Loading…
Loading…
4,869 results • Best match
Repairs to Sluice and surplus weir of Govindappa Tank in Elaprolu village, Ibrahimpatnam mandal, Krishna District
Improvements to canal from ch 06.84 to 11.05 of Left Main canal of Kristipadu Pickup weir
Repairs to damaged shutters to Gurivindapudi surplus weir shutters in Venkatachalam Mandal of SPSR Neloore District
Temporary Restroration of Surplus Weir of Kurichedu Big tank Kurichedu Village in Kurichedu Mandal Prakasam District
Improvements to canal from ch 11.05 to 16.775 of Left Main canal of Kristipadu Pickup weir.
Procurement of spares to beacon weir make 5 stage seal water pumps for Ash pump house.
PROCUREMENT OF HIGH PRESSURE PUMP SIMILAR TO BEACON WEIR PUMP MODEL:SDDN 250/350 OF HP PUMP
Repairs to surplus weir of Alavalapadu tank near Alavalapadu village in Vempalli Mandal of YSR District.
Improvements to canal from ch 0.000 to 6.840 of Left Main canal of Kristipadu Pickup weir
Repirs to the surplus weir of Kanumula Tank of Gandhavaram (V) Chodavaram (M) of Anakapalli District
Repairs to surplus weir of Alavalapadu tank near Alavalapadu village in Vempalli Mandal of YSR District.
RENNOVATION OF DIVERSION WEIR AND PROVIDING SUPPLY CHANNEL ACROSS NANDADESIGEDDA NEAR MALLIVEEDHI (V) IN NANDIGAM (M)
Repairs to surplus weir of Vengamambapuram cheruvu near Vengamambapuram (V) of Gudipala(M) of Chittoor District.
Improvements to Dam entrance gate and resetting of cobble stone pavement and other essentials like electrical and toilets in Chakravana Park of TB Dam.
Conceptualization, design and construction of entrance plaza at TB Dam entrance gate of TB Dam (Ornamental SS Barricading on both sides of Main Road)
Construction of Road Dam Near Check Dam at Chilekampalle Village H/o of Chakrayapeta Mandal in YSR Kadapa District, Estimate Cost Rs.25.00 Lakhs
Construction of Security room and boom barrier gate at Dam Power house entrance pertaining to Civil Section Mechanical Sub Division of Dam Power House
Providing temporary illuminations, designs with Bamboo stick electrical illuminations in connection with Srivari Brahmotsavams in ESD K and P Dams, Tirumala for the year 2018-19
Providing Chain link Mesh all along the Boundary in between Valley (downstream of the Dam) and the premises of Theertham Temple at Papavinashanam Dam at Tirumala to avoid throwing of garbage by the Pilgrims in the Dam downstream side
Providing Chain link Mesh all along the Boundary in between Valley (downstream of the Dam) and the premises of Theertham Temple at Papavinashanam Dam at Tirumala to avoid throwing of garbage by the Pilgrims in the Dam downstream side
NEERU - CHETTU - REPAIRS AND RESTORATION OF ALLUR LARGE TANK SLUICES 10 (RAMANNA TANK SUPPLY CHANNEL HEAD SLUICE) AND SURPLUS WEIRS NO.1 AND 2 AT ALLUR VILLAGE OF ALLUR MANDAL IN SPSR NELLORE DISTRICT (Item No.3)
Replacement of falling shutters to Paradhi Anicut system across river Vegavathi near Rompalli (V) in R.B.Puram (M) of Vizianagaram District
Construction of Anicut Across Sarada River U/s of Thummapala Groyne in Thagarampudi(V) in Anakapalli(M) in Visakhapatnam District
Permanent flood damage repairs to pickup anicut to feed Iragampalli Kaluva near Iragampalli (V) in Kothacheruvu (M) of Ananthapuramu Dist.
Annual Maintenance & Restoration of Damaged Revetment portion of Surutupalle Anicut System near Surutupalle Village in Nagalapuram Mandal of Chittoor Dist
Construction of Anicut Across Sarada River U/s of Thummapala Groyne in Thagarampudi(V) in Anakapalli(M) in Visakhapatnam District
Restoration of pickup anicut across Bahuda river Mallakutapalli H/o Galivaripalle in K.V.Palle mandal of Chittoor District (Item No.02)
Construction of Earth Bund in Breached portion of Muniyeru New Anicut of Polampalli (V) of vatsavai(M) in Krishna District
Jungle clearance and Desilting to Main Canal and Distributaries of Gummidigedda Anicut Scheme in Kurupam Mandal of Parvathipuram Manyam District
Providing falling shutters to TPR Narayanapuram Anicut System near Narayanapuram (V) of Burja (M) in Srikakulam District. (APILIP JICA Assistance)
Annual Maintenance of Surutupalli Anicut System for the year 2023-24 near Surutupalli Village in Nagalapuram Mandal of Tirupati District
Permanent flood damage repairs to pickup anicut to feed Iragampalli Kaluva near Iragampalli (V) in Kothacheruvu (M) of Ananthapuramu Dist.
Annual Maintenance of Surutupalli Anicut System for the year 2023-24 near Surutupalli Village in Nagalapuram Mandal of Tirupati District
Neeru-chettu -Construction of check dam with Fibre Reinforced polymer (FRP) Gated check dams across Gajjula Manyam vagu of Thotlacheruvupalli Village, across Kaanuka vaagu of Yerramreddipalli Village, across Chaviti vaagu near Patten chenu of Peddireddipalle village, across Nalla Konda vaagu of Jadadevi Village and across Beeramapalli Vaagu of North Kondayapalem Village in Varikuntapadu Mandal of SPSR Nellore District (Item No.3)
Desilting of silt from the fore shore of prakasam barrage from KM 5.70 to KM 6.500 in Krishna River
Replacement of 4 Nos wire ropes of Spillway gates to Sri Kotla Vijaya Bhaskar Reddy barrage at Sunkesula(V).
Supply and applying Cardium Compound to wire ropes and gear oil to pullies and gear boxes of Gotta Barrage
Construction of SLRB at Km.3.000 on Right Main Canal of Chagallu Barrage of Peddapappuru (M) of Ananthapuramu District.
Operation and Maintenance of Sri.Kotla Vijaya Bhaskar Reddy Barrage at Sunkesula Village Kurnool District for the year 2025-26
Replacement of 4 Nos wire ropes of Spillway gates to Sri Kotla Vijaya Bhaskar Reddy barrage at Sunkesula(V).
Construction of CC wall near pylon on R/s Abutment of Sri KVBR Barrage near Sunkesula(V), Kurnool Dt.
TGP-FDR 10/25 - Temporary Restoration of damaged downstream R/S Flood bank of Sangam barrage in Nellore Dist.
Repairs Servicing and replacement of Mechanical and Electrical components on four arms and embankments of Sir Arthur Cotton Barrage
Replacement of Rubber seals of 15 Nos of Spillway gates of Sri Kotla Vijaya Bhaskar Reddy Barrage at Sunkesula
Annual Maintenance Estimate of Gotta Barrage of B.R.R. Vamsadhara Project Hiramandalam for the year 2025-26 i.e., upt 31.03.2026
Operation and Maintenance of Sri.Kotla Vijaya Bhaskar Reddy Barrage at Sunkesula Village Kurnool District for the year 2025-26
Replacement of Rubber seals of 15 Nos of Spillway gates of Sri Kotla Vijaya Bhaskar Reddy Barrage at Sunkesula
TGP-FDR 10/25 - Restoration of damaged downstream bed Pitching on R/S of Sangam Barrage in Nellore Dist.
Replacement of 3 Nos wire ropes of spillway gates to sri kotla Vijaya Bhaskar Reddy barrage at Sunkesula village
TBHES - Carrying out repairs to the Central Stores and providing flush pointing to the retaining wall in Dam Power House, TBHES, TB Dam (2nd Call)