Loading…
Loading…
7,010 results • Best match
C/O District Juanpur ke vidhansabha mungrabadshahpur me gramsabha godhuwa me sharda sahayak badi nahar par saroj basti ke samne 4x4 Mtr box culvert
C/O Gomati brij daivarjan road (ODR) ke km 2 me kshatigrast puliya ke sthan par 5X5X5 Mtr ke Box Culvert in District Ghazipur
Construction of 3x6 M Span RCC Box Culvert , Approach road Add. Approch and Protection Work on Gram Sabha Dullapur Block Nawabganj Tulsipurihanpurwa Sthaniye Nala
Construction work of 6x6 mtr Span Box Culvert at Rewa Road to Old Yamnua Bridge DPS School Omex City Mirzapur Road in Km 7
Construction of a 1 x 2 meter span box culvert at km 1 of the Arjun Dumri Khas Tola link road in Kushinagar district
BEHSUMA CHANDPUR THAKURDWARA JASPUR SH 147 ROAD KM 104 PER STITH LAPAKNA NADI PER SANKRA PUL KE STHAN PER NAYE MAGHU SETU BOX CULVERT
Construction of RCC box culvert (VRB) at km. 0.201, 1.985, 3.620 of Badhaiya mr. and at km. 3.200 of Naya gaon mr. (Lot 12)
Construction of 3x3 mtr. Span R.C.C. Box Culvert on Kalandarha Naala near Bairiha Village under Chaubisi Kamela Datauli (ODR) in Block Haidergarh, District Barabanki.
Construction of Drainage Crossing at km. 0.410, km. 2.500, km. 4.150 and VRB (Box Culvert) at Km. 0.530 of Matiyar Minor in District Siddharthnagar
C/O Vidhan sabha sadar me gram pyare ladlepur ke madhy dahirpur nale par 4X5X5 mtr box culvert Approach road and Additional Approach road
Construction work of 1x3m box culvert in place of completely damaged kerlet on local drain in Km 1 of Hasimpara Sigarjot Ghat link road.
New construction work of bridge on Meerut Asifabad Road, Village Abdullahpur, Rali Chauhan Raisna to Gesupur (Abu Nala Pratham) in District Meerut. (Box Culvert)
Construction of 2 x 6.00 M Span RCC Box Culvert on Paliya Lucknow road to Lalapurwa road (Tansukhpurwa to Gulamau road) in District Hardoi.
C/O Siddikpur jamuhai road and rajpat nagar link road ke madhy nale par 4X5X5 mtr box culvert Approach road and Additional Approach road
Construction of Box Culvert 3x3 mtrs Span with diversion333 at Km 60 Ch-59830 of Sandila Chakalwanshi Bithoor Chaubepur road SH166 over Kalyani river
Construction of 3x6 Mtr. Span RCC Box Culvert, Approch Road at Dhauhara Pitch to Maholiya road in Km 1 in Block Nindura Distt Barabanki.
Construction of 2x2.00 mt span RCC Box Culvert on Canal Branch in Bihar Bhagwant Nagar Buxer Road -MDR-60C- Km-16 Under Special Repair
Construction work of box culvert and access road on Neem river between km- 4 of Ganeshpur Govindpur Dharampur Marg (ODR ) to village Vijay Nagliya
In Year 2025-26 Special Repair work of 2 No. 2x2 Box Culvert work in Sarawan to Gohani link road in Km. 2, 3
District Ghazipur me NH 24 Matasa PMGSY Gangaghat link raod par Kshatigrast puliya ke sthan par 3x4x4 mtr ke box culvert ke Nirman kary
Construction of 1X1.5X1.50 mtr Span Single Cell box Culvert Approach road at Halor-Siwan-Achhai-Lahi Border road in km-7 under Special Repair
Construction of 3 Cell 3x3.00mtr Span Box Culvert, Approach Road and Protection Work on Katghari Sugreev Singh Link Road in Financial Year 2025-26.
Construction work of 2 Cell 3x3 mtr span box culvert- approach road, surkshatamak work at Nagria Fatehpur near old Bisalpur road in Devha river
Gangi laghu setu, Rajpatnagar box culvert etc margo kairage wey me Dudhuda bazar se Ara ke madhya padane wale Electric pole, Transformer Shiffting work
Construction of RCC Box Culvert 6x5.00x5.00 Mtr Span at Bhinga-Ekauna Road (ODR) Km-5 Boodhi Rapti Nadi Year 2024-25 in District-Shravasti
Construction of missing link of Mangolpura Roopchand to Chhoiya nadi 4x4 Mtr. Span 5 cell box culvert, Approach road and additional additional approach road
CONSTRUCTION WORK OF RCC BOX CULVERT OF 7 X 5 X 5 AT KM 1 BMCT TO BANKATA HARNA ROAD IN SANT KABIR NAGAR
Reconstruction work of the Dariyabad Minor Bridge (2 x 6 meter Box Culvert) at Km-4 of the Mubarakpur-Muhammadabad (ODR) in Azamgarh District.
Construction work of Box Culvert at KM 8 of Sahar Rajwaha on Kosi-Shahpur road via Kotvan to Hatana Shekhshahi Kharont in District Mathura
janpad sankabirnagar me dhanghata bidharghat marg se khalepurwa hote huve mbd bandhe tak marg par 2x6x4 mtr span ke box culvert ka nirman karya
C/o Gram Gangaura and Chaudhi Nale ke tire nahar par sakari puliya ke asthan par 4x4x4 Mtr RCC Box Culvert in Distt. Jaunpur
5x6 M Span Minor Bridge Box Culvert and Approach Road and Protection work at Kishanpur Kotgadha Road to Narauli Link Road Km-4 (4)
Construction of 6 cell box culvert of 5x5 meter at kalan nala in Bajahi in District Gorakhpur in FY 2025-26 LOT (1/2)
C/o Ghazipur chochakpur to gosandepur road ke km 6 me badh and ativisti se kshatigrast puliya ke sthan par 2x2,5 sell box culvert
Construction of 4x5 M Span RCC Box Culvert on Raddhepur Sakatpur road to Khumaripur road block Bawan in District Hardoi in F.Y. 2026-27
Construction work in Mau district Dubari Gram Sabha on the Barikantha connecting road branching off from the Molnapur Bandha asphalt road a 4 cell 2 x 2 M box culvert at km 1 a 5 cell 4 x 4 M box culvert over the Gobarhi Nala and a 3 cell 2 x 2 M box
Zone-1 MSME in Yamunapar Foundry Nagar. RCC on four culverts. Culvert construction work.
Construction of box culvert at k.m. 5.310 of tilaiya drain for water drainage of underconstruction maryada purushottam shreeram ayodhya international airport in district
Kannauj district me manimau nera Road Km 06 to Golkua Sahilyapur Fuguhabhatta Matauli se GSST par vishesh marammat ka Karya road from in. (Work of CC and drain and 350 mm dia hume pipe culvert in km 14.00 km 15.00) (Chainage 13.50 to 13.80 and 19.57
Special Repair of Construction work of box culvert in place of narrow damaged culvert in Km 01 from Mawana Kithore Hapur road via Randhana Naval Bondra Laliana Gesupur to Meerut Asifabad road ODR
Due to heavy rains special repair work of CC and box culvert is being done on the culvert at Ch 3-000 and 3-800 of Tahrauli to Gaata via Gudha link road
Special repair work of Umri-Pathrahi-Jagammanpur to Kanjausa road in Km 24, 25, 26 and In Km 3 Construction of (600 mm) HP culvert In km 18 3x3 cell RCC Box Culvert
Construction work of 1x2 M Span single cell RCC box culvert in place of damaged culvert at Km-1 of Pure Seman to Bindaganj Gokna Link Road via Bargadha Apta under Special Repair
In Kushinagar district, construction of a 1 x 2 meter span box culvert in place of the damaged culvert at km 1 of the Belwa Ghat link road from Atardiha Prime Minister Road
Construction work of 1 X 4 m span box culvert in place of the damaged culvert located at Km-1 of Dhadha Bujurg road via Bhadgawan from Hata Gauri road in Dist Kushinagar
Construction work of RCC box culvert in place of damaged culvert in Chainage 4.65, Chainage 6.40 and Chainage 6.85 of Musafirkhana-Palia, Chandapur, Pindara Thakur-Manshahpur, Gunnaur, Matha, Bhusunda, entire Pahalwan Marg (AD)
Construction work of 2 x 3 x 3 meter box culvert in place of damaged culvert no. 1/1 at km 1 of Khiriya Chhatara to Tor link road Under special repair scheme
Construction work of 3/33/0 box culvert and access road in place of narrow damaged culvert in 5/1 km 5 of Mirzapur to Sherpur Pelo Shafipur Badshahibagh road in Saharanpur district.
Construction work of 1 x 3.0 x 3.0 m box culvert and approach road in place of the narrow and damaged culvert located at changeage 0.50 of Dasoli link road in Ayodhya district.
Construction work of box culvert of 06 nos. (4x4) m span in place of damaged culvert located at Km 1 of Mahevaganj Dubagga link road via Baludih from ShamshanGhat in Lakhimpur-Kheri district.