700 and 11.000 of Gahroo Dy. On place of pipe
Construction of Box Culvert (3x3 m 2 Cell) Mathura Sadabad Jalesar Awagarh Road SH 122 at Km. 47.070
Construction of a (5m x 5m x 4.70m box culvert) on the Khajraha-Ghaghri link road (rural road).
Reconstruction of 1 x 6 mt span Box culvert at Purwa Bighapur road Km 6 on local Nala
Special Repair of 2X2 mtr RCC Single cell box Culvert Span Km 2 of Utehibad Farosa link road
Construction of Box Culvert 3x3mtr. Span 03 cell on ban river at Bankar Nangla to peruwala link road
Construction work of 7x6.00 meter box culvert in Semri to Basura Bhagwatipur Dehla Dhaurahara road (ODR) Km.-19.
Construction of RCC Box Culvert 5x6x4m span Uttrula Pachpedwa Chandanpur (ODR) Link Road km 20 in Distt Balrampur
Reconstruction of the bridge (Box Culvert) near Dhamsinga village at km 94.700 of Agra Canal in district Mathura.
12 - Kasba Baraut ward 20 Ayush Gupta Vakil ke samne Meerapur rajwahe per Box Culvert ka nirman karya.
Estimate for Construction of Box Culvert at km 9.455 of Upper Kosi Canal in Tehsil Sadar, Distt. Rampur.
6.Constrction of Box Culvert 1x1.5 Mtr Span at Kairana Khatauli Morna Road SH 116 in Km 51
Construction of Box Culvert and RCC drain in front of Kendriya Vihar at sector Builders Area, Greater Noida.
Construction of Box culvert over Kikri (Hathi) Stream river on Harewali Kuankhera road Km 19 in District Bijnor
C/o. 6 cell 5x5.00 mtr of box culvert and approach road on Nayandah River in Village Darev.
Construction of Box Culvert under Defence Industrial Corridor Project Aligarh Node in village-Andala, Tehasil-Khair, Distt. -Aligarh.
Ro Janpad jaunpur me Palhamau parajapati basti ke age Dahir nale par pul box culvert par link road
Construction of R.C.C Box Culvert at Km. 2 of Kotra to Sahu Nagla (Village Road) in District Rampur.
New Construction of 1x6 span RCC Box Culvert In place of Hume Pipe on Mehora Road (Km-02).
Construction work of 5x5 7 cell box culvert on Udanti River between Parewa and Hurmujpur in Ghazipur District
C/O Gram sabha arsiya me kuwar nadi par box culvert and approach road and additional approach road
Construction work of a 6X4 span Box Culvert at Chainej-10.650 (KM-11) on the Achhalda Bidhuna Road
Construction work of 5 x 5 x 5 meter Box Culvert in Khajuriya link Road at KM 2
Construction work of 2 x 5 x 5 meter Box Culvert in Sagauriya link Road at KM 2
Construction of an RCC box culvert (6-meter span and 7.50-meter width) in Gram Panchayat Ladpur Bibi
Construction of 3.00x1.00 Mtr. R.C.C. Slab Culvert Benti Gotni road to Sahavpur Via Kuranv Bag Link Road (Year 2022-23)
Protective work of box culverts 1/2 at km 1, 4/3 at km 4, and 5/1 at km 5 in Bhagwanpur Gagalehri
Construction of box culvert to replace damaged culverts with 1 X 3 meter span at km 1 and 2 X 3 meter span at km 2 on the Hata Gauri to Rampur Sohrauna road in Dist Kushinagar
Construction work of 2x(4.00x4.00) RCC box culvert in Place of Pre-Built RCR Culvert in Km-3 of Tola Khangaran to Ikathore Link Road
Reconstruction of box culvert in place of old broken and dilapidated culvert located on Neem river at Km 3 of BB Nagar-Kuchesar link road
Construction work of 2 x 2 meter span box culvert in place of damaged culvert at km 0-1 of Trilokpur Dalit Tola link road.
Construction of 3x3.00 mtr span minor bridge (RCC Box Culvert) in place of the damaged arch culvert at Km 1 on Fattepur Meerabehad link road
Special Repair of 2x2 meter span RCC box culvert in place of damaged culvert located at km 37 of Bhelsar Tikaitnagar Ramnagar Fatehpur Mahmudabad road
Under SR construction of 2x2 2cell Box Culvert in place of damage Culvert at Km1 of AlimapurLr Along Shadi Bhadi Babatpur Km7 of Ghazipur District
Construction of 5x4m span RCC Culvert Box culvert in km 1 Pandu Nadi on Kachanarwa to Bhalukudar via Saraiya link road in Vikash khand Kone
Construction work of box culvert and approach road in place of the narrow and damaged culvert located earlier on Najibpur link road in Ayodhya district
Construction of 3x3 Meter RCC Box culvert in place of old and sakare culvert on Amethi Sangrampur CHandrikan ODR Road Km 1 In District Amethi
Construction work of 2mtr Span RCC Box Culvert in place of damaged Culvert on Behsuma Chandpur Thakurdwara Jaspur road (SH No.-147) in km 79.
Special repair work of RCC box culvert of 1 x 1.50 m span in place of damaged culvert from Sapha to Laudhiya Khurd near Gaushala
Construction of 2x3 Meter Box culvert in place of old and sakare culvert on Barauliya Manmati ODR Road Km 10 Kukrail Nala In District Amethi
Construction of 1x3.00x3.00 mtr RCC Box Culvert in Place of damage culvert at Dighiya Rupamau Via Khadari link road in Km- 1 Under Special repair
Construction work of 1 X 3 m span box culvert in place of damaged culvert at Km-1 of Ramkola Mathouli road in Dist Kushinagar
Construction of 5 x 5.00m span box culvert replacing a damaged culvert located at Km 6 of Paraspur Lagdahan Bajpur Link Road in Km-6.
Construction work of two cell Box culverts and access road of 3 x 3 m span on the Jigana to Sakhopar link road in Kushinagar district IN FY
Construction of RCC Box culvert and Special Repair of Approach Road of culvert at Unnao Kanpur Road to Netua link road in Km 1 and Km 2 -3no. of culvert-
Delhi Yamnotri Marg se Bhanera Khemchand marg par CC evam Slab Culvert ke Sath Vishesh Maramat karya
Special repair of Construction work of 1 x 3 meter box culvert in km 1 of Babhnauli link road
Special Repair of 2X2 mtr RCC Single cell box Culvert Span Km 3 of Kurri to Sikandarkhera link road
Construction work of box culvert at Km 7 of Meerut Parikshitgarh Asifabad Road (Major District Road) in District Meerut