Loading…
Loading…
600 live333 closing this weekmost from CE,Minor Irrigation,BBSR and Minor Irrigation Department
600 results • Best match
Special Repairs to Pilavukkal Periyar Dam Surplus Course in Upstream of confluence point in Periyar river at Khansapuram Village of Watrap Taluk in Virudhunagar District
Epoxy Painting on 24 nos. radial gates with trunnion/motor/hydraulic pump/hydraulic tank/hoist bridge/foot bridge/control panels of 25 nos railing and its auxiliary fitting of Retam Barrage Project Malhargarh Mandsaur under DRIP-II
Construction of Civil works of Barrage and Stilling basin, U/s Plastic cutoff trench, Power Intake Structures, Tunnel, outfall Structure, associated HM works including adit plug, etc and associated works of Link-3 Project in Himachal Pradesh
Improvement and augmentation of raw water supply by laying of raw water pipeline from Jun Jun nallah check weir III to Beodnabad pump house and suction and delivery pipeline from Lallmitti raw water tank
CLEANING OF UG/OH/GLR SUMP OF DIFFERENT CAPACITY INCL CHECK DAM AND CONNECTED REPAIR WORKS UNDER AGE E/M OF GE DSSC WELLINGTON
Special Repairs to Left bank of Surplus Course of Thirumurthi Dam from L.S. 60 m to 200 m in Udumalpet Taluk of Tiruppur District.
Special Repairs to Right bank of Surplus Course of Thirumurthi Dam from L.S. 60 m to 200 m in Udumalpet Taluk of Tiruppur District.
Providing and Installation of pressure filter at Ghee Dam H.W (under Khambhalia RWSS) With 1 years operation and Maintenance Tal-Khambhalia, Dist- Devbhumi Dwarka.
Providing and Installation of pressure filter at Ghee Dam H.W (under Ghee RWSS) With 1 years operation and Maintenance Tal-Khambhalia, Dist- Devbhumi Dwarka.
Working Survey, Design & Construction of Intake Well with Approach Bridge, Providing, Supplying, Lowering, Laying and Jointing various dia. of DI-K9/MS Rising Main Pipelines, RCC Sump, Pump House, Staff Quarter, Compound Wall, Supplying and erecting ... Bhadbhut Barrage (RHS) ...
Replacement of deformed bottom most two roller boxes and fabricating new roller boxes with materials on RF and LF side of Barrage Gate No.2,4 and 12 in phased manner at BKBPH II Vendipalayam in Erode Generation Circle.
RfS for Selection of Solar Power Developer for Setting Up 100 MW Grid Connected Floating Solar PV Power Project at Tansa and/or Modak Sagar Dam on Design-Finance-Build-Own-Operate-Transfer through tariff based competative bidding process.
Construction of Anicut (no. of work 2) &amp MPT (no. of work 1) &amp Farm Pond (no. of work 5) &amp Recharging Shaft for Aquifers (no. of work 1) under MJSA 2.2 in Project Area P.S.- Nainwa
Annual Maintenance of Kempole Dam to Konanuru Road SH-277 from Ch 10.40 to 34.78 & 35.38 to 40.40 Km in Sakleshpur Taluk in the year
Construction of Lepaguda Check Dam over Kurlu Nalla near village Lepaguda in Boipariguda Block of Koraput District under MATY 3.0 for the year 2026-27
Providing and applying Cardium compound after thorough cleaning and grease in the crest gate under sluice gate and gantry crane at Konar Dam, DVC, Konar
Urgent Maintenance an Repairing Work Of Akodra Dam Dewas 2 Project Under Jurisdiction Of Water Resources Sub ivision Kotra 1 For Year 2026 District Udaipur
Repair of Damaged safety wall provided at up hill side slope to protect control room and intake structure of Dam of Chamera-II Power station
Special Repair of Damaged Inverted Concrete Lining of Flip Buckets using High-Performance Concrete (HPC), River Training Works at Nathpa Dam for FY 2026-27
Engagement of an agency for conducting 1-D Multichannel Analysis of Surface Waves (MASW) investigation for Site-Specific Seismic Study for Umiam Stage I Dam
AM 2026-27-Annual maintenance to SWE Dam at Kottakunje across Madhuvahini river in Mogral puthur Panchayath for the year 2026-27-General Civil Work
Providing Formation and BT road and CD works from Ambakanti to Hanuman tanda of Kuntala (M) in Nirmal District (only road on dam is required)
Shotcreting to U/s face, deep pointing to D/s face & Drilling and grouting to Reach-I from Ch 150ft to 1100ft of Linganamakki Dam.
Shotcreting to U/s face, deep pointing to D/s face & Drilling and grouting to Reach-III from Ch. 3130ft to 4500ft of Linganamakki Dam.
Special Repairs to Distributory 1R take off LS 1990m Reach II of Branch Canal in Irukkangudi Dam Canal System in Ettayapuram Taluk of Thoothukudi District.
Rehabilitation of Protection Works of Bin Super Passage at Power Channel of Chilla HEP
GENERAL NON PLAN 2026 27-PyIP Jungle clearing on guide wall tops gallery front and transformer room surroundings and cleaning and painting of water level measuring scale at Pazhassi Barrage for the year 2026 27 General Civil Work 1
Dismantling , supply, delivery of sluice valve flush pipe and high strength hexagonal bolts, nut and washer including fitting and fixing and other tit-bit works at Desilting Chamber of Bindu Barrage, JHP, WBSEDCL in the district of kalimpong-734503.
FDR to Providing Mechanical gate arrangements to Escape sluice of vent size 1.5 X 1.2 m of Surplus weir no.1 of Kobaka diguva tank Kobaka(Hb) of kobaka(Gp) in Yerpedu mandal of Trupathi district.
RANSAI...Ransai Water Supply Scheme Special Repairs to overflow section, Energy dissipation Arrangements, Provision of guide Wall, shifting and extension of drainage Pipeline of Ransai Dam.
Special Repairs to Distributory 1R take off at LS 1990m Reach I of Branch Canal in Irukkangudi Dam Canal System in Ettayapuram Taluk of Thoothukudi District
Flood Management by Engaging Technical Persons and Labourers to keep watch round the clock during monsoon period from June 2026 to January 2027 at Periyar Dam.
Maintaining the 13 Nos. Surplus gates and Regulator shutter arrangements including lubrication and flood management during monsoon period at Periyar dam for the year 2026-27.
Providing Project Management Consultancy Services For The Work Of Engineering, Procurement And Construction (EPC) Work For Construction Of Damanganga Barrage With Bank Protection Across Damanganga River Near Village-Namdha, Ta.Vapi, Dist.Valsad Including Operation And Maintenance For 10 Years.(2nd attempt)
Annual Maintenance of Athani Satti Maheshwadagi MDR from km 17.60 to 25.84 and 26.275 to 27.10 (Barrage approach road ) in Athani Taluka of Belagavi Dist under HOA 3054-04-337-1-10-200 MDR Maintenance for the year 2026-27.
Carrying out 5 Nos Footing load test on River bed material RBM of Giri river with load applied upto 70 tonne m2 on the reinforced concrete footing of size 150 cm x 150 cm complete in all respect for Renukaji Dam Project, Distt Sirmaur HP.
DG Mahad Industrial Area M and R to WSS in Mahad Industrial Area Providing installing testing commissioning Early Warning System with required accessories at Savitri Dam Poladpur
Running and Managing as is where is basis Rest House/ Open Land at Bhawali Dam, Dist. Nashik, Maharashtra on Public Private Partnership (PPP) basis for 49 years
Running and Managing as is where is basis Rest House/ Open Land at Gangapur Dam, Dist. Nashik, Maharashtra on Public Private Partnership (PPP) basis for 49 years
Running and Managing as is where is basis Rest House Open Land at Kasarsai Dam Dist Pune Maharashtra on Public Private Partnership PPP basis for 49 years
Repairing and Maintenance of damaged existing water drain and gabion structure located at upper side of Left and Right Bank of Baira Dam, Baira Siul Power Station
Providing parapet wall for protection of muck of spoil bank along right side of drain of NHC at various RDs under Nangal Dam Sub Division, BBMB Nangal
Engineering,Procurement and construction (EPC)of New Hydraulic Structures (Bhadar-4 Barrage) and Other Allied Activities on a Bhadar River ( Stretch From the 1 km D/S of Upleta-1 CheckDem to the 1 km of Ganod Checkdem) Ta. Upleta of Rajkot Dist
SSI, DESIGN AND CONST OF 55 M MAJOR PMT BRIDGE WITH OPEN FOUNDATION AND PSC BOX GIRDER SUPERSTRUCTURE PROPOSED OVER PARENG KHOLA RIVER AT KM 23.980,EXCLUDING APPROACHES ON ROAD CHALSA-JALDHAKA-BINDU-BARRAGE UNDER 87 RCC/764TF UNDER (P) SWTK STATE WB
eNIT for Round the Clock maintenance for routine breakdown and preventive Maintenance of 4 X 9 MW and 2 X 4 MW TG Sets with all auxiliaries 66 kV Switchyard and Bindu Barrage under Jaldhaka Hydel Project WBSEDCL Dist Kalimpong WB PIN 734503
Construction of road from Saharbera to Anara Rail Station via Tara Ranjandih Dam Kashipur Rajbari Kalajor under Kashipur Block in the District of Purulia (Road Length 30.620 km)
Provision of Boundary Wall at locations prone to encroachment in the approach of Nangal Dam & Kiratpur Yard under SSE/W/NLDM on MRND-DLPC section. (W-Beam Fencing)
Running and Managing as is where is basis Open Land at Kasarsai Dam for Aquatic Tourism Dist. Pune, Maharashtra on Public Private Partnership PPP basis for 49 years
Emergent Repair Renovation of Tilpara Barrage Sub-Division Office Adjacent Section Office Building of Mayurakshi Head Quarters Division under Tilpara Barrage Sub-Division of Mayurakshi Head Quarters Division
Facility Management Services - LumpSum Based - Operation and Maintenance of dam control room of Chamera Power Station-1; O&M of Mechanical Work, O&M of Electrical Work; Consumables to be provided by service provider (inclusive in contract cost)