Loading…
Loading…
4,871 results • Best match
Annual maintenance of providing temporary sheds and barricading for Sri vari Bramhostavams in PPV dam sub-division in Tirumala for the year 2019-20
Annual Maintenance Estimate of Kumaradhara & Pasupudhara Dams at Tirumala for the year 2026-27
Removal of Existing demand falling shutters and Fabrication, supply and fixing of new failing shutters for Anicut at Elaparru on Left Arm across Budameru Major Drain at KM. 47.300 in Vaddigudem (V) in Pedapdu Mandal in West Godavari District
Removal of Existing demand falling shutters and Fabrication, supply and fixing of new failing shutters for Anicut at Elaparru on Left Arm across Budameru Major Drain at KM. 47.300 in Vaddigudem (V) in Pedapdu Mandal in West Godavari District
Annual Maintenance of Right side Control Panel Room with Diesel Generator Sets of including 11 KV C.C. Charges of Pulichintala Project Dam for the Year 2019-20 from 01/04/2019 to 31/03/2020. ( Sub Work: Supply and installation of 1 bore well on ... Project Dam including ...
FDR to Temporary Restoration outlet weirs of supply channel from kurrakaluva to Vikruthamala tank in Vikruthamala village in Yerpedu Mandal of Tirupati distr
Estimate for Preparation of DPR ,detailed investigation ,preparation of detailed drawings and designs for implementation of CADWM OF SGL Thotapalli Barrage Project for taking of CADWM Activities covering all aspects of CADWM as per CWC and CADWM guidelines
Restoration of irrigation system for effective water regulation including Monitoring and management of the Right Main Canal of SGL Thotapalli Barrage Project from Km 8.000 to Km 11.500 near Nidagalli (V) in Seethanagaram (M) of Parvathipuram Manyam District
Restoration of Irrigation system for effective water regulation including Monitoring and Management to Main Canal & Distributary system of New RMC of SGL Thotapalli Barrage Project Package 2 (Km 52.450 to Km 117.890) to improve its Water Carrying Capacity
Restoration of irrigation system for effective water regulation including Monitoring and management of the Right Main Canal of SGL Thotapalli Barrage Project from Km 8.000 to Km 11.500 near Nidagalli (V) in Seethanagaram (M) of Parvathipuram Manyam District
Restoration of Irrigation system for effective water regulation including Monitoring and Management to Main Canal & Distributary system of New RMC of SGL Thotapalli Barrage Project Package 2 (Km 52.450 to Km 117.890) to improve its Water Carrying Capacity
Estimate for Preparation of DPR ,detailed investigation ,preparation of detailed drawings and designs for implementation of CADWM OF SGL Thotapalli Barrage Project for taking of CADWM Activities covering all aspects of CADWM as per CWC and CADWM guidelines
Providing Dust Free BT Renewal Road with Hot mix process from Vinayaka Temple to Prakasam barrage in 37 division of Circle-I Area, Rc.E6-109940/2026.( 15th FCG ADP Improvement of Ambient Air Quality Tied Grant 2024-25)
Providing Dust Free BT Renewal Road with Hot mix process from Vinayaka Temple to Prakasam barrage in 37 division of Circle-I Area, Rc.E6-109940/2026.( 15th FCG ADP Improvement of Ambient Air Quality Tied Grant 2024-25)
Restoration of Irrigation system for effective water regulation including Monitoring and Management to 18R of Vizianagaram Branch Canal RMC of SGL Thotapalli Barrage Project from Km 0.00 to Km 2.100 to improve its Water Carrying Capacity.(2nd Call)
Restoration of irrigation system for effective water regulation including Monitoring and management of the Right Main Canal of SGL Thotapalli Barrage Project from Km 0.000 to Km 4.400 near Ullibhadra (V) in Garugubilli (M) of Parvathipuram Manyam District.
Neeru-Chettu - Reconstruction of surplus weir and improvements to Irrigation channel with CC walls & Desilting for tank bund strengthening and formation of ayacut road of Bodagudipadu old tank in Dagadarthi Mandal of SPSR Nellore District
Construction of water supply system comprising of concrete weir, Intake structure, Pump House, Overhead Tanks and Laying of Pumping and Distribution lines for Kadapa Ultra Mega Solar Park at Mylavaram Mandal, Kadapa District of A.P.
AME for operation and round the clock shift duties at 33/11 KV HT sub-station, GG Dam Park, Tirumala for the year 2018-19
Construction of Protection walls to Pedda vanka vagu check dam and R&B culvert near Kamanoor of kcc system near Duvvur (M) in Kadapa District.
Providing Revetment and protection arrangements to left side and right side of ramp at Km. 0.500 Right side bank of SSG canal under KR Dam
Supply of Three pole MCCB, two pole 06A MCB, two pole 16A MCB and U/V release pertaining to Indoor Section of Dam Power House
Construction of check dam across Local narava near Jallareddy fields in K. Rajupalli (V) H/o K. Rajupalli (GP) in Chakrayapeta (M) of YSR District.
Improvements to check dam across Vadde vanka near Sri K. Raja Mangogarden of Utukurvandlapalli (V) H/o Surabi (V) in Chekrayapeta (M) of YSR District.
Construction of Check dam across Nalla vanka beside M. Gopal Reddy fields near Balijapalli (V) H/o Santhakovvuru (V) of Thondur Mandal of YSR District.
AME for operation and round the clock shift duties at 33/11 KV HT substation, GG dam park in Tirumala for the year 2021-22
Hire charges for arranging temporary illumination to the roads and buildings etc., in connection with Srivari Annual Brahmotsavams-2022 in ESD-K&P dam, Tirumala
AME for operation and round the clock shift duties at 33/11 KV HT substation, GG dam park in Tirumala for the year 2021-22
Construction of Toilet blocks (5 Nos) for Sarva darshan Queue line pilgrims from Batagangamma road Circle to GG Dam Circle along the ORR at Tirumala
CONSTRUCTION OF CHECK DAM ACROSS GAJULERU BESIDE S.VENKATA REDDY LANDS OF KOTHAPALLIVANDLAPALLI H/O KURAPARTHIVARIPALLI GP IN YERRAVARIPALEM MANDAL OF CHITTOOR DISTRICT (ITEM NO.08
Construction of check dam across Kalamala vanka @ Km 1.2 (Approx) on Down stream R&B Bridge near Potladurthi village in Yerraguntla Mandal of YSR District.
Construction of Sri Narasimharaya Sagar (GBR) Project - Formation of loading berm along the D/S of dam from Ch.2950 m to Ch.2965 m
Protection arrangements to D/s right side of Check dam at Kanakanasamma temple of Peddavanka H/o Kangundhi (V) in Kuppam (M) of Chittoor Dist.,
Renewal of approach BT Road from PM Palem last bus stand Jn. to Sambuvanipalem Dam Connecting to Sambuvanipalem ST Village Road in ward no. 04
CONSTRUCTION OF CHECK DAM ACROSS CHINTHAGUNTA LOCAL VANKA BESIDE S.VENKATARAMANA LANDS NEAR CHINTHAGUNTA VILLAGE AND GP IN YERRAVARIPALEM MANDAL OF CHITTOOR DISTRICT.(ITEM NO.18)
Realignment of SSS CPWS Scheme Pipe line across Saddle (KL) dam of Indira Sagar Project Near Nelkota Village in Devipatnam Mandal of East Godavari District
RECONSTRUCTION OF CHECK DAM ACROSS THELLARALLA VANKA BESIDE B.KUMAR LANDS OF ARAVANDLAPALLI H/O V.R.AGRAHARAM GP IN YERRAVARIPALEM MANDAL OF CHITTOOR DISTRICT (ITEM NO.13)
Providing Mini Bus service to the tourists visiting TB Dam and Gardens out sourcing the Mini service for a period of two years (24 Months)
Proddatur Water Supply Improvements Scheme with Mylavaram Dam as source and performance based O&M for 7 years including defect liability period of 2 years
Neeru Chettu - Construction of Check Dam across Thodella Vagu on U/S of Addanki Darsi Road near Mundlamur Village in Mundlamuru Mandal of Prakasam District
Neeru-Chettu - Improvements to existing check Dam-2 across the Pulicat lake salt water creek near Meejuru (V)in D.V.Satram Mandal of SPSR Nellore District
CONSTRUCTION OF CHECK DAM ACROSS GAJULERU BESIDE M. VENKATSUBBAIAH LANDS OF KOTHAPALLIVANDLAPALLI H/O KURAPARTHIVARIPALLI GP IN YERRAVARIPALEM MANDAL OF CHITTOOR DISTRICT (ITEM NO.07)
Construction of Sri Narasimharaya Sagar Project GBR Formation of Relief Wells from Ch 1500 M to downstream of the dam adjacent to all weather road
Construction of Check dam across Balarampalli Vanka, near P.Krishna nail fields, in G.A. Kottala (V) in Palyam thanda (Panchayat) in Pamidi (M) of Ananthapuramu (Dist)
Outsourcing of Operation and maintenance works in Mechanical Section of TB Dam Power House including the driving & minor maintenance of vehicle no.KA 35 B 0333
Supply of human resources labour in HLC No.1 Sub-Division, TB Dam for the period of 12 months from April 2020 to March 2021
Neeru-Chettu - CONSTRUCTION OF CHECK DAM ACROSS MAMIDIKALAVA NEAR ATHIVARAM ON D/S OF VENKATAGIRI NAIDUPET ROAD BRIDGE IN OZILI MANDAL OF SPSR NELLORE DISTRICT.
Electrical power supply to Paidipalem Project for lifting gates and providing lighting arrangements all along the Dam on top of the bund at Paidipalem Reservoir
Construction of check dam across Varikuntapalli Cheruvu Morava vanka near Maddimanu Bavi of Varikuntapalli (V) H/o Surabhi (V) in Chakrayapeta (M) of YSR District.
Hire charges for arranging temporary illumination to the roads and buildings etc., in connection with Srivari Annual Brahmotsavams-2022 in ESD-K&P dam, Tirumala